On-prem models / Mistral AI

Run Mistral Medium 3.5 128B on-prem

Mistral's first merged flagship: a dense 128B model covering instruct, reasoning and coding, replacing Medium 3.1, Magistral and Devstral 2 in Mistral's products. The card reports 77.6 percent on SWE-Bench Verified. Mistral also ships an EAGLE draft model.

128B dense256K contextModified MIT Licensetext + visionthinking modetool callingreleased 2026-04

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)256 GB2.95 GB11.8 GB47.2 GB
FP8128 GB1.48 GB5.91 GB23.6 GB
INT4 (AWQ / GPTQ)71.7 GB1.48 GB5.91 GB23.6 GB
GGUF Q4_K_M76.8 GB1.48 GB5.91 GB23.6 GB

KV cache from the published config: 88 layers, 8 KV heads x 128 dims. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

Excellent quality for complex ERP agents, SQL and code customization, but most mid-size and large manufacturers exceed the 20 million USD monthly revenue cap and would need a commercial licence. Smaller firms can use it freely.

Strengths

  • Highest-quality Mistral open-weight model for agentic coding per the card
  • Configurable reasoning effort
  • Vision encoder trained from scratch for variable image sizes
  • Wide language coverage

Watch out for

  • Revenue cap licence excludes larger enterprises without a paid licence
  • Dense 128B is expensive to serve and has a large KV cache
  • Needs a multi-GPU node at bf16 or FP8

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
NVIDIA H100 NVL 94GB175 / 84 GB31
NVIDIA L4 24GB480 / 86 GB8
NVIDIA A10 24GB480 / 86 GB16
NVIDIA L40S 48GB277 / 86 GB12
NVIDIA RTX A6000 48GB277 / 86 GB11
NVIDIA RTX 6000 Ada 48GB277 / 86 GB14
NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB175 / 86 GB15
NVIDIA RTX PRO 6000 Blackwell Max-Q 96GB175 / 86 GB15

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
AMD Instinct MI210 64GB4194 / 230 GB19
AMD Instinct MI325X 256GB1189 / 230 GB22
Intel Gaudi 3 128GB (HL-325L OAM)2191 / 230 GB23
NVIDIA B300 (Blackwell Ultra) 270GB1189 / 243 GB29
NVIDIA H200 SXM 141GB2191 / 253 GB30
NVIDIA H200 NVL 141GB2191 / 253 GB30
AMD Instinct MI355X 288GB1189 / 259 GB29
NVIDIA A100 40GB PCIe8200 / 288 GB30

Serving and licence

vLLM and SGLang with --tool-call-parser mistral --reasoning-parser mistral --enable-auto-tool-choice; mistral_common 1.11.1 or newer and Transformers 5.4 or newer. Use the EAGLE checkpoint for speculative decoding.

Modified MIT License. Commercial use is free only if your company's global consolidated monthly revenue is 20 million USD or less; larger companies need a commercial licence from Mistral.

Model card on Hugging Face

Design a Mistral Medium 3.5 128B deployment

Preloaded with Mistral Medium 3.5 128B. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Mistral Medium 3.5 128B need?

The weights alone take about 256 GB in BF16, 128 GB in FP8 and 71.7 GB in 4-bit. On top of that each request holds a KV cache of about 1.48 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 29.5 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Mistral Medium 3.5 128B?

For a single user at 8K context in 4-bit, 1 x NVIDIA H100 NVL 94GB (94 GB each) fits, at an estimated 31 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Mistral Medium 3.5 128B allowed for commercial use?

Mistral Medium 3.5 128B is released under Modified MIT License. Commercial use is free only if your company's global consolidated monthly revenue is 20 million USD or less; larger companies need a commercial licence from Mistral. Check the licence text on the model card with your legal team before production use.

Which engine should serve Mistral Medium 3.5 128B on-prem?

vLLM and SGLang with --tool-call-parser mistral --reasoning-parser mistral --enable-auto-tool-choice; mistral_common 1.11.1 or newer and Transformers 5.4 or newer. Use the EAGLE checkpoint for speculative decoding.