GPUs for on-prem AI / Intel

Intel Gaudi 3 128GB (HL-325L OAM) for LLMs

128GB per accelerator with integrated Ethernet scale-out; serving relies on Intel's vLLM fork and Optimum Habana, so model and feature coverage is narrower than CUDA. MME BF16/FP8 per Intel technical paper; the PCIe HL-338 card is 600W. Price is an indicative 2026 street range for one unit, not a quote.

Memory
128 GB HBM2e
Bandwidth
3,700 GB/s
BF16 dense
1,678 TFLOPS
FP8 dense
1,678 TFLOPS
Power
900 W

OAM | 24x 200GbE RoCE on-chip (1200 GB/s bidirectional) | Gaudi SynapseAI | indicative price $12K-20K

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Step-3.7-Flash198B / 11B11892145
Qwen3.8-Flash-Next180B / 6B12822208
Mistral Medium 3.5 128B128B129226
Qwen3.5-122B-A10B125B / 10B12042163
Ling-3.0-flash124B / 5.1B13102241
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B11802136
Mistral Small 4 119B A6B (2603)119B / 6.5B12692212
gpt-oss-120b117B / 5.1B13062225
Command A (03-2025)111B134231
Llama 4 Scout 17B-16E Instruct109B / 17B1134292
Qwen3-Coder-Next79.7B / 3B13941255
Llama 3.3 70B Instruct70B151125
Qwen3.6-35B-A3B36B / 3B13941262
Qwen3-32B32.8B1100147
Olmo 3.1 32B Think32B1102153
GLM-4.7-Flash31.2B / 3B13881214
Gemma 4 31B IT30.7B1104149
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B13651167
Granite 4.2 30B30B1107150
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B13971289
Qwen3.8-27B27.8B1117165
Gemma 3 27B IT27B1118162
Gemma 4 26B A4B IT25.2B / 3.8B13451183
Mistral Small 3.2 24B Instruct 250624B1130165
Magistral Small 1.2 (2509)24B1130165
Devstral Small 2 24B Instruct 251224B1130165
gpt-oss-20b21B / 3.6B13641233
Phi-414B1191185
Gemma 4 12B IT11.95B12151113
Qwen3.5-9B9.7B12511154
Qwen3-VL-8B-Instruct8.8B12591121
Granite 4.2 8B8B12721122
Llama 3.1 8B Instruct8B12741132
Qwen3.5-397B-A17B403B / 17B21704140
Llama 4 Maverick 17B-128E Instruct400B / 17B21734127
Trinity Large Thinking398B / 13B21894137
GLM-5.3-Flash320B / 18B21734152
MiMo-V2.6-Flash-RL309B / 15B21894159
Hy3295B / 21B2138492
Command A+ (05-2026)218B / 25B2145286
DeepSeek-V4.1-Flash-1017748B / 16B42138184
GLM-5.3744B / 40B4116897
Mistral Large 3 675B Instruct 2512675B / 41B41258108
DeepSeek-V3.2671B / 37B41318112
MiniMax-M3428B / 23B41614113
DeepSeek-V4-Pro-08131600B / 49B812916 (multi-node)80
MiMo-V2.6-Pro-RL1020B / 42B812616 (multi-node)76
Kimi-K2.61000B / 32B814616 (multi-node)87
Kimi-K2.7-Code1000B / 32B814616 (multi-node)87
Muse Spark Open 816B-A42B816B / 42B81348104
Kimi-K32800B / 104B16 (multi-node)5932 (multi-node)54
Qwen3.8-2.4T-A95B2446B / 95B16 (multi-node)6024 (multi-node)52

Design a deployment on Intel Gaudi 3 128GB (HL-325L OAM)

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one Intel Gaudi 3 128GB (HL-325L OAM)?

Of the models we track, Step-3.7-Flash (198B total, 11B active) fits on a single 128 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is Intel Gaudi 3 128GB (HL-325L OAM) for LLM inference?

Generation speed is mostly set by memory bandwidth: 3700 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 463 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is Intel Gaudi 3 128GB (HL-325L OAM) a good choice for on-prem AI?

128GB per accelerator with integrated Ethernet scale-out; serving relies on Intel's vLLM fork and Optimum Habana, so model and feature coverage is narrower than CUDA. MME BF16/FP8 per Intel technical paper; the PCIe HL-338 card is 600W. Price is an indicative 2026 street range for one unit, not a quote.