How to use Claude with Epicor Kinetic
Short answer
Connect Claude to Epicor Kinetic by running a small MCP server that wraps read-only BAQs and selected REST calls, then add it as a connector in Claude. For stricter residency, call Claude through AWS Bedrock or Google Vertex, or run an open-weight model on-prem instead.
Epicor users who try Claude typically start the same way: paste a BAQ export, ask for analysis, get a surprisingly good answer. The harder step is getting live, permissioned access without writing a one-off script for each question.
Claude supports the Model Context Protocol, so Kinetic can be presented as a set of named tools. Claude then decides when to call them. That keeps the ERP behind your code and your service account, and the model only sees what the tools return.
Where the model runs matters as much as how it connects. Claude can be reached through Anthropic's API and through major cloud marketplaces, and some plants will still prefer a model inside their own walls.
What teams use it for
Ask questions across jobs and orders
A planner asks which open jobs depend on a late part and what sales orders they feed. Claude chains an on-order BAQ, a job material BAQ and a sales demand BAQ to answer.
Review a long engineering change
Give Claude an ECN document plus the affected part's where-used and open job list, and ask which in-flight work needs rework.
Customer quality response
Draft an 8D response by combining NCR records, lot genealogy from receipts and issues, and the inspection plan, with a quality engineer reviewing every claim.
Customisation and BPM review
Paste a BPM directive or Epicor Function and ask Claude to explain what it does, find side effects, and suggest tests before an upgrade.
Procurement summary memos
Summarise supplier performance from receipts and rejects into a one-page memo for a quarterly review.
Epicor Kinetic integration surface
- BAQ execution through the BaqSvc OData endpoint is the preferred tool backend.
- Selected REST v2 business object reads for detail screens, such as a single job or PO, wrapped as individual tools.
- Service account with defined security groups, so Claude's access equals a named role and not an administrator.
- Epicor Functions for server-side shaping so the tool returns compact JSON rather than a huge dataset.
- Epicor API keys on cloud tenants, held by the MCP server and never exposed in a prompt.
How it works
- 1
Choose a handful of read tools
For example get_job, get_open_po_releases, get_part_availability and get_sales_order. Each maps to a reviewed BAQ or a single REST call.
- 2
Build the MCP server
Use an official MCP SDK in Python or TypeScript. Validate arguments, cap rows, and return concise JSON.
- 3
Pick a transport
Stdio for a desktop pilot on one machine, streamable HTTP behind your gateway for shared team use.
- 4
Authenticate the user and the ERP separately
The person authenticates to the MCP server (SSO), and the server authenticates to Kinetic with a scoped service account.
- 5
Add it to Claude
Register the server as a connector for your organisation or as a local MCP server for pilots, then test with real questions.
- 6
Choose the model hosting
Anthropic API for simplicity, AWS Bedrock or Google Vertex when your cloud agreements or regions demand it, or an on-prem model for sensitive plants.
Example flows
Which jobs are at risk this week
Trigger: A production manager asks Claude in the team workspace.
- Claude calls the late-material tool for the next five days.
- For each short part it calls the open supply tool.
- It groups jobs by customer commitment date.
- It lists the three decisions that need a human.
Result: A short brief with record references the manager can open in Kinetic.
Upgrade impact review
Trigger: An IT lead pastes a BPM directive before a Kinetic version upgrade.
- Claude explains the logic and the tables it touches.
- It flags calls that may be version sensitive.
- It drafts test cases for the sandbox.
Result: A checklist that shortens regression testing.
Keeping data on-prem
If the Kinetic server is on-prem, the MCP server should sit in the same network and be the only component talking to it. Whether Claude itself may see the returned data is a policy question. Many manufacturers accept Claude through a cloud provider's private endpoint in their region, with logging and no training on their data. Where that is not acceptable, as for some defense and aerospace work, run an open-weight model on your own GPUs with vLLM and reuse the same MCP tools through a compatible client. The tool layer is portable, so the work is not wasted if you change the model.
Security checklist
- Read-only tools first. Add write tools only as drafts that require an approving user.
- Scope the service account to least privilege and rotate its credentials.
- Log every tool call with the human requester, arguments and row count.
- Review the provider's data retention and training terms for your plan or cloud marketplace.
- Strip or tokenise fields you never want leaving the network, such as customer prices or banking details.
Ways to get it done
Local MCP server on one machine
Effort: Days.
A technical champion proving value on non-sensitive data.
Shared MCP server with SSO
Effort: Two to four weeks including role mapping and logging.
A team of planners, buyers and quality staff.
Netray private deployment
Effort: Scoped pilot in weeks, with open-weight models on your hardware.
On-prem or air-gapped plants that still want the same tool pattern.
Pitfalls
- !Exposing a generic 'run any OData query' tool. The model will eventually write a bad filter.
- !Returning thousands of rows, which wastes context and hides the answer.
- !Using one administrator service account because it was easy.
- !Assuming the cloud tenant and on-prem API paths and auth are identical across versions.
Frequently asked questions
Does Claude have a native Epicor Kinetic connector?
Do not assume one exists. The reliable approach is an MCP server you control that wraps BAQs and selected API calls. Check Epicor and Anthropic directories for any official option available at the time you build.
Can Claude write back to Kinetic?
It can if you build write tools, but start with drafts. Each write should name the record, show the intended change, and need a human approval step. Kinetic BPM directives will still apply to those calls.
Should I use the Anthropic API, Bedrock or Vertex?
Use whichever matches your existing cloud contracts, regions and logging. The tool layer is the same. If your data cannot go to any external provider, an on-prem open-weight model is the alternative.
Will Claude see my whole ERP?
No. It sees only what your tools return. That is why narrow BAQs, row limits and a scoped service account matter more than the choice of model.
How do I stop wrong answers about quantities?
Compute totals and availability inside the BAQ, return record IDs with every claim, and instruct the model to cite them. Spot check against Kinetic's own screens during the pilot.
Want Claude working on your Epicor Kinetic?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Epicor BAQ Performance Tuning Checklist
Work through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor BAQ Performance Tuning ChecklistWork through a practical list of checks when a BAQ, dashboard or BPM lookup runs slowly in Epicor Kinetic.
- Epicor BAQ Query Template GeneratorFill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
ERP fixes and how-tos
- How to Add AI to Epicor Kinetic On-Premises Without Moving Your DataReference architecture for a private AI assistant on Epicor Kinetic on-premises: BAQ and REST v2 access, SQL replica, local LLM, roles, audit and rollout.
- How to Create a BAQ in Epicor KineticCreate a BAQ in Epicor Kinetic Query Builder: pick tables, set joins, display fields, criteria, calculated fields, test, and use it in dashboards and reports.
- Shortage, Scrap, WIP, BOM, GL and Sales Reports in Epicor KineticWhere to find the Epicor Kinetic shortage, scrap, WIP, BOM, general ledger and sales reports, and how to build each one as a BAQ when the standard report falls short.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic, Beyond What Prism CoversAdd AI to Epicor Kinetic beyond Prism: private LLM over BAQs, BPM data, and REST v2, on-prem or private cloud, with honest guidance on when Prism already covers you.
Integrations
- How to connect Claude to Epicor Vantage and Epicor 9Connect Claude to Epicor Vantage or Epicor 9: MCP connectors, Anthropic API, Bedrock or Vertex options, and the on-prem alternative for sensitive plant data.
- How to connect Claude to Epicor Prophet 21Connect Claude to Epicor Prophet 21 with an MCP connector, via the Anthropic API, AWS Bedrock or Vertex, or keep data on-prem with an open-weight alternative.