On-prem models / Alibaba Qwen

Run Qwen3.5-122B-A10B on-prem

Mid-size Qwen3.5 MoE with 10B active parameters and native vision. Popular as a balance between quality and a single-node footprint.

125B MoE (10B active)256K contextApache-2.0text + visionthinking modetool callingreleased 2026-02

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)250 GB0.20 GB0.81 GB3.22 GB
FP8125 GB0.10 GB0.40 GB1.61 GB
INT4 (AWQ / GPTQ)70.0 GB0.10 GB0.40 GB1.61 GB
GGUF Q4_K_M75.0 GB0.10 GB0.40 GB1.61 GB

KV cache from the published config: 48 layers, 2 KV heads x 256 dims, 12 full-attention layers. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

A sensible on-prem workhorse for a manufacturer's central IT: handles multi-table text-to-SQL, OCR-style extraction from scanned paperwork and multi-step tool use with headroom. Use non-thinking mode for bulk extraction to control latency.

Strengths

  • Runs on 2x80 GB in FP8, or one 80 to 96 GB GPU at short context with the official GPTQ-Int4 repo
  • 10B active keeps throughput high
  • Vision plus 201-language coverage
  • Apache 2.0

Watch out for

  • About 250 GB in BF16
  • Older than Qwen3.6/3.8; coding and agent behaviour improved in later releases
  • Thinking default adds tokens on simple tasks

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
NVIDIA A100 80GB PCIe172 / 72 GB125
NVIDIA A100 80GB SXM172 / 72 GB131
NVIDIA H100 PCIe 80GB172 / 72 GB129
NVIDIA H100 SXM 80GB172 / 72 GB190
NVIDIA H100 NVL 94GB172 / 84 GB212
NVIDIA L4 24GB477 / 86 GB64
NVIDIA A10 24GB477 / 86 GB104
NVIDIA L40S 48GB274 / 86 GB95

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA A100 40GB PCIe4136 / 144 GB118
NVIDIA A100 80GB PCIe2133 / 144 GB98
NVIDIA A100 80GB SXM2133 / 144 GB102
NVIDIA H100 PCIe 80GB2133 / 144 GB101
NVIDIA H100 SXM 80GB2133 / 144 GB145
NVIDIA B200 180GB1131 / 162 GB206
NVIDIA H100 NVL 94GB2133 / 169 GB159
NVIDIA L4 24GB8142 / 172 GB54

Serving and licence

vLLM and SGLang support the Qwen3.5 hybrid (Gated DeltaNet + gated attention) architecture; use a recent release (Qwen3.6 card recommends vllm>=0.19.0 / sglang>=0.5.10), --reasoning-parser qwen3 and --tool-call-parser qwen3_coder; vLLM --language-model-only skips the vision encoder; MTP speculative decoding available. KTransformers supported; llama.cpp/Ollama community GGUFs exist.

Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps.

Model card on Hugging Face

Design a Qwen3.5-122B-A10B deployment

Preloaded with Qwen3.5-122B-A10B. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Qwen3.5-122B-A10B need?

The weights alone take about 250 GB in BF16, 125 GB in FP8 and 70.0 GB in 4-bit. On top of that each request holds a KV cache of about 0.10 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 2.01 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Qwen3.5-122B-A10B?

For a single user at 8K context in 4-bit, 1 x NVIDIA A100 80GB PCIe (80 GB each) fits, at an estimated 125 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Qwen3.5-122B-A10B allowed for commercial use?

Qwen3.5-122B-A10B is released under Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve Qwen3.5-122B-A10B on-prem?

vLLM and SGLang support the Qwen3.5 hybrid (Gated DeltaNet + gated attention) architecture; use a recent release (Qwen3.6 card recommends vllm>=0.19.0 / sglang>=0.5.10), --reasoning-parser qwen3 and --tool-call-parser qwen3_coder; vLLM --language-model-only skips the vision encoder; MTP speculative decoding available. KTransformers supported; llama.cpp/Ollama community GGUFs exist.