Choosing an Epicor partner for manufacturing

Epicor Kinetic is built for discrete manufacturers, especially make-to-order, configure-to-order and mixed-mode shops, with job management, MRP, scheduling, MES, quality and costing in the core product. The right manufacturing partner proves they can model your methods, burden rates and planning parameters, not just configure screens.

When this makes sense

  • Job shops and contract manufacturers that quote and build to order
  • Configure-to-order manufacturers needing the product configurator or Epicor CPQ
  • Manufacturers struggling with MRP noise, unrealistic schedules or late jobs
  • Regulated manufacturers needing lot and serial traceability, inspection and corrective action
  • Companies evaluating Epicor against other manufacturing ERPs

What the engagement covers

Methods and engineering

Engineering Workbench, multi-level methods, operations, resource groups, subcontract operations, revisions and ECO workflows.

Job management

Job entry, make-to-order linking, job scheduling, material issue and backflush, labor capture, job closing and WIP.

MRP and planning

Part planning parameters, lot sizing, safety stock, MRP run frequency, planning time fences and suggestion review.

Scheduling

Finite and infinite scheduling, Scheduling Board, Advanced Planning and Scheduling where needed, and capacity calibration.

Shop floor and MES

Data Collection or Advanced MES for labor, machine monitoring and production reporting.

Quality and traceability

Inspection plans, NCRs, DMRs, corrective actions, lot and serial tracking for regulated industries.

Costing

Burden rates, costing methods, cost rollups and variance analysis.

How it runs

  1. 1

    Fit evaluation (2-4 weeks)

    • Scripted demos with your parts and jobs
    • Review MRP and scheduling fit
    • Identify gaps and add-ons
  2. 2

    Partner selection (2-4 weeks)

    • Compare manufacturing references
    • Interview proposed consultants
    • Review approach to MRP and costing
  3. 3

    Manufacturing design (4-8 weeks)

    • Model methods and resources
    • Define planning parameters
    • Design labor and quality processes
  4. 4

    Prove it in pilot (3-6 weeks)

    • Run jobs end to end
    • Check costs against actuals
    • Validate schedules with planners

What you get

  • Manufacturing fit and gap analysis
  • Partner scorecard weighted for manufacturing depth
  • Method and resource model for representative parts
  • Planning parameter recommendations
  • Pilot results with cost and schedule validation

What drives cost and effort

Manufacturing modeEngineer-to-order and configure-to-order need more design than repetitive make-to-stock.
Scheduling ambitionFinite scheduling and APS need accurate data and more tuning.
MES and machine integrationShop floor terminals and machine data add hardware and integration work.
Regulatory requirementsTraceability and quality workflows add configuration and validation.
Data quality of methodsInaccurate routings and times lead to bad schedules and costs.

Fit assessment then implementation

Buyers still deciding on Epicor who want a short paid evaluation.

Manufacturing specialist plus general partner

Complex shops where scheduling or MES needs niche skill.

Optimization project

Existing Epicor users fixing MRP, scheduling or costing.

Questions to ask any Epicor consultant

Show us how you would model one of our complex parts in Engineering Workbench.

Method modeling is central to costing and scheduling.

How do you tune MRP to reduce noise?

Planners abandon MRP when suggestions are unrealistic.

What is your experience with finite scheduling and APS?

Scheduling projects fail without capacity calibration.

How do you validate job costs in pilot?

Costing errors flow into margins and financials.

Have you implemented traceability for regulated customers?

Lot and serial tracking must be right from day one.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Unrealistic routings

Validate standard times with actuals before go-live.

MRP noise

Tune planning parameters and review suggestions with planners.

Scheduling distrust

Start with infinite scheduling and move to finite once data is clean.

Costing surprises

Compare pilot job costs with known actual costs.

If your manufacturing is simple make-to-stock with stable routings, a general Epicor partner can handle it. Specialized manufacturing partners matter most for complex scheduling, configurators, MES and regulated traceability.

Frequently asked questions

Is Epicor good for manufacturing?

Epicor Kinetic is designed for discrete manufacturing and is widely used by job shops and make-to-order manufacturers. Fit depends on your mode, scheduling needs and industry requirements.

Does Epicor handle MRP and scheduling?

Yes. Kinetic includes MRP and scheduling, with options for finite scheduling and advanced planning. Results depend heavily on accurate data and planning parameters.

What is Epicor Advanced MES?

It is Epicor's manufacturing execution add-on for machine monitoring and production tracking, used where basic labor data collection is not enough.

Can Epicor support regulated manufacturing?

Kinetic supports lot and serial traceability, inspection and corrective actions. Validation and compliance are your responsibility, supported by configuration and procedures.

How does Netray help manufacturers on Epicor?

Netray builds private AI over Epicor manufacturing data and works with partner experts on MRP, scheduling and costing improvements.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.