BOM Component Cost Roll-Up Worksheet for Infor VISUAL
Before a quote or a cost review, many teams rebuild a bill of material in a spreadsheet. This worksheet does the arithmetic for you: quantity, scrap, unit cost and extended cost, with a running total you can export to Excel.
| Component part | Description | UoM | Qty per assembly | Scrap % (%) | Unit cost | Extended cost | |
|---|---|---|---|---|---|---|---|
$39 | |||||||
$23 | |||||||
$8 | |||||||
$4 | |||||||
$1 | |||||||
$1 |
Single-level worksheet. For multilevel assemblies, cost each subassembly first, then enter it as a component line. Scrap % is added on top of quantity per.
BOM cost comparison from your ERP
Optional: we can compare spreadsheet roll-ups to ERP cost for a set of assemblies.
Optional. The tool and every export work without this. No spam.
How to use it
Replace the sample rows with your components. Enter the part number, description, unit of measure, quantity per assembly, scrap percent and current unit cost, from a purchased price or a rolled-up subassembly cost. The extended cost computes for each row and the total updates at the bottom. Add rows for each level you cost, then export to Excel to share with purchasing or finance.
- Use the same unit of measure as the cost
- Cost subassemblies first and enter them as lines
- Add a line for packaging and consumables
- Keep a date for the cost source
The formula behind it
Extended cost for a line is quantity per assembly times one plus scrap percent divided by 100, times unit cost. Total material cost is the sum of extended costs. This matches the usual material roll-up where a scrap or shrink factor inflates the required quantity. The summary shows the average line cost and the highest line, which highlights where purchasing effort pays off.
Reading the result
Sort mentally by extended cost: in most assemblies a few lines make up the majority of material cost, so concentrate on those. If the total differs from your ERP's rolled cost, check unit of measure conversions, scrap factors, phantom assemblies and which cost field (standard, average, last) the system uses. A mismatch often traces to a stale price in one expensive line rather than a general error.
Common mistakes
Typical errors are entering a purchase unit price per box while quantity per is in each, forgetting scrap on cut-to-length materials, and leaving out labor and overhead, which this worksheet does not include. Others use last price for some parts and standard for others, so the total mixes bases. Finally, remember effective dates: a cost taken from an outdated revision of the BOM can mislead the whole review.
Frequently Asked Questions
Does this include labor and overhead?
No, only material lines. Use the part standard cost build-up calculator for labor, burden and outside processing, then add the result as a line for a subassembly.
How do I handle phantom assemblies?
Enter the phantom's components directly in the parent list, since phantoms are not stocked or costed separately. Keep a note that those lines come from a phantom.
What scrap percent should I use?
Use measured yield or purchase overage from history. Common examples are a few percent for machined parts and higher for cut wire, film or sheet nesting.
Can I export it?
Yes. Use the export controls to download Excel, PDF or CSV. The computed extended costs and totals are included.
If you want BOM cost roll-ups produced from live ERP structures at scale, we can build that analysis in your environment.
Related Tools
VISUAL Part Standard Cost Build-Up Calculator
Roll up material, labor, burden and outside cost for one part and see how lot size changes cost per unit.
Costing & FinanceVISUAL Labor Overhead and Machine Burden Rate Calculator
Derive burden rates per direct labor hour and per machine hour, then cost a job on either basis. Includes a volume sensitivity chart.
Discrete ManufacturingInfor VISUAL Engineering Change Notice Template
A fill-in ECN form covering part revision, engineering master and BOM changes, open work order impact and approvals, ready to export.
Discrete ManufacturingVISUAL EOQ and Lot Size Setup Cost Calculator
Compute economic order quantity and see what your current lot size costs per year, with a sweep chart across lot sizes.
More Costing & Finance tools
See all- VISUAL Month-End Inventory Reconciliation Checklist
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
Keep exploring
Free tools
- VISUAL Work Order Material Usage Variance CalculatorEnter order quantity, quantity per, scrap allowance and actual issue to get usage variance, cost variance and yield.
- VISUAL Part Standard Cost Build-Up CalculatorRoll up material, labor, burden and outside cost for one part and see how lot size changes cost per unit.
- Infor VISUAL AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor VISUAL.
ERP fixes and how-tos
- Private AI Layer for Infor VISUAL On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to Infor VISUAL on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
- Infor VISUAL report builder: build a custom work order reportHow to build and customise reports for Infor VISUAL using Crystal Reports and SQL, with a worked work order report example and the common tables involved.
- Infor VISUAL query tool and shop resource maintenanceHow to query Infor VISUAL data safely with SQL or the built-in query options, and how shop resources are defined and maintained for scheduling and costing.
Runs with your ERP
- Infor CPQ and Infor VISUAL (also CloudSuite Industrial): configure, price, quoteHow Infor CPQ is described as integrating with Infor VISUAL and SyteLine, how configurations drive BOMs and routings, with setup steps, pitfalls and AI ideas.
- 1 EDI Source EDI Integration with Infor VISUALHow 1 EDI Source connects Infor VISUAL to trading partners for EDI orders, invoices and ship notices via ION or direct API: setup, pitfalls and private AI.
- Infor VISUAL Shop Floor Mobile for Labor TrackingHow Infor VISUAL Shop Floor Mobile captures clock-ins and labor data from shop-floor devices directly into VISUAL: data flow, setup, pitfalls and private AI.
Guides
- Visual Manufacturing to CloudSuite Industrial MigrationMigrate from Infor Visual Manufacturing to CloudSuite Industrial. Understand architectural differences, data migration steps, and timeline expectations.
- AI Visual Inspection for Manufacturing Quality ControlDeploy AI-powered visual inspection systems in manufacturing. Covers defect detection models, camera setup, ERP quality integration, and ROI benchmarks.
- How to Quote PCB Assembly From a Customer BOMStep by step PCB assembly quoting from a customer BOM: part matching, price breaks, lead time risk, overage and attrition, and quote validity for EMS shops.
Integrations
- How to use ChatGPT with Infor VISUALHow to use ChatGPT with Infor VISUAL data: exports, custom GPT actions over a small API, enterprise data controls, and when a private model is the better fit.
- How to use Claude with Infor VISUALHow to use Claude with Infor VISUAL: connect through an MCP server, choose between the Anthropic API, Bedrock or Vertex, and see what changes for on-prem plants.