On-prem models / Zhipu AI (Z.ai)

Run GLM-5.3-Flash on-prem

First natively multimodal GLM-5 model: 320B total, 18B active, with a hybrid sparse plus linear attention design and manifold-constrained hyper-connections. Z.ai positions it above GLM-5.2 at a tenth of the price.

320B MoE (18B active)1024K contextMITtext + visionthinking modetool callingreleased 2026-08

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)640 GB0.09 GB0.37 GB1.48 GB
FP8320 GB0.05 GB0.18 GB0.74 GB
INT4 (AWQ / GPTQ)179 GB0.05 GB0.18 GB0.74 GB
GGUF Q4_K_M192 GB0.05 GB0.18 GB0.74 GB

KV cache from the published config: 45 layers, 64 KV heads x 256 dims, 11 full-attention layers. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

One of the best-balanced options for on-prem ERP agents in late 2026: reads scanned documents, writes SQL, calls tools, and the MIT licence avoids legal friction. Fits a single 8-GPU server with room for long contexts.

Strengths

  • Very high download volume (most downloaded GLM model at time of writing)
  • Only 11 layers keep KV, so long context is cheap
  • Native image input
  • MIT licence
  • Official FP8 and BF16 repos

Watch out for

  • About 320 GB in FP8; plan for 4x H200 or 8x H100-class GPUs
  • New architecture (glm5_next) needs current vLLM/SGLang
  • Defaults to max reasoning effort; tune for latency

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
AMD Instinct MI210 64GB4186 / 230 GB135
AMD Instinct MI325X 256GB1181 / 230 GB191
Intel Gaudi 3 128GB (HL-325L OAM)2183 / 230 GB173
NVIDIA B300 (Blackwell Ultra) 270GB1181 / 243 GB232
NVIDIA H200 SXM 141GB2183 / 253 GB200
NVIDIA H200 NVL 141GB2183 / 253 GB200
AMD Instinct MI355X 288GB1181 / 259 GB232
NVIDIA A100 40GB PCIe8192 / 288 GB155

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA H100 NVL 94GB4328 / 338 GB154
NVIDIA L40S 48GB8334 / 345 GB85
NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB4328 / 345 GB98
NVIDIA RTX PRO 6000 Blackwell Server Edition 96GB4328 / 345 GB90
AMD Instinct MI300X 192GB2325 / 345 GB147
AMD Instinct MI210 64GB8334 / 460 GB120
AMD Instinct MI325X 256GB2325 / 460 GB159
Intel Gaudi 3 128GB (HL-325L OAM)4328 / 460 GB150

Serving and licence

SGLang cookbook, vLLM recipe and KTransformers tutorial for GLM-5.3-Flash; use reasoning_effort low/high/max and clear_thinking=true for chat.

MIT. MIT licence: commercial use allowed without revenue or user caps.

Model card on Hugging Face

Design a GLM-5.3-Flash deployment

Preloaded with GLM-5.3-Flash. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does GLM-5.3-Flash need?

The weights alone take about 640 GB in BF16, 320 GB in FP8 and 179 GB in 4-bit. On top of that each request holds a KV cache of about 0.05 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 0.92 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs GLM-5.3-Flash?

For a single user at 8K context in 4-bit, 4 x AMD Instinct MI210 64GB (64 GB each) fits, at an estimated 135 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is GLM-5.3-Flash allowed for commercial use?

GLM-5.3-Flash is released under MIT. MIT licence: commercial use allowed without revenue or user caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve GLM-5.3-Flash on-prem?

SGLang cookbook, vLLM recipe and KTransformers tutorial for GLM-5.3-Flash; use reasoning_effort low/high/max and clear_thinking=true for chat.