How to evaluate Epicor Kinetic implementation partners for discrete manufacturing
There is no neutral list of top Epicor Kinetic partners, so evaluate them on your own manufacturing flow: quote to job, BOMs and routings, MRP, shop floor reporting and job costing. The right partner can show those working on your parts in a conference room pilot and has a plan for data migration, testing and the Kinetic update cycle after go-live.
When this makes sense
- Make-to-order and make-to-stock manufacturers selecting Kinetic and choosing between Epicor direct services and partners.
- Companies on Epicor 9, Epicor 10 or Vantage planning a move to current Kinetic.
- Job shops outgrowing QuickBooks plus spreadsheets or an entry-level MRP system.
- Manufacturers whose first Kinetic implementation went poorly and who want a new partner for phase two.
- Multi-site manufacturers standardizing several plants on one Kinetic instance.
What the engagement covers
Quote to order to job
Quote Entry with estimating, quote-to-order conversion, Sales Order Entry and job creation through Order Job Wizard or MRP, including make-direct versus make-to-stock decisions.
Engineering data
Parts, revisions, methods of manufacture with materials and operations in Engineering Workbench, and Product Configurator or Epicor CPQ for configurable products.
Job management and shop floor
Job Entry, job travelers, material issue and backflush, labor and production reporting through data collection or Advanced MES, subcontract operations and scrap reporting.
Planning
MRP parameters, scheduling and resource groups, purchase suggestions and the daily planner routine.
Costing and financials
Costing method choice (standard, average, FIFO, lot or last), burden rates by resource group, WIP and job closing, capture COS and WIP, and general ledger integration.
Inventory and warehouse
Warehouses and bins, cycle counts, lot tracking where needed, transfer orders between sites, and barcode transactions.
Reporting and extensions
BAQs, dashboards and SSRS reports for operations and finance, with BPMs and Epicor Functions only where configuration cannot meet the need.
How it runs
- 1
Discovery and design (3-6 weeks)
- Map quote to cash and plan to produce flows
- Decide costing method and inventory structure
- Agree what stays standard and what needs extension
- 2
Conference room pilots (6-10 weeks)
- Run real parts through quote, job, shop floor and shipment
- Validate job costs against expected margins
- Refine methods and planning parameters
- 3
Data migration and build (6-12 weeks)
- Load masters and methods with DMT in trial cycles
- Build reports, dashboards and needed BPMs
- Set up security groups and data collection
- 4
Testing and training (4-8 weeks)
- End-to-end tests including month-end close
- Role-based training and floor rehearsals
- Final data loads and reconciliation
- 5
Go-live and stabilization (4-8 weeks)
- Cutover open orders, jobs and inventory
- Daily issue triage
- First month-end and cost review
What you get
- Process design covering quote to cash, plan to produce and procure to pay
- Costing design with burden rates and job closing procedure
- Migrated and reconciled parts, methods, customers, suppliers, open orders, jobs and inventory
- Configured planning, scheduling and shop floor reporting
- Operational and financial BAQs, dashboards and key reports
- Test scripts, training materials and a cutover runbook
- Post go-live support plan including Kinetic update testing
What drives cost and effort
| Method of manufacture quality | Clean BOMs and routings migrate quickly; inconsistent or missing methods require engineering time before go-live. |
| Configurable products | Product Configurator or CPQ rules for configurable products add a separate design and test stream. |
| Shop floor data collection depth | Full labor and production reporting with MES or barcode devices adds hardware, setup and floor training. |
| Number of sites and companies | Each plant or legal entity adds configuration, intercompany flows and training waves. |
| Customization appetite | Every BPM, Function or custom report must be built, tested and retested at each Kinetic update. |
| Internal team availability | Projects where key users can spend meaningful time on pilots and testing finish faster than those relying on the partner to decide for them. |
Fixed-scope phased implementation
Manufacturers with a clear module list and a firm go-live window.
Time and materials with a cap
Companies with uncertain data quality or design decisions still open.
Advisory plus internal team
Manufacturers with a strong internal Epicor admin who want expert guidance and reviews rather than a full partner team.
Questions to ask any Epicor Kinetic consultant
Can you run our parts through quote, job, shop floor and shipment in a pilot before we sign the full statement of work?
A short paid pilot shows how the partner works and whether they understand your manufacturing.
Who are the named consultants and what manufacturing roles have they held?
The consultants who configure your job costing and MRP should have run a plant floor or cost close, not only sat in the sales presentation.
Which costing method do you recommend for us and why?
Costing method drives margin reporting and month-end work; the reasoning reveals depth.
How many BPMs and customizations do you typically add, and how are they documented?
Heavy customization makes every Kinetic update harder; documentation determines who can support it later.
How do you approach data migration testing?
Multiple trial DMT loads with reconciliation reduce go-live surprises.
What does support look like after go-live, including update testing?
Kinetic releases updates on a regular cadence; you need a plan to adopt them safely.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Bad methods produce wrong job costs
Validate costs on a sample of real jobs during pilots and fix standards before go-live.
Floor does not report labor and quantities
Design simple data collection screens and supervisor follow-up, and track reporting compliance daily.
Over-customization
Require a business case for each BPM or Function and prefer configuration and Application Studio layers first.
First month-end close fails
Rehearse a full month-end with converted data before cutover.
Partner team turnover
Name key consultants in the contract and require handover documentation.
Epicor itself offers implementation services, and many manufacturers succeed with Epicor direct, a partner, or a strong internal lead with targeted expert help. Choose by the people and the pilot, not the logo. Very small shops with simple routings may find a lighter ERP easier to run than Kinetic.
Frequently asked questions
Who are the top Epicor Kinetic partners for discrete manufacturing?
There is no independent ranking, and partner quality varies by team. Ask Epicor for partners active in your industry and region, then compare them on a pilot with your parts, named consultants and references you contact yourself.
Should we buy Kinetic from Epicor or a partner?
Either can work. Epicor sells and implements directly and also through partners. Compare the delivery team, support model after go-live and how each handles updates.
How long does a Kinetic implementation take for a manufacturer?
Single-site discrete manufacturers commonly plan six to twelve months. Configurators, MES, multiple sites or poor data extend it.
Is Kinetic cloud or on-prem better for manufacturing?
Cloud reduces infrastructure work and keeps you current on updates on Epicor's schedule. On-prem gives more control over update timing, database access and data location, which matters for some regulated manufacturers.
How does AI fit a Kinetic implementation?
AI agents can check migrated data for anomalies, draft test scripts from process designs and answer user questions during hypercare. After go-live, grounded question answering over Kinetic data reduces report requests.