How to build a Kinetic homepage dashboard in Epicor
how to build a dashboard in epicor kinetic
Also searched as
- epicor kinetic homepage dashboard tutorial
- epicor bpm dashboard vs kpi tile
- epicor active homepage dashboard maintenance
Short answer
Kinetic homepage dashboards are built from Active Homepage Maintenance: create a BAQ that returns the metric or list you want, add a KPI or List widget referencing that BAQ, arrange widgets on the homepage layout, and assign the homepage to a role or company so the right users see it.
Applies to: Epicor Kinetic 2021.1 and later; classic Epicor 10 System Dashboards (the older grid-based dashboard tool) are a separate, still-supported technology with a different build process.
Build a KPI-driven Kinetic dashboard
- 1Design the underlying BAQ first (Customization > BAQ Designer): build the query that returns the exact rows or aggregate value you want on the dashboard, and test it independently.
- 2For a single-number KPI tile, ensure the BAQ returns an aggregate (count, sum) with a clear calculated field; for a list widget, keep the result set reasonably narrow in columns.
- 3Open Active Homepage Maintenance (System Setup > General Maintenance area, or search "Active Homepage").
- 4Create a new Homepage (or edit an existing one), then add a Page and, within it, a Widget - choose KPI, List, or Chart widget type depending on what you built.
- 5Point the widget at your BAQ as its data source, map the field to display for a KPI tile, and set thresholds/colors if using the KPI widget's conditional formatting (e.g. red if over budget).
- 6Arrange widgets on the grid layout by dragging; save and preview as yourself first.
- 7Assign the homepage to specific companies, roles, or default-for-all-users under the homepage's security/assignment tab so it appears for the right audience.
- 8Test by logging in as a user in the target role (or using Kinetic's "test as" / impersonation if available) to confirm both visibility and BAQ security filters behave as expected.
KPI widgets vs List widgets vs Trackers
KPI widgets show a single number or small set of numbers with optional threshold coloring (green/amber/red) - good for "open orders past due," "WIP value this week," or "on-hold jobs." List widgets render a small grid from a BAQ, letting users click through to the underlying record, useful as a personalized action list (e.g. my open quotes, my overdue tasks). Chart widgets visualize a BAQ result as a bar/line/pie directly on the homepage.
Trackers (Order Tracker, Job Tracker, etc.) are a related but distinct Kinetic feature - larger, filterable, drill-down screens rather than homepage tiles - and are a better fit than a dashboard widget when users need to interactively slice a dataset rather than glance at a summary.
BAQ security and dashboard data exposure
A dashboard widget only shows what its underlying BAQ returns, and BAQs respect Epicor's row-level security and company access - if a user should not see certain sites or customers on the dashboard, that restriction has to be built into the BAQ (via BAQ security or parameterized filters bound to the logged-in user's context) rather than assumed from the UI.
Avoid building a KPI from an unfiltered, unindexed BAQ scanning a huge transaction table on every homepage load - dashboard widgets typically refresh on a timer or on login, so a slow underlying query becomes a slow homepage for every assigned user, not just the person running a report once.
Migrating a dashboard between environments
Both the BAQ and the Active Homepage definition need to move together when promoting from test to production - export/import the BAQ first (via BAQ export or Solution Workbench), confirm it runs cleanly in the target environment, then export/import the Active Homepage definition referencing it.
Role and company assignments on the homepage are environment-specific and typically need to be re-set after import rather than assuming they carried over identically, especially if role names differ between environments.
Try it here, free
Epicor BAQ Performance Tuning Checklist
Work through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
Common pitfalls
- !Building a KPI BAQ that scans an entire transaction history table with no date filter, making the homepage noticeably slow to load for every assigned user.
- !Forgetting that BAQ security/company filters must be explicit - a dashboard can leak cross-company or cross-site data if the BAQ does not filter by the current user's context.
- !Assigning a dashboard to "all users" when only one department should see it, cluttering other users' homepages and drawing support tickets.
- !Confusing classic Epicor 10 System Dashboards (grid-based, different designer) with Kinetic Active Homepage dashboards when following an older tutorial or documentation page - the two are not interchangeable.
- !Not testing widget visibility as an actual member of the target role before rollout, missing a security or assignment gap.
- !Overloading one homepage with too many live-refreshing widgets, each hitting the database independently, rather than consolidating into fewer, well-indexed BAQs.
How an ERP-grounded AI assistant handles this
A grounded ERP assistant can turn a plain-English ask like "show me a tile with overdue purchase orders by buyer" into a draft BAQ plus KPI widget configuration matching your existing BAQ and security conventions, then flag if the requested filter would expose cross-site data that your BAQ security policy normally blocks - catching an access gap before the dashboard goes live rather than after an audit.
Frequently asked questions
Can end users personalize their own Kinetic homepage?
Yes, within the widgets and pages made available to their assigned homepage, users can often rearrange, resize, or hide widgets for themselves, but they cannot create new BAQ-backed widgets or change the underlying data source without Active Homepage Maintenance access.
Do Kinetic dashboards refresh in real time?
Widgets typically refresh on a configurable interval or on page load/navigation, not via a persistent live connection, so there can be a short lag between a transaction happening and it appearing on a KPI tile - factor this into expectations for anything described as "real time."
Can a dashboard widget link to a specific Kinetic screen?
