On-prem models / Mistral AI

Run Mistral Small 3.2 24B Instruct 2506 on-prem

A minor update to Mistral Small 3.1 that improves instruction following, function calling and reduces repetitive output. It is a 24B dense model with a Pixtral vision encoder. Mistral notes it needs about 55GB of GPU RAM at bf16.

24B dense128K contextApache-2.0text + visiontool callingreleased 2025-06

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)48.0 GB1.34 GB5.37 GB21.5 GB
FP824.0 GB0.67 GB2.68 GB10.7 GB
INT4 (AWQ / GPTQ)13.4 GB0.67 GB2.68 GB10.7 GB
GGUF Q4_K_M14.4 GB0.67 GB2.68 GB10.7 GB

KV cache from the published config: 40 layers, 8 KV heads x 128 dims. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

A dependable, licence-clean choice for European plants: good tool calling, document image extraction and multilingual output. Text-to-SQL is adequate for simple queries with schema context.

Strengths

  • Reliable function calling via vLLM
  • Image input for document and screenshot reading
  • Runs on one 24GB to 32GB GPU when quantized
  • Strong European language support

Watch out for

  • No reasoning mode
  • Superseded by Mistral Small 4 for new deployments
  • Full-attention KV cache is larger than hybrid designs at long context

GPUs that run it

One user, 8K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA GeForce RTX 5090 32GB127 / 28 GB41
NVIDIA A100 40GB PCIe127 / 36 GB36
NVIDIA L4 24GB228 / 43 GB13
NVIDIA A10 24GB228 / 43 GB25
NVIDIA L40S 48GB127 / 43 GB21
NVIDIA RTX A6000 48GB127 / 43 GB18
NVIDIA RTX 6000 Ada 48GB127 / 43 GB23
NVIDIA GeForce RTX 4090 24GB228 / 43 GB41

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA GeForce RTX 5090 32GB254 / 57 GB46
AMD Instinct MI210 64GB153 / 57 GB24
NVIDIA A100 40GB PCIe254 / 72 GB40
NVIDIA A100 80GB PCIe153 / 72 GB29
NVIDIA A100 80GB SXM153 / 72 GB31
NVIDIA H100 PCIe 80GB153 / 72 GB30
NVIDIA H100 SXM 80GB153 / 72 GB49
NVIDIA H100 NVL 94GB153 / 84 GB57

Serving and licence

vLLM 0.9.1 or newer with mistral_common 1.6.2 or newer, using --tokenizer_mode mistral --config_format mistral --load_format mistral --tool-call-parser mistral --enable-auto-tool-choice. llama.cpp and Ollama also support it.

Apache-2.0. Apache 2.0 permits commercial use, modification and redistribution with no revenue caps.

Model card on Hugging Face

Design a Mistral Small 3.2 24B Instruct 2506 deployment

Preloaded with Mistral Small 3.2 24B Instruct 2506. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Mistral Small 3.2 24B Instruct 2506 need?

The weights alone take about 48.0 GB in BF16, 24.0 GB in FP8 and 13.4 GB in 4-bit. On top of that each request holds a KV cache of about 0.67 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 13.4 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Mistral Small 3.2 24B Instruct 2506?

For a single user at 8K context in FP8, 1 x NVIDIA GeForce RTX 5090 32GB (32 GB each) fits, at an estimated 41 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Mistral Small 3.2 24B Instruct 2506 allowed for commercial use?

Mistral Small 3.2 24B Instruct 2506 is released under Apache-2.0. Apache 2.0 permits commercial use, modification and redistribution with no revenue caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve Mistral Small 3.2 24B Instruct 2506 on-prem?

vLLM 0.9.1 or newer with mistral_common 1.6.2 or newer, using --tokenizer_mode mistral --config_format mistral --load_format mistral --tool-call-parser mistral --enable-auto-tool-choice. llama.cpp and Ollama also support it.