WPS Template: Welding Procedure Specification Form
A welding procedure specification tells the welder exactly how to make a qualified weld. This template captures the standard fields in a clean document you can export to PDF or Word and adapt to your code.
Fill in
WPS Template (Welding Procedure Specification)
Welding Procedure Specification
Company: Acme Fabrication Ltd WPS No.: WPS-GTAW-001 Revision: 0 Date: 2026-10-20 Governing code: ASME IX Supporting PQR: PQR-001
Process and joint
Process: GTAW
Joint design: Single V-groove butt weld, 60 degree included angle, 2 mm root gap, 1.5 mm root face. Backing: none.
Base metal
Specification and grade: ASTM A106 Gr B Thickness range: 5 mm to 25 mm Diameter range: Over 60 mm OD
Filler metal
Classification: AWS A5.18 ER70S-2 Size: 2.4 mm
Position, preheat, PWHT
Position: 6G, progression uphill Preheat and interpass: Preheat 10 C minimum, interpass 250 C maximum PWHT: None
Gas and electrical characteristics
Gas: Argon 99.99 percent, 12 to 16 L/min; purge argon for root
Parameters: DCEN, tungsten 2.4 mm 2 percent lanthanated. Root: 90 to 120 A, 10 to 12 V. Fill: 110 to 150 A, 11 to 13 V. Travel speed 80 to 150 mm/min.
Technique
Stringer beads, back gouge or grind not required, interpass cleaning by wire brush, max weave width 3 times filler diameter.
Parameter record
| Pass | Process | Filler size | Current (A) | Voltage (V) | Travel speed |
|---|---|---|---|---|---|
| Root | GTAW | 2.4 mm | |||
| Fill | GTAW | 2.4 mm | |||
| Cap | GTAW | 2.4 mm |
Approval
Starting point only. A WPS must follow the governing code, and its ranges must be supported by a qualified PQR. Variables such as essential, supplementary essential and nonessential differ by code. Verify against the current edition before use.
Weld document control in your ERP
Optional: discuss linking WPS, PQR and welder records to production orders.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in the process, joint design, base metal, filler, position, preheat and electrical ranges. Reference the supporting procedure qualification record. The parameter table lets the welder record actual values per pass. Export to PDF for sign-off or to Word if your quality system needs custom layout.
- Give ranges, not single values, where the code allows
- Reference the PQR that supports each range
- Add revision control for every change
- Attach joint sketches
What a WPS must contain
Codes such as ASME Section IX, AWS D1.1 and ISO 15609 require variables like process, base metal group, thickness and diameter range, filler classification, position, preheat and interpass limits, PWHT, shielding gas, current type and polarity, and technique. Essential variables need requalification if changed. This template follows that structure without copying any code text.
WPS, PQR and welder qualification
The PQR records what was actually welded and tested to prove the procedure. The WPS is the instruction derived from it. The welder performance qualification proves each welder can follow it. Keep all three linked by number so an auditor can trace a production weld back to a test.
Common mistakes
WPS documents fail audits when ranges exceed what the PQR supports, the revision is missing, the filler classification is vague, or the position is not specified. Another frequent error is copying a WPS between codes without checking variable differences.
- Ranges wider than the PQR supports
- No signature or date
- Missing interpass maximum
- Mixed codes on one form
Frequently Asked Questions
Is this template compliant with ASME IX or AWS D1.1?
It follows the common field structure but is not a code form. Compliance depends on your values, supporting PQR and the current code edition. Use it as a starting document and check each variable against the code you work to.
What is the difference between a WPS and a PQR?
The PQR is a record of a test weld and its mechanical test results. The WPS is the written instruction, with ranges, that a qualified PQR supports. One PQR can support several WPS documents within the allowed variable ranges.
Who signs a WPS?
Usually the welding engineer or coordinator prepares it and a responsible person approves it. The code may require that the manufacturer certify the PQR. Third party inspectors or authorized inspectors may review it for pressure or structural work.
Can I export it to Word?
Yes. The tool exports to PDF, Word, Excel and CSV. Use Word if you want to add sketches, company headers or numbering that fit your quality management system.
If you manage WPS, PQR and welder records across plants, Netray can help link them to work orders and traveler data in your ERP.
Related Tools
PQR Template (Procedure Qualification Record)
A fill-in PQR with actual test weld variables, tensile, guided bend and Charpy results, and certification block.
Safety & WorkforceWelder Qualification Record Worksheet (WPQ Tracker)
An editable register of welder performance qualifications with process, position, WPS, test date, last weld date and days since last use.
Engineering & PLMPreheat Temperature and Carbon Equivalent Calculator
Enter steel chemistry to get IIW carbon equivalent, Pcm and an indicative preheat temperature adjusted for thickness.
Quality & InspectionWeld Inspection Checklist (Before, During and After Welding)
A four-stage checklist for weld inspection: documents, fit-up, in-process control and final visual and NDT checks.
More Quality & Inspection tools
See all- Weld Repair Procedure Template
- Welding Nonconformance Report Template
- Welding Consumables Issue Log Worksheet
- Weld Joint Log and NDE Tracking Worksheet
- NDT Weld Inspection Request Template
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
Keep exploring
Free tools
- Welding WPS and Welder Register SQL GeneratorFill in table names and the expiry window to get create-table, insert and expiry-report SQL for a welding register.
- Welding Shielding Gas Selection ReferenceLookup table of typical shielding and purge gases by welding process and base metal, with effect and caution notes.
- Welding Cost Calculator (Per Meter and Per Joint)Turn weld metal weight, deposition rate and shop rates into filler, gas, labor and total cost per meter of weld.
Guides
- WPS and PQR Management Software for Welding ShopsHow welding shops manage WPS, PQR, and welder qualification records: AWS D1.1 and ASME IX basics, common audit gaps, and what software and AI can safely do.
- Weld Documentation and Compliance for Metal Fabrication ShopsWPS, PQR, welder qualification, CWI sign-off and material certs: what fabricators must document for AWS D1.1, D9.1 and customer audits, and how to track it.
- How to Estimate Welding Cost for a Fabrication QuoteHow fabricators estimate welding cost: weld volume, deposition rate, arc-on time, filler efficiency, and where AI helps pull actual hours from past jobs.
AI on your ERP
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
- AI for ERP in Metal Fabrication: Nesting, Traceability and QuotingPrivate AI on your ERP for fab shops: nesting yield, remnants, MTR and heat traceability, weld procedure records, outside processing and quote turnaround.
Manufacturing hubs
- American Welding Society and welding fabrication: codes, records and ERP realitiesAmerican Welding Society codes, CWI certification and fabrication shops: D1.1, D17.1, WPS and welder records, plus the ERP, quoting and private AI problems they face.
- FMA and the metal fabrication ecosystem: shops, standards and ERP realitiesThe Fabricators and Manufacturers Association serves metal fabrication, stamping and tube and pipe shops: ecosystem, standards, ERP and private AI.