Manufacturing & OperationsGlossary

What Is Put-Away?

Also known as: putaway, directed put-away

Definition

Put-away is the warehouse step that moves received goods from the receiving dock to a storage location and records that location in the system. Directed put-away uses rules to choose the best bin.

Put-Away Explained

After receiving and any inspection, goods sit in a receiving or quality location. Put-away moves them to storage and updates inventory by bin. Until that scan, the stock exists in the ERP but cannot be picked reliably.

Directed put-away rules choose bins by item attributes: size, weight, velocity, hazmat class, temperature, lot control or customer reservation. Simple rules assign a fixed home bin per item. More complex rules look for open capacity, consolidate partial pallets and keep fast movers near the dock.

In Infor LN, warehouse inbound procedures include storage tasks that generate put-away orders. SyteLine uses location transactions to move stock from a receiving location, and NetSuite supports bin put-away with its warehouse features. All of them depend on the receipt posting first, often tied to a purchase order or a work order completion.

The most common failure is delay or skipped scans. Goods get shelved in the nearest gap, the record shows the dock, and the next picker finds an empty bin.

Why It Matters

  • Fast put-away shortens dock-to-stock time, which frees material for production and shipment.
  • Correct bin records are the foundation of pick accuracy.
  • Rule-based location choice reduces space waste and walking distance.
  • Controlled put-away protects quarantine and lot-controlled stock from being picked early.

In Practice

Twenty pallets arrive on one truck. Without rules, the forklift driver uses whichever aisle is open and the clerk keys bin numbers later. With directed put-away on handhelds, the driver scans the pallet and the system returns a bin; the stock record updates at the moment of the scan.

Frequently Asked Questions

What is directed put-away?

It is a system-guided put-away where rules pick the storage bin and the operator confirms by scanning the item and the bin.

What is dock-to-stock time?

The elapsed time from arrival at the dock to the item being available in a pickable location. It is a standard warehouse KPI.

Why does put-away cause inventory inaccuracy?

Delayed or unrecorded moves leave the system showing stock in the wrong place. Pickers then cannot find it, and counts drift.

Working with Put-Away in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

Warehouse Receiving Inspection Checklist

Open full tool

A practical receiving checklist covering trailer arrival, paperwork match, physical and quality inspection, damage claims and put-away.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides