On-prem models / Alibaba Qwen

Run Qwen3.6-35B-A3B on-prem

Small hybrid MoE (35B total, 3B active) vision-language model focused on agentic coding and stability. Successor in practice to the Qwen3-30B-A3B class.

36B MoE (3B active)256K contextApache-2.0text + visionthinking modetool callingreleased 2026-04

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)72.0 GB0.17 GB0.67 GB2.68 GB
FP836.0 GB0.08 GB0.34 GB1.34 GB
INT4 (AWQ / GPTQ)20.2 GB0.08 GB0.34 GB1.34 GB
GGUF Q4_K_M21.6 GB0.08 GB0.34 GB1.34 GB

KV cache from the published config: 40 layers, 2 KV heads x 256 dims, 10 full-attention layers. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

Good choice for high-volume, latency-sensitive jobs: classifying and extracting fields from invoices and delivery notes, routing tickets, and simple ERP lookups via tool calls. For hard multi-join SQL a dense 27B or larger MoE is safer.

Strengths

  • Very fast decode for its quality (3B active)
  • Fits one 48 GB GPU at 4-bit or one 80 GB GPU in FP8
  • Tiny KV cache: 10 attention layers with 2 KV heads
  • Thinking preservation option for multi-turn agents
  • Apache 2.0

Watch out for

  • MoE still needs all 35B weights in memory
  • Weaker knowledge depth than 27B dense or larger MoE models
  • Thinking on by default; disable it for low-latency extraction

GPUs that run it

One user, 8K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA L4 24GB240 / 43 GB67
NVIDIA A10 24GB240 / 43 GB117
NVIDIA L40S 48GB138 / 43 GB107
NVIDIA RTX A6000 48GB138 / 43 GB97
NVIDIA RTX 6000 Ada 48GB138 / 43 GB117
NVIDIA GeForce RTX 4090 24GB240 / 43 GB166
NVIDIA GeForce RTX 5090 32GB240 / 57 GB227
AMD Instinct MI210 64GB138 / 57 GB175

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA L4 24GB243 / 43 GB46
NVIDIA A10 24GB243 / 43 GB83
NVIDIA L40S 48GB141 / 43 GB73
NVIDIA RTX A6000 48GB141 / 43 GB66
NVIDIA RTX 6000 Ada 48GB141 / 43 GB80
NVIDIA GeForce RTX 4090 24GB243 / 43 GB124
NVIDIA GeForce RTX 5090 32GB243 / 57 GB180
AMD Instinct MI210 64GB141 / 57 GB124

Serving and licence

vllm>=0.19.0 and sglang>=0.5.10 recommended by the card; official FP8 repo. KTransformers guide available. llama.cpp/Ollama run community GGUFs on builds with qwen3.5 support.

Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps.

Model card on Hugging Face

Design a Qwen3.6-35B-A3B deployment

Preloaded with Qwen3.6-35B-A3B. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Qwen3.6-35B-A3B need?

The weights alone take about 72.0 GB in BF16, 36.0 GB in FP8 and 20.2 GB in 4-bit. On top of that each request holds a KV cache of about 0.08 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 1.68 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Qwen3.6-35B-A3B?

For a single user at 8K context in FP8, 2 x NVIDIA L4 24GB (24 GB each) fits, at an estimated 67 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Qwen3.6-35B-A3B allowed for commercial use?

Qwen3.6-35B-A3B is released under Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve Qwen3.6-35B-A3B on-prem?

vllm>=0.19.0 and sglang>=0.5.10 recommended by the card; official FP8 repo. KTransformers guide available. llama.cpp/Ollama run community GGUFs on builds with qwen3.5 support.