Infor LN error 205: how to diagnose and fix it
infor ln error 205
Also searched as
- baan error 205
- infor ln error 205 duplicate
- infor ln error 205 bshell log
Short answer
Error 205 is a numeric database-layer error. In Baan and LN lineage it is commonly seen on write operations that conflict with an existing record, such as a duplicate key, but you should confirm for your version from the message text and logs. Identify the table and operation, check the key and any custom script or conversion that wrote the record, then correct the data or the logic.
Applies to: Infor LN 10.x and Baan 5.x. Confirm numeric meaning in your version's error list.
Diagnose and fix
- 1Record the full message: table, operation, user, session and time.
- 2Open the bshell log for that time on the application server and note the lines around the error.
- 3Check the database driver log for the underlying native error to see whether it is a key, constraint or lock condition.
- 4Display the table's index definition and compare against the data you tried to write.
- 5Query the existing record with the same key. If it exists, find who or what created it (session, conversion, integration).
- 6Fix the cause: correct the input, remove a true duplicate through a supported function, or fix the script that generates the key.
- 7Retest with one record, then rerun the original job.
Typical triggers
Common triggers are a conversion or import run twice, a custom number series generating repeats, concurrent users creating the same key, and an integration replaying a message. After a restore or copy of company data, sequence tables sometimes fall behind the data, so new records collide with existing ones.
Look for a pattern. If it only happens in one session, suspect that session's script. If it happens in many, suspect sequence or data issues.
Which logs to read
The bshell log for the user's process shows the session stack and the failing call. The database driver log shows the native error. Together they identify the table, the index and the operation without guessing.
Increase logging temporarily only if the standard logs are not enough, and remove it after.
Safe correction
Never delete duplicates with direct SQL in production without a backup and approval. Prefer the standard delete or merge function, which maintains dependent tables. If a sequence is wrong, correct it using the supported sequence maintenance session and log the change.
Add a check to the conversion or integration to make it idempotent, so reruns do not repeat the problem.
Try it here, free
Infor LN Enterprise Server Error Codes and Log Files Reference
Look up bshell and database driver error numbers, what they mean, what to check first and which log file to read.
Common pitfalls
- !Assuming 205 means duplicate on every version without checking.
- !Deleting rows with SQL.
- !Rerunning an import before understanding why it failed.
- !Ignoring sequence tables after a restore.
- !Not keeping the log from the first occurrence.
How an ERP-grounded AI assistant handles this
A private assistant indexing your bshell logs and incident notes can match a new 205 to earlier ones, and show the table, key and likely creator of the clashing record. Netray runs this on your own infrastructure, read-only by default.
Frequently asked questions
What does Infor LN error 205 mean?
It is a database-layer numeric error that, in Baan lineage, is commonly associated with record conflicts such as duplicates. Verify against your version's list and the accompanying text before acting.
Which log should I check first?
The bshell log at the time of failure, then the database driver log for the native error.
Can I fix it by restarting?
Rarely. Restart clears transient states but not duplicate data or wrong sequences.
How do I stop it recurring?
Make conversions and integrations idempotent and check sequences after any restore.
Related
Infor LN error 512, error 513 and error 201: meaning and fix
These are numeric runtime errors raised by the LN database layer or the underlying RDBMS driver. The number alone is not the diagnosis. The message text, the table and the database log together tell you whether it is a lock, a key or constraint violation, a connection issue or a missing object.
Error fixInfor LN: "Record is locked by another user" error
This error means another LN session, interactive or batch, is holding an update lock on the same table row you are trying to change. Find the locking user or session in Active Sessions, confirm it is stale rather than genuinely running, and either wait or terminate it before you retry.
Error fixInfor LN 'unable to create a session': causes and how to fix it
This message means the client reached LN but the server could not start the session process (a bshell) or could not load the session. Work from the server side: check the bshell log, licence and user limits, the user's authorizations, and whether the session or its dependent objects exist and are compiled.
Error fixInfor LN DAL Out of Sync After a Custom Field: Cause and Fix
Infor LN throws a DAL, or table, out of sync error, or simply drops a new custom field silently, when a table's dictionary definition is changed but the generated DAL and dependent forms are not regenerated afterward. Running the standard sequence, table compile, DAL generation, then session/form compile, in Tools > Development after every dictionary change resolves it. Skipping any one of the three steps is what causes the mismatch.
Error fixInfor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix It
A bshell process pinned at 100% CPU on the Infor LN application server almost always means one session is stuck in a 4GL loop, scanning an unindexed table, or waiting on a database lock. End the session from the Sessions Monitor first, then kill the OS process only if that fails, and check for a blocking database transaction before assuming it is a bug.
Error fixInfor LN Not Authorized to Run This Session: How to Fix It
Infor LN refuses to open a session with a not authorized message when the logged-in user's assigned role does not include that session, or when the session is blocked for the company they are logged into. Grant the session through Common > Authorization Management > Roles, or check the user's role and company context, and the session opens on retry. In most cases this is a permissions configuration issue, not a bug.
AI for ERPAI for Infor LN: Sessions, BODs, and Engineer-to-Order Work
Add grounded AI to Infor LN 10.x or CloudSuite: natural-language answers over sessions and BODs, agents for project and engineer-to-order work, on-prem options.
AI for ERPAI for Legacy Baan IV/V: Capture the Knowledge Before It Walks Out the Door
Use AI to capture knowledge from ageing Baan IV/V systems, document undocumented customisations, and de-risk a future migration to LN or CloudSuite.
Stuck on Infor LN?
Talk to engineers who work inside Infor LN every week, and who build private AI that answers these questions from your own ERP data.
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor LN Enterprise Server Error Codes and Log Files ReferenceLook up bshell and database driver error numbers, what they mean, what to check first and which log file to read.
- Infor LN Bshell Application Server Memory and CPU Sizing CalculatorEstimate peak bshell count, RAM and CPU cores for an LN 10.x application server from your own measured bshell memory and concurrency.
- Infor LN and Baan Integration Interface Specification TemplateFill-in functional and technical specification for an LN or Baan interface, including data flow, error handling and volumes.
ERP fixes and how-tos
- Infor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix ItInfor LN bshell pegged at 100% CPU blocks sessions from responding. Here are the real causes, how to trace the hung process on the app server, and the fix.
- Infor LN error 512, error 513 and error 201: meaning and fixHow to diagnose Infor LN and Baan numeric errors 512, 513 and 201: where the real cause is logged, how to read the database driver text, and fixes.
- Baan Error 10054 (and Error 206): What It Means and How to Fix ItBaan error 10054 is the Windows socket error connection reset by peer between the client and bshell. Learn the network, bshell and server causes plus error 206.
Guides
- Infor LN Performance Tuning: Deep Dive Optimization GuideOptimize Infor LN performance with database tuning, BShell code optimization, session profiling, and server configuration for maximum throughput and response time.
- Infor LN BShell Programming: Developer Fundamentals GuideMaster Infor LN BShell scripting with this developer guide covering 4GL syntax, database operations, session hooks, and debugging techniques for BAAN/LN ERP.
- Infor LN BShell Customization GuideMaster Infor LN BShell customization. 4GL programming patterns, session scripting, DLL extensions, and upgrade-safe customization techniques.
Integrations
- How to add WhatsApp to Infor LNHow to connect WhatsApp to Infor LN: ION BODs and APIs, template messages, opt-in rules, supplier confirmations and order status, including on-prem LN setups.
- How to add AI agents to Infor LNHow to add AI agents to Infor LN: a tool layer over ION API and BODs, read-only reporting first, approval before writes, and fully on-prem model hosting.