GPUs for on-prem AI / AMD

AMD Instinct MI210 64GB for LLMs

CDNA 2 PCIe card with 64GB; no FP8, and engine and kernel coverage on ROCm lags newer Instinct parts. Price is an indicative 2026 street range for one unit, not a quote.

Memory
64 GB HBM2e
Bandwidth
1,600 GB/s
BF16 dense
181 TFLOPS
FP8 dense
no
Power
300 W

PCIe | Infinity Fabric bridge 3 links x 100 GB/s | ROCm | indicative price $4,000-8,000

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Qwen3-Coder-Next79.7B / 3B12562179
Llama 3.3 70B Instruct70B123219
Qwen3.6-35B-A3B36B / 3B12571146
Qwen3-32B32.8B147121
Olmo 3.1 32B Think32B148124
GLM-4.7-Flash31.2B / 3B12501113
Gemma 4 31B IT30.7B149122
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B1229184
Granite 4.2 30B30B151123
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B12601166
Qwen3.8-27B27.8B156130
Gemma 3 27B IT27B157128
Gemma 4 26B A4B IT25.2B / 3.8B1212194
Mistral Small 3.2 24B Instruct 250624B163130
Magistral Small 1.2 (2509)24B163130
Devstral Small 2 24B Instruct 251224B163130
gpt-oss-20b21B / 3.6B12291126
Phi-414B199140
Gemma 4 12B IT11.95B1114154
Qwen3.5-9B9.7B1138177
Qwen3-VL-8B-Instruct8.8B1144158
Granite 4.2 8B8B1153159
Llama 3.1 8B Instruct8B1155164
Step-3.7-Flash198B / 11B21384114
Qwen3.8-Flash-Next180B / 6B21964159
Mistral Medium 3.5 128B128B222420
Qwen3.5-122B-A10B125B / 10B21474126
Ling-3.0-flash124B / 5.1B22194185
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B2118499
Mistral Small 4 119B A6B (2603)119B / 6.5B21974167
gpt-oss-120b117B / 5.1B22234176
Command A (03-2025)111B226425
Llama 4 Scout 17B-16E Instruct109B / 17B299473
Trinity Large Thinking398B / 13B41418107
GLM-5.3-Flash320B / 18B41358122
MiMo-V2.6-Flash-RL309B / 15B41458127
Hy3295B / 21B4102872
Command A+ (05-2026)218B / 25B4116470
DeepSeek-V4.1-Flash-1017748B / 16B817116 (multi-node)112
GLM-5.3744B / 40B89016 (multi-node)57
Mistral Large 3 675B Instruct 2512675B / 41B89816 (multi-node)65
DeepSeek-V3.2671B / 37B810316 (multi-node)68
MiniMax-M3428B / 23B8126889
Qwen3.5-397B-A17B403B / 17B81398110
Llama 4 Maverick 17B-128E Instruct400B / 17B81538102
DeepSeek-V4-Pro-08131600B / 49B16 (multi-node)7632 (multi-node)70
MiMo-V2.6-Pro-RL1020B / 42B16 (multi-node)7324 (multi-node)63
Kimi-K2.61000B / 32B16 (multi-node)8424 (multi-node)73
Kimi-K2.7-Code1000B / 32B16 (multi-node)8424 (multi-node)73
Muse Spark Open 816B-A42B816B / 42B16 (multi-node)7816 (multi-node)63
Kimi-K32800B / 104B32 (multi-node)5256 (multi-node)47
Qwen3.8-2.4T-A95B2446B / 95B32 (multi-node)5348 (multi-node)46

Design a deployment on AMD Instinct MI210 64GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one AMD Instinct MI210 64GB?

Of the models we track, Qwen3-Coder-Next (79.7B total, 3B active) fits on a single 64 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is AMD Instinct MI210 64GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 1600 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 200 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is AMD Instinct MI210 64GB a good choice for on-prem AI?

CDNA 2 PCIe card with 64GB; no FP8, and engine and kernel coverage on ROCm lags newer Instinct parts. Price is an indicative 2026 street range for one unit, not a quote.