Weibull Reliability and B10 Life Calculator
Weibull analysis is the standard way to describe life data. If you already have a shape and scale from your data, this calculator gives reliability, B-life and hazard rate in seconds.
Your numbers
Below 1 is infant mortality, near 1 is random failure, above 1 is wear-out.
Characteristic life: time by which 63.2% of units have failed.
Your results
Two-parameter Weibull with no failure-free period. Parameters should come from a fitted life data set with stated confidence.
Reliability (%) vs mission time
Sweeps Mission time from 100 to 20000, holding your other inputs fixed.
Life data from maintenance records
Optional review of assembling run hours and failures from your ERP maintenance module.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter beta and eta from your fitted data, then a mission time in the same unit as eta. Choose which B-life you need; B10 is the time by which 10 percent of units are expected to fail and is common for bearings and rated components. The chart sweeps mission time to show how reliability decays and where it crosses your requirement.
The formulas
Reliability is R(t) = exp(-(t/eta)^beta). The B-life for failure fraction F is t = eta times (-ln(1-F))^(1/beta). The hazard rate is h(t) = (beta/eta)(t/eta)^(beta-1). When beta equals 1 the model reduces to the exponential distribution with constant hazard. At t = eta, reliability is about 36.8 percent regardless of beta.
- Beta below 1: failure rate falls with time (infant mortality).
- Beta near 1: random failures, age does not matter.
- Beta above 1: wear-out, preventive replacement can pay off.
Linking to FMEA occurrence
A failure probability at a mission time supports an occurrence rating for a DFMEA cause. State the mission profile and confidence in the rating justification. For a repairable system, Weibull on first failures differs from system-level rates, so keep the data set consistent with the question you are asking.
Common mistakes
Fitting a Weibull to too few failures gives wide confidence bands, so the single-point answer here may look far more precise than it is. Mixing failure modes in one data set often produces a beta near 1 that hides a wear-out mode. Also remember to treat suspended (still running) units correctly when fitting.
Frequently Asked Questions
What does B10 mean?
B10 life is the time by which 10 percent of a population is expected to fail, so 90 percent are still working. It is widely used for bearings and rated mechanical parts.
What if beta is exactly 1?
The distribution becomes exponential with constant failure rate 1/eta. Reliability then equals exp(-t/eta) and MTBF equals eta.
Can I use cycles or miles instead of hours?
Yes. Use one unit consistently for eta and mission time. The hazard output will then be per that unit.
How do I get beta and eta?
Fit them from failure and suspension data using median rank regression or maximum likelihood in a statistics tool, then enter the fitted values here.
Netray can pull run hours and failure events from maintenance and quality records in your ERP to build the life data set for this analysis.
Related Tools
FIT Failure Rate to MTBF Conversion Calculator
Convert a FIT rate to MTBF, expected failures per year across a fleet and the reliability over a mission.
Engineering & PLMSeries and Parallel System Reliability Calculator
Multiply component reliabilities in series, add redundant parallel units to the weakest block and see how system reliability responds.
Quality & InspectionZero-Failure Reliability Demonstration Sample Size Calculator
Find the number of units that must survive a test with no failures to claim a reliability level at a chosen confidence, and the total test effort.
Quality & InspectionFMEA RPN Reduction What-If Calculator
Compare the current RPN with the RPN after a proposed action, and sweep the new detection rating to see how much each step of improvement is worth.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
- Cloud MRP BOM Data Cleanup Worksheet
Keep exploring
Free tools
- Preventive Replacement Interval Cost Calculator (Weibull)Compare cost per hour of age-based replacement against run to failure for a wear-out component, with an interval sweep chart.
- Optimal PM Interval Calculator (Weibull Cost Model)Compute the PM interval that minimizes cost per operating hour for a wearing-out component, and see what your current interval costs you each year.
- FIT Failure Rate to MTBF Conversion CalculatorConvert a FIT rate to MTBF, expected failures per year across a fleet and the reliability over a mission.