How-toInfor LN 10.7Warehousing / Outbound

Infor LN 10.7 Picking Mission and Picking Profile Setup

Question
infor ln 10.7 picking mission

Also searched as

  • infor ln picking profile 10.7
  • infor ln warehousing picking
  • infor ln outbound picking setup

Short answer

In Infor LN Warehousing, picking is driven by outbound orders that generate outbound advice, then warehouse orders and the pick work that follows. Picking profiles and related warehouse settings control how pick work is grouped and released, so most 'nothing to pick' problems come from item, warehouse or location setup rather than from the pick screen.

Applies to: Infor LN 10.7 with Warehousing active for the warehouse. Menu and session names differ slightly from 10.4 and from non-warehouse-controlled setups.

Get picking working in a warehouse

  1. 1Confirm the warehouse is set as warehouse-controlled with locations, and that items are stocked in locations rather than only by quantity.
  2. 2Define the outbound inventory procedure for the order type, so the order knows how goods are issued from the warehouse.
  3. 3Set up picking profiles and the related warehouse parameters according to how you want pick work grouped, for example by order, by zone or in waves.
  4. 4Release a sales or production order to the warehouse and confirm outbound advice and warehouse orders are generated.
  5. 5Check locating results: if the system cannot find stock in a pickable location, no pick work appears.
  6. 6Open the pick work in the warehouse session or on the handheld, confirm quantity and location, and complete the pick.
  7. 7Verify the downstream step, such as shipment and goods issue, updates inventory and the order status.

The flow behind a picking mission

A picking mission is the practical unit of pick work: take this quantity of this item from this location and move it toward shipping or production. It is the end of a chain that starts with an order line, becomes outbound advice, is turned into warehouse orders and then into pick work.

Because the chain is long, 'why is nothing to pick' is best debugged from the left. Is the order released, was advice generated, did locating find stock, and was the warehouse order released to the floor?

What a picking profile is for

A picking profile expresses the rules for how pick work is created and presented, rather than what is on the order. Think of it as the policy: how to group lines, how to split work, and which rules apply to a warehouse or order type. The exact parameters on offer are version specific, so use the Infor 10.7 warehousing documentation as the authority for field meanings.

Keep profiles few. Many near-identical profiles make behaviour hard to predict and hard to train floor staff on.

Why stock exists but cannot be picked

The common blockers are inventory in a blocked or non-pickable status, stock sitting in an inbound or staging location, lot or serial restrictions, and quantity already allocated to other orders. Check the on-hand by location and status before adjusting any setup.

Handheld and warehouse-order scanning issues are usually permission or device configuration problems, not picking logic problems. Test the same pick from the desktop to separate the two.

Debug order for 'nothing to pick'
1. Order released to warehouse?
2. Outbound advice generated?
3. Locating found stock in pickable locations?
4. Warehouse order created and released?
5. User authorised for the warehouse and device?

Try it here, free

Infor LN Warehousing Tables Reference (whinh, whwmd, whinr)

Open full tool

Table-by-table map of LN 10.x Warehousing: masters, warehouse orders, receipts, outbound advice, shipments, cycle counts, adjustments and inventory transactions.

Common pitfalls

  • !Changing picking profiles in production without testing on one order type first.
  • !Leaving received stock in a staging location and expecting it to be pickable.
  • !Mixing warehouse-controlled and non-controlled items on one order without checking the flow.
  • !Over-allocating through manual reservations that the locating logic cannot see.
  • !Skipping a desktop test when handhelds fail to confirm a pick.

How an ERP-grounded AI assistant handles this

Floor and planning teams ask questions like 'why was this order not picked yet' that cut across orders, advice and stock. A private assistant over your LN data can trace one order through those steps read-only and name the blocking step, with all processing on your own servers. Any change to profiles or stock stays a human decision.

Frequently asked questions

What is a picking mission in Infor LN?

It is the pick work generated from an outbound warehouse order: move a quantity of an item from a location toward shipping or production. It follows from the order, outbound advice and warehouse order steps in Warehousing.

What does a picking profile do?

It holds the rules that shape how pick work is created and grouped for a warehouse or order type. The available parameters depend on your LN version, so confirm field meanings in the 10.7 documentation before changing them.

Why does Infor LN show no pick work for a released order?

Work backwards: check outbound advice was generated, locating found pickable stock, and the warehouse order was released. Blocked inventory status, staging locations and lot restrictions are frequent causes.

Does picking behave differently in LN 10.7 than in earlier versions?

The concept is the same, but sessions and some parameters have changed between versions. Always test on a copy of your data and read the release notes for your exact tools and application level.

Related

How-to

How to process inbound and outbound warehousing orders in Infor LN

Infor LN Warehousing splits every physical movement into inbound (goods arriving, mainly from purchase orders) and outbound (goods leaving, mainly for sales orders), each driven by its own warehouse order type. Inbound runs through intake, inspection if required, and put-away; outbound runs through order release, picking, packing and shipment confirmation, with each stage updating the order status other modules watch.

How-to

How to process a sales order to invoice in Infor LN

In Infor LN a sales order moves from order entry to cash through four linked steps: create and approve the Sales Orders session, release the order lines to Warehousing so a warehouse order is generated, confirm the outbound shipment, and then run the invoicing session that composes and posts the sales invoice to Financials. Each step hands off through an integration document, so a stuck invoice almost always traces back to a missing or unconfirmed step earlier in the chain.

Advanced

How to diagnose and fix a slow Infor LN session

A slow Infor LN session is usually caused by an unindexed or overly broad database query, unarchived data bloating a transaction table, or resource pressure on the Java application tier, and occasionally by a recently added custom DAL2 handler. The fix starts with isolating which tier the delay is actually in rather than guessing at a solution.

Error fix

Infor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix It

A bshell process pinned at 100% CPU on the Infor LN application server almost always means one session is stuck in a 4GL loop, scanning an unindexed table, or waiting on a database lock. End the session from the Sessions Monitor first, then kill the OS process only if that fails, and check for a blocking database transaction before assuming it is a bug.

Error fix

Infor LN Not Authorized to Run This Session: How to Fix It

Infor LN refuses to open a session with a not authorized message when the logged-in user's assigned role does not include that session, or when the session is blocked for the company they are logged into. Grant the session through Common > Authorization Management > Roles, or check the user's role and company context, and the session opens on retry. In most cases this is a permissions configuration issue, not a bug.

Error fix

Infor LN DAL Out of Sync After a Custom Field: Cause and Fix

Infor LN throws a DAL, or table, out of sync error, or simply drops a new custom field silently, when a table's dictionary definition is changed but the generated DAL and dependent forms are not regenerated afterward. Running the standard sequence, table compile, DAL generation, then session/form compile, in Tools > Development after every dictionary change resolves it. Skipping any one of the three steps is what causes the mismatch.

AI for ERP

AI for Infor LN: Sessions, BODs, and Engineer-to-Order Work

Add grounded AI to Infor LN 10.x or CloudSuite: natural-language answers over sessions and BODs, agents for project and engineer-to-order work, on-prem options.

AI for ERP

AI for Infor LN in Aerospace and Defense Manufacturing

AI grounded on Infor LN project, contract, and configuration management data for aerospace and defense manufacturers, with on-prem deployment for ITAR.

Stuck on Infor LN 10.7?

Talk to engineers who work inside Infor LN 10.7 every week, and who build private AI that answers these questions from your own ERP data.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Software