Yes, list widgets commonly support click-through navigation to the related record's detail screen (e.g. clicking an order row opens Order Entry for that order), configured as part of the widget's drill-down settings in Active Homepage Maintenance.
What is the difference between a Kinetic dashboard and a classic System Dashboard?
Classic System Dashboards are a separate, older grid-based tool built in Dashboard Maintenance with its own tracker/updateable-grid model, still supported for existing implementations. Kinetic Active Homepage dashboards are the newer widget/tile-based homepage experience built for the Kinetic UI and are the recommended path for new dashboard work.
Related
Fixing a Slow Epicor BAQ (Business Activity Query)
A slow BAQ in Epicor is usually caused by unindexed join columns, a subquery or calculated field forcing a table scan, or the BAQ pulling far more rows than the dashboard actually displays before filtering client-side. Fix it by reading the SQL Server execution plan Epicor generates, moving filters into the BAQ criteria instead of the dashboard filter panel, and replacing subqueries with joins where possible.
AdvancedHow to create and call an Epicor Function
Open Function Studio from the main menu (Customization > Function Studio) or from inside a BPM designer's Call Context widget, define a Library and Function with typed inputs/outputs, write the logic in the C# widget, then compile and test with the built-in test harness before calling it from a BPM directive, a dashboard, or another function.
AdvancedEpicor Application Studio: understanding customization layers
Kinetic UI is built in layers loaded in order - Base (Epicor-delivered), Customization (Application Studio, company/layer-wide), Personalization (user- or role-specific, applied on top), and optionally Extended (packaged add-on layers) - and a change you make will not appear if a higher layer overrides the same control or if you are testing in the wrong layer context.
How-toHow to close job costing and the accounting period in Epicor
Before closing an accounting period in Epicor, run Capture Costs (or confirm background costing is current) to post all labor, material, subcontract, and burden to jobs, review the WIP report for jobs that should be closed or investigated, close completed jobs so their costs relieve WIP, and only then close the GL period, since GL close blocks further transaction posting into it.
Error fixFixing Epicor BusinessObjectException: BPM Directive Errors
A BusinessObjectException that says "A Business Process Management (BPM) directive has raised the following error" means a directive on that business object stopped the transaction, either deliberately via a Raise Exception widget or accidentally via an unhandled .NET error in Custom Code. Expand the InnerException on the error dialog to see the real message and the directive name, then open BPM Designer for that object and method to find the widget that fired.
How-toEpicor MRP Runs but Generates No Suggestions
When Epicor's MRP process completes without a job or purchase suggestion for a part you expect one for, the cause is almost always the part's own configuration (Part Class Type, Make Direct, Non-MRP flag, planning Time Fence) or the demand not being linked in a way MRP recognizes, not a defect in the MRP engine. Work through the part's Planning tab, its safety stock and lead time setup, and the demand source (sales order line status, job material requirement) before assuming the run itself failed.
AI for ERPAI for Epicor Kinetic, Beyond What Prism Covers
Add AI to Epicor Kinetic beyond Prism: private LLM over BAQs, BPM data, and REST v2, on-prem or private cloud, with honest guidance on when Prism already covers you.
AI for ERPAI Demand Forecasting for Manufacturers: Better Numbers and an Explanation Planners Can Trust
AI demand forecasting explains ERP forecast changes in plain language, flags exceptions for planners, and handles short-history SKUs without Excel overrides.
Stuck on Epicor Kinetic?
Talk to engineers who work inside Epicor Kinetic every week, and who build private AI that answers these questions from your own ERP data.
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor BAQ Performance Tuning ChecklistWork through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
- Epicor BAQ Query Template GeneratorFill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
- Epicor Kinetic Job Status ReferenceA searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
ERP fixes and how-tos
- How to Create a BAQ in Epicor KineticCreate a BAQ in Epicor Kinetic Query Builder: pick tables, set joins, display fields, criteria, calculated fields, test, and use it in dashboards and reports.
- Convert Epicor Classic Dashboards to KineticHow to convert Epicor Classic dashboards to Kinetic during an upgrade: what carries over, what must be rebuilt, and how to verify each dashboard.
- Epicor Kinetic Dashboard Examples (Shop Floor, Sales, Purchasing) and How to Add FiltersPractical Epicor Kinetic dashboard examples for shop floor, sales and purchasing, with the tables to query and how to add filters and parameters.
Guides
- Epicor vs Infor: Should You Switch ERP Platforms?Compare Epicor Kinetic vs Infor CloudSuite for manufacturing. Functional analysis, migration costs, and decision framework for switching platforms.
- Factory KPI Dashboard Design: 7 Rules for Dashboards People Actually UseFactory KPI dashboard design in 7 rules: pick metrics by audience, define each KPI, limit tiles, drill to the source row, show data freshness, and track usage.
- Building Dashboards in SyteLineBuild SyteLine dashboards with homepage widgets, real-time KPI displays, and drill-down navigation. Configure role-based dashboards for manufacturing ops.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule RiskPrivate AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.
Integrations
- How to connect Power BI to Epicor KineticConnect Power BI to Epicor Kinetic using BAQ OData feeds, a data warehouse or a SQL replica, with an on-prem gateway, key dashboards and natural-language Q&A.
- How to build an MCP server for Epicor KineticDesign a Model Context Protocol server for Epicor Kinetic: which read tools to expose, BAQ and REST v2 mapping, auth, stdio vs HTTP transport and audit logging.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.