ArchRay

Build your on-prem AI architecture

Pick your ERP and documents, an open model, the GPUs, the retrieval pipeline and the guardrails. The diagram, memory, speed and cost update as you swap parts. Export it for your team, or have an engineer check it before you buy hardware.

Loading the architecture builder...
Rate the builder

Templates

  • ERP copilot for one plant. Plain-English questions over live ERP data plus SOP search, about 150 users.
  • Air-gapped, ITAR-style shop. No internet path at all; documents, drawings and ERP stay inside the enclave.
  • Start small on one box. A pilot for 20 people on a single workstation GPU.
  • Enterprise AI CoE, several models. A large model for reasoning, a small one for extraction, one gateway, 1,000 users.
  • Document AI: POs, invoices, certs. Read supplier documents and post drafts to the ERP for approval.
  • Text-to-SQL over JD Edwards. Ask F-table questions in English with the query shown, read-only.

Models

Hardware

How it works

Every box in the diagram is a real, swappable part: 112 open-source and commercial components across serving engines, embedding models, rerankers, vector stores, document parsers, agent frameworks, gateways, guardrails, identity, observability and platforms. ERPs connect through the methods each vendor supports, such as IDO REST for SyteLine, RFC and OData for SAP, AIS for JD Edwards and the public APIs for Oracle EBS, shown read-only unless you choose otherwise.

Click any box to change it. Use Swap model and Swap hardware to compare every option on your own workload at once.

Questions

How does ArchRay size the GPUs?

Memory is the model weights at the precision you choose, plus the KV cache for every request generating at peak (computed from the model's layers, KV heads and head size, or its compressed latent for MLA models), plus runtime overhead. Speed is limited by memory bandwidth or compute, whichever is slower. It is a planning model, not a benchmark.

Which models and GPUs are included?

52 open-weight models and 29 GPUs and small systems, with architecture numbers taken from each model's published configuration and GPU numbers from vendor datasheets. We add new releases as they ship.

Can I share or export the design?

Yes. Download the diagram as PNG or SVG, the full configuration as JSON, or a bill of materials as CSV. The Share button copies a link that reopens the exact design.

Does anything I enter leave my browser?

No. The builder runs entirely in your browser. Only if you press Get it reviewed do we receive the design summary, so an engineer can reply.