Epicor field service management implementation: scope and partner selection

Epicor Kinetic's field service capability covers service calls, service contracts, warranties, RMA processing and service jobs that use the same job, labor and material structures as production, and Epicor also sells mobile tools for technicians. A good implementation partner connects these to your installed base, billing and parts inventory, and is honest about when a dedicated field service platform integrated with Kinetic would serve you better.

When this makes sense

  • You manufacture equipment and service it in the field, and service work lives in spreadsheets outside Epicor.
  • Warranty claims and service contracts are not tracked against serial numbers, so you cannot tell what is covered.
  • Technicians fill in paper job sheets and labor and parts reach Epicor days late.
  • Leadership wants service revenue and margin visible next to product revenue.
  • You are evaluating whether to extend Kinetic or buy a separate field service platform.

What the engagement covers

Installed base and serial tracking

Serial number tracking from production and shipment so each unit at a customer site has history, warranty and contract coverage.

Service Call Center

Service call entry, call types, problem and resolution codes, and the link from call to service job.

Service contracts and warranties

Contract types, billing schedules, coverage rules, warranty codes attached to parts and units, and renewal handling.

Service jobs, labor and parts

Service jobs using Kinetic job, labor and material transactions so costs flow into job costing and invoicing.

RMA and depot repair

RMA Processing for returned units, inspection, disposition and repair jobs.

Mobile technicians and scheduling

Mobile capture of time, parts and signatures through Epicor's mobile offerings or an integrated field service app, plus dispatch rules.

How it runs

  1. 1

    Service process design (2-4 weeks)

    • Map call-to-cash and warranty processes
    • Define installed base data requirements
    • Decide Kinetic-native versus integrated platform
  2. 2

    Configuration (4-8 weeks)

    • Configure call center, contracts, warranties and RMA
    • Set up service job templates and billing
    • Configure mobile or integration
  3. 3

    Data load (2-4 weeks)

    • Load installed base with serials and sites
    • Load active contracts and warranty dates
    • Reconcile with finance
  4. 4

    Pilot and rollout (3-6 weeks)

    • Pilot with one team or region
    • Train dispatchers and technicians
    • Roll out and monitor billing accuracy

What you get

  • Field service process maps from call to invoice
  • Installed base data model and load files
  • Contract and warranty configuration workbook
  • Technician mobile workflow guide
  • Service KPIs: first-time fix, response time, contract margin

What drives cost and effort

Installed base data qualityMissing serials or customer sites must be rebuilt from shipment records, often the largest effort.
Contract varietyMany contract types, billing schedules and coverage rules add configuration and testing.
Mobile requirementsOffline capability, parts consumption from van stock and signatures add mobile and integration work.
Integrated platform versus nativeA separate field service platform adds integration effort but may provide stronger scheduling and mobile features.
Technician count and regionsMore teams mean more training, dispatch rules and rollout waves.

Fixed-scope native implementation

Companies with standard call, contract and warranty processes inside Kinetic.

Phased program with integration

Large service organisations combining Kinetic with a dedicated scheduling or mobile platform.

Advisory then internal build

Teams with strong Epicor admins wanting design guidance and review only.

Questions to ask any Epicor consultant

Have you implemented Epicor field service and RMA, not just production modules?

Field service is a smaller specialism; experience in it is not guaranteed.

How would you build our installed base from existing data?

Without accurate serials and sites, contracts and warranties cannot work.

When would you recommend a separate field service platform?

A neutral partner should explain the trade-offs rather than defaulting to one answer.

How do technicians record time and parts in the field?

Mobile capture drives data timeliness and billing accuracy.

How are service costs and revenue reported?

Service margin visibility is often the business case.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Installed base is incomplete at go-live.

Start data reconstruction early and prioritise active contracts.

Technicians bypass the mobile app.

Involve technicians in workflow design and keep mobile steps minimal.

Warranty rules misapplied, causing unbilled work.

Test warranty and contract scenarios with finance before rollout.

Dispatch needs outgrow native tools.

Define scheduling requirements early and evaluate integration options.

If you have a small service team doing occasional repairs, basic service jobs and RMA in Kinetic configured by your admin may be enough. If scheduling hundreds of technicians with route optimisation is the core need, a dedicated field service platform integrated with Kinetic may fit better. A partner helps most when contracts, warranties and installed base need to be built properly from the start.

Frequently asked questions

Does Epicor Kinetic include field service?

Kinetic offers field service functionality covering service calls, contracts, warranties and service jobs, and RMA processing. Confirm which modules are in your licence with Epicor.

Can technicians use Epicor on mobile devices?

Epicor offers mobile options, and the Kinetic browser UI works on tablets. Offline and van-stock needs may still call for a dedicated mobile field service app integrated with Kinetic.

How are warranties tracked?

Warranty codes are attached to parts and serialised units, and coverage is checked when service calls or RMAs are entered.

How long does a field service implementation take?

Commonly a few months for a native setup, longer when installed base data must be rebuilt or a separate platform is integrated.

Where can Netray help?

Netray engineers with partner Epicor specialists design and implement the service setup and can add AI that answers technician questions from manuals and service history on your own infrastructure. People review every change.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.