Epicor Job Cost Variance Worksheet
Closing a job is the best moment to ask what it really cost. This worksheet lets you paste estimated and actual cost by element for a batch of jobs and see the variance in dollars and percent, so you can find the pattern behind the overruns instead of reading jobs one at a time.
| Job number | Part | Est. material | Actual material | Est. labor | Actual labor | Est. burden | Actual burden | Total estimated | Total actual | Variance | Variance % | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
$8,100 | $9,480 | $1,380 | 17% | |||||||||
$5,400 | $5,220 | -$180 | -3.3% | |||||||||
$2,220 | $2,660 | $440 | 19.8% | |||||||||
$10,900 | $10,530 | -$370 | -3.4% | |||||||||
$3,330 | $4,260 | $930 | 27.9% |
Enter figures from your Epicor job costing view or job closing report, then sort by variance to find the jobs worth investigating.
Automated variance report
Optional: see how this could be generated from your Epicor job data on a schedule.
Optional. The tool and every export work without this. No spam.
How to use it
Take estimated and actual material, labor and burden from the job costing view in Epicor, or from a BAQ that lists closed jobs. Type or paste one row per job. The sheet computes totals, variance and percent for each row, plus overall figures at the bottom. Sort or scan for large percentages, then look at which element drives them: material points to price or scrap, labor to routing standards or rework, and burden to hours spent on the machine.
- Compare like with like: same cost basis for estimate and actual
- Review at least 20 jobs before drawing a conclusion
- Group by part family or work center to find systematic issues
Interpreting variance
A positive variance is an overrun. A few jobs over by large amounts usually reflect individual events such as a scrapped batch. A consistent small overrun across many jobs points to a stale standard: the routing times or material costs behind the estimate no longer match reality. The default sample shows labor and burden running together, which is expected because burden is usually absorbed on labor or machine hours.
What to do next
Fix the estimate where it is systematically wrong, since it feeds quotes and standard costs. Where actuals are bad because of process problems, take them to the shop floor. Revisit rates and routings quarterly. Keep a short log of what you changed and why, so that next quarter's variance can be judged against it.
Common mistakes
People compare estimates made at one cost basis with actuals at another, such as standard against average cost, and chase variances that are only a method difference. Another is leaving jobs open for months, so actuals are incomplete. Finally, burying subcontract and outside processing in the material column hides a major source of surprise.
Frequently Asked Questions
Where do I find job costs in Epicor?
Job Tracker and job costing views show estimated and actual cost by material, labor, burden and subcontract. You can also build a BAQ listing closed jobs for export. The exact screens depend on your Kinetic version.
What is a normal variance?
It depends on the work. Repeat production should be within a few percent. Prototype and engineering-heavy jobs often vary by 20 percent or more. Track your own baseline rather than a generic number.
Should I include subcontract costs?
Yes, either in the material column or by adding a column. Keeping them separate is better, because outside processing often drives surprises and has a different owner.
Can I export the worksheet?
Yes. The tool exports to Excel, PDF and CSV, so you can share the results with finance or attach them to a job review.
If you would like closed job variances pulled from Epicor and ranked automatically with likely causes, we can build that as a read-only report.
Related Tools
Epicor Resource Group Burden Rate Calculator
Convert monthly overhead and productive hours into a burden rate per hour, add labor, and see the cost per piece for a routing operation.
EpicorEpicor Quote Price and Quantity Break Calculator
Build a unit price from material, labor, setup and subcontract cost, hit a target margin, and see how the price falls with quantity.
EpicorEpicor Shop Floor OEE Calculator
Calculate OEE from planned time, downtime, ideal cycle time, count and rejects, then test how much downtime cuts OEE.
EpicorEpicor Shop Floor Labor Reporting SOP Template
A fill-in standard operating procedure for how operators clock on, report quantities, record scrap and close operations in Epicor.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Safety Stock and Reorder Point Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Kinetic Job Status ReferenceA searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
- Epicor Job Material Shortage SQL GeneratorBuild a query that lists unissued job material for released, open jobs so planners can chase shortages.
- Epicor Resource Group Burden Rate CalculatorConvert monthly overhead and productive hours into a burden rate per hour, add labor, and see the cost per piece for a routing operation.
ERP fixes and how-tos
- How to close job costing and the accounting period in EpicorChecklist for closing a job costing period in Epicor Kinetic: capturing labor and burden, WIP reconciliation, job closing, and GL period close sequencing.
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
- How to Issue Material in Epicor KineticIssue material to a job in Epicor Kinetic: direct and backflush options, substituting parts, the material queue, and what to check when issue fails.
Guides
- Epicor vs Infor: Should You Switch ERP Platforms?Compare Epicor Kinetic vs Infor CloudSuite for manufacturing. Functional analysis, migration costs, and decision framework for switching platforms.
- How to Track Actual vs Estimated Hours in a CNC Machine ShopHow CNC job shops track actual versus estimated hours by operation, collect clean labor data, read the variance and feed corrections back into quotes.
- Why Composite Jobs Lose Margin: Actual vs Estimated AnalysisHow composites shops find where job margin goes: actual versus estimated layup hours, material yield, scrap, rework and cure load fill, and how to report it from ERP.
AI on your ERP
- AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule RiskPrivate AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.
- AI for Epicor Kinetic Estimating and Quoting: Faster Quotes Grounded in Your Own Job HistoryAI for Epicor Kinetic quoting: draft quotes from RFQs, find similar past jobs, check cost against actuals, and keep drawings and pricing on your own servers.
Integrations
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.