GPUs for on-prem AI / NVIDIA

NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB for LLMs

300W blower variant for 4-GPU workstations (384GB total). NVIDIA lists 3,511 AI TOPS FP4 with sparsity; BF16/FP8 here are derived from it at the same ratios, so treat as approximate. Price is an indicative 2026 street range for one unit, not a quote.

Memory
96 GB GDDR7
Bandwidth
1,792 GB/s
BF16 dense
439 TFLOPS
FP8 dense
878 TFLOPS
Power
300 W

workstation card | PCIe Gen5 only | CUDA | indicative price $8,000-10K

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Mistral Medium 3.5 128B128B115213
Qwen3.5-122B-A10B125B / 10B1117299
Ling-3.0-flash124B / 5.1B11972164
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B1101285
Mistral Small 4 119B A6B (2603)119B / 6.5B11652136
gpt-oss-120b117B / 5.1B11942147
Command A (03-2025)111B117216
Llama 4 Scout 17B-16E Instruct109B / 17B172251
Qwen3-Coder-Next79.7B / 3B12741154
Llama 3.3 70B Instruct70B126222
Qwen3.6-35B-A3B36B / 3B12751159
Qwen3-32B32.8B152124
Olmo 3.1 32B Think32B154127
GLM-4.7-Flash31.2B / 3B12681124
Gemma 4 31B IT30.7B155125
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B1247193
Granite 4.2 30B30B157125
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B12781180
Qwen3.8-27B27.8B162133
Gemma 3 27B IT27B163131
Gemma 4 26B A4B IT25.2B / 3.8B12281104
Mistral Small 3.2 24B Instruct 250624B170133
Magistral Small 1.2 (2509)24B170133
Devstral Small 2 24B Instruct 251224B170133
gpt-oss-20b21B / 3.6B12461138
Phi-414B1109144
Gemma 4 12B IT11.95B1125160
Qwen3.5-9B9.7B1151185
Qwen3-VL-8B-Instruct8.8B1157165
Granite 4.2 8B8B1167165
Llama 3.1 8B Instruct8B1169171
Hy3295B / 21B286457
Command A+ (05-2026)218B / 25B284476
Step-3.7-Flash198B / 11B21484122
Qwen3.8-Flash-Next180B / 6B22084167
MiniMax-M3428B / 23B41158 (multi-node)74
Qwen3.5-397B-A17B403B / 17B41358 (multi-node)86
Llama 4 Maverick 17B-128E Instruct400B / 17B41428 (multi-node)86
Trinity Large Thinking398B / 13B41488 (multi-node)84
GLM-5.3-Flash320B / 18B41434100
MiMo-V2.6-Flash-RL309B / 15B41544107
MiMo-V2.6-Pro-RL1020B / 42B8 (multi-node)7316 (multi-node)63
Kimi-K2.61000B / 32B8 (multi-node)8516 (multi-node)74
Kimi-K2.7-Code1000B / 32B8 (multi-node)8516 (multi-node)74
Muse Spark Open 816B-A42B816B / 42B8 (multi-node)7716 (multi-node)66
DeepSeek-V4.1-Flash-1017748B / 16B8 (multi-node)13116 (multi-node)116
GLM-5.3744B / 40B8 (multi-node)6916 (multi-node)59
Mistral Large 3 675B Instruct 2512675B / 41B8 (multi-node)7916 (multi-node)68
DeepSeek-V3.2671B / 37B8 (multi-node)828 (multi-node)63
DeepSeek-V4-Pro-08131600B / 49B16 (multi-node)7924 (multi-node)67
Kimi-K32800B / 104B24 (multi-node)5040 (multi-node)45
Qwen3.8-2.4T-A95B2446B / 95B24 (multi-node)5132 (multi-node)47

Design a deployment on NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB?

Of the models we track, Mistral Medium 3.5 128B (128B) fits on a single 96 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 1792 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 224 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB a good choice for on-prem AI?

300W blower variant for 4-GPU workstations (384GB total). NVIDIA lists 3,511 AI TOPS FP4 with sparsity; BF16/FP8 here are derived from it at the same ratios, so treat as approximate. Price is an indicative 2026 street range for one unit, not a quote.