Infor VISUAL SQL Query Generator
Most VISUAL report requests start the same way: show me the open work orders that are late. This generator writes that SQL Server query for you from a few fields, so you can paste it into SSMS or a Crystal Reports command.
Fill in
U unreleased, F firmed, R released, C closed, X cancelled.
0 means want date up to today, which finds late orders.
Late and open work orders
-- Work orders by status with a want date on or before a cutoff
-- Verify table and column names against your VISUAL version before use
SELECT TOP 200
wo.BASE_ID,
wo.LOT_ID,
wo.SPLIT_ID,
wo.SUB_ID,
wo.PART_ID,
wo.STATUS,
wo.DESIRED_QTY,
wo.RECEIVED_QTY,
wo.DESIRED_QTY - wo.RECEIVED_QTY AS QTY_REMAINING,
wo.DESIRED_WANT_DATE
FROM WORK_ORDER wo
WHERE wo.TYPE = 'W'
AND wo.STATUS = 'R'
AND wo.PART_ID LIKE '[Part ID starts with]%'
AND wo.DESIRED_WANT_DATE <= DATEADD(day, 0, GETDATE())
ORDER BY wo.DESIRED_WANT_DATE, wo.BASE_ID, wo.LOT_ID, wo.SPLIT_ID, wo.SUB_ID;Table and column names shown (WORK_ORDER, BASE_ID, LOT_ID, SPLIT_ID, SUB_ID, PART_ID, STATUS, DESIRED_QTY, RECEIVED_QTY, DESIRED_WANT_DATE, TYPE) are common in VISUAL databases but can differ by version and customization. Run on a test or read only copy first, and never run ad hoc queries during peak transaction times.
Plain English questions over VISUAL
Optional: see how a read-only assistant can write and show queries like this one on your VISUAL data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Pick the status you want, set how many days from today the want date should be included, and optionally limit by the start of a part ID. The query appears on the right and updates as you type. Copy it into a query tool connected to a read only copy or reporting database. With a days value of 0 you get orders whose want date is today or earlier, which are your late orders. A positive value looks ahead, which is useful for a weekly shortage meeting.
How the query is built
VISUAL identifies a work order by Base ID, Lot ID, Split ID and Sub ID, so the query returns and sorts on all four. The type filter keeps only work orders, since the same table can hold other records. Remaining quantity is desired minus received. The want date comparison uses DATEADD against the current date, which keeps the query reusable without editing dates by hand. The TOP clause protects you from accidentally returning an entire table.
- Join and sort on all four ID parts.
- Filter on type and status explicitly.
- Use DATEADD so dates are relative.
- Cap rows while testing.
Extending the query
To see customer demand behind an order, join to the relevant customer order tables, or add operation and requirement tables to find the blocking material. Add one join at a time and re check row counts, because joins on one to many tables multiply rows and inflate totals. If you need cost, be careful to pick the right cost fields for your costing method, as covered in the VISUAL costing method reference.
Common mistakes
The classic error is joining only on Base ID and merging lots and sub orders. Another is running heavy queries against the live database during production hours. A third is trusting column names from memory. Always check the schema of your own database, because customizations and versions change it. Treat the generated SQL as a starting draft that you review.
Frequently Asked Questions
Will this work on my VISUAL version?
The table and column names are common across many installations, but versions and customizations differ. Check your schema in SQL Server Management Studio before using the query, and test on a non production copy first.
Is any of my data sent to Netray?
No. The generator runs in your browser and only substitutes your entries into text. Nothing is executed against a database and nothing is stored on a server by this tool.
Why does the query sort by four ID columns?
A VISUAL work order is identified by Base ID, Lot ID, Split ID and Sub ID together. Sorting on all four keeps lots, splits and sub assemblies in a stable order and avoids confusing mixed results.
Can I use this query in Crystal Reports?
Yes, as a command or a view definition, though you may prefer to convert the literals into parameters. Keep the same ID columns, and test the report with a small row cap before publishing it.
If you would rather ask questions like which work orders are late and why in plain English, with the SQL shown for review, we can set up a read-only assistant over your VISUAL database.
Related Tools
Infor VISUAL Work Order Status and Structure Reference
A searchable lookup of VISUAL work order statuses, the work order ID structure and the records that hang off a work order, with what each means on the floor.
Other ERPsInfor VISUAL Manufacturing Scheduling Checklist
A practical checklist for finding why VISUAL schedules do not match the floor: calendars, resource data, routings, lead times and release habits.
Costing & FinanceInfor VISUAL Costing Method and Cost Element Reference
A quick reference to the costing methods and cost elements used in VISUAL, how each values inventory, where variances appear and when each fits.
More Developer Tools tools
See all- VISUAL SQL to CSV PowerShell Export Script Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
Keep exploring
Free tools
- Infor VISUAL Open Customer Order Backlog Query GeneratorBuilds read-only SQL for open customer order lines in Infor VISUAL Manufacturing, a backlog summary grouped your way, and a delivery schedule view.
- VISUAL SQL to CSV PowerShell Export Script GeneratorFill in server, database, query and folder to get a ready PowerShell script that exports VISUAL data to a dated CSV for scheduling.
- Infor VISUAL SQL Server Memory Sizing CalculatorEstimate total server RAM and the max server memory setting for the SQL Server behind Infor VISUAL Manufacturing.
ERP fixes and how-tos
- Infor VISUAL query tool and shop resource maintenanceHow to query Infor VISUAL data safely with SQL or the built-in query options, and how shop resources are defined and maintained for scheduling and costing.
- Private AI Layer for Infor VISUAL On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to Infor VISUAL on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
- Infor VISUAL report builder: build a custom work order reportHow to build and customise reports for Infor VISUAL using Crystal Reports and SQL, with a worked work order report example and the common tables involved.
Runs with your ERP
- MachineMetrics Connector for Infor VISUALHow the MachineMetrics VISUAL connector sends work orders to operator tablets and writes labor tickets back over a direct SQL Server link: setup, pitfalls.
- MachineMetrics with Infor VISUAL: Machine Data and Work OrdersHow MachineMetrics machine monitoring syncs work orders, schedules and labor with Infor VISUAL through an edge connector. Setup, pitfalls, alternatives, FAQ.
- 1 EDI Source EDI Integration with Infor VISUALHow 1 EDI Source connects Infor VISUAL to trading partners for EDI orders, invoices and ship notices via ION or direct API: setup, pitfalls and private AI.
Integrations
- How to add AI agents to Infor VISUALHow to add AI agents to Infor VISUAL: a read-first tool layer over the SQL Server database and API toolkit, with human approval before any write-back.
- How to build an MCP server for Infor VISUALHow to build a Model Context Protocol server for Infor VISUAL: tool design, SQL Server access, stdio vs HTTP, permission scoping and audit for any MCP client.