On-prem models / Mistral AI

Run Mistral Small 4 119B A6B (2603) on-prem

A 128-expert MoE (4 active plus 1 shared) that merges Mistral's Instruct, Magistral reasoning and Devstral coding lines into one model. Reasoning effort can be set to none or high per request. Mistral also ships NVFP4 and EAGLE speculative-decoding checkpoints.

119B MoE (6.5B active)256K contextApache-2.0text + visionthinking modetool callingreleased 2026-03

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)238 GB0.19 GB0.75 GB3.02 GB
FP8119 GB0.09 GB0.38 GB1.51 GB
INT4 (AWQ / GPTQ)66.6 GB0.09 GB0.38 GB1.51 GB
GGUF Q4_K_M71.4 GB0.09 GB0.38 GB1.51 GB

KV cache from the published config: 36 layers, MLA latent 256 + 64 RoPE dims. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

A strong European option for ERP agents: tool calling, document extraction from images, text-to-SQL with reasoning when needed, and good coverage of European and Asian languages. Throughput per GPU is good thanks to low active parameters.

Strengths

  • One model for chat, reasoning and coding
  • Only 6.5B active parameters for fast decode
  • Compact MLA KV cache
  • Native function calling, JSON output and vision
  • Apache 2.0

Watch out for

  • 119B total weights need about 240GB at bf16, or a single large GPU at NVFP4
  • MLA and MoE need recent engine versions
  • Reasoning mode adds latency

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
NVIDIA A100 40GB PCIe270 / 72 GB194
NVIDIA A100 80GB PCIe169 / 72 GB174
NVIDIA A100 80GB SXM169 / 72 GB181
NVIDIA H100 PCIe 80GB169 / 72 GB179
NVIDIA H100 SXM 80GB169 / 72 GB253
NVIDIA H100 NVL 94GB169 / 84 GB278
NVIDIA L4 24GB473 / 86 GB91
NVIDIA A10 24GB473 / 86 GB144

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA H200 SXM 141GB1125 / 126 GB185
NVIDIA H200 NVL 141GB1125 / 126 GB185
NVIDIA A100 40GB PCIe4129 / 144 GB154
NVIDIA A100 80GB PCIe2126 / 144 GB131
NVIDIA A100 80GB SXM2126 / 144 GB136
NVIDIA H100 PCIe 80GB2126 / 144 GB135
NVIDIA H100 SXM 80GB2126 / 144 GB188
NVIDIA B200 180GB1125 / 162 GB260

Serving and licence

vLLM with --tool-call-parser mistral --enable-auto-tool-choice --reasoning-parser mistral; SGLang also supported. Use the NVFP4 checkpoint on Blackwell and the EAGLE head for speculative decoding.

Apache-2.0. Apache 2.0 permits commercial use, modification and redistribution with no revenue caps.

Model card on Hugging Face

Design a Mistral Small 4 119B A6B (2603) deployment

Preloaded with Mistral Small 4 119B A6B (2603). Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Mistral Small 4 119B A6B (2603) need?

The weights alone take about 238 GB in BF16, 119 GB in FP8 and 66.6 GB in 4-bit. On top of that each request holds a KV cache of about 0.09 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 1.89 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Mistral Small 4 119B A6B (2603)?

For a single user at 8K context in 4-bit, 2 x NVIDIA A100 40GB PCIe (40 GB each) fits, at an estimated 194 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Mistral Small 4 119B A6B (2603) allowed for commercial use?

Mistral Small 4 119B A6B (2603) is released under Apache-2.0. Apache 2.0 permits commercial use, modification and redistribution with no revenue caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve Mistral Small 4 119B A6B (2603) on-prem?

vLLM with --tool-call-parser mistral --enable-auto-tool-choice --reasoning-parser mistral; SGLang also supported. Use the NVFP4 checkpoint on Blackwell and the EAGLE head for speculative decoding.