On-prem models / Alibaba Qwen

Run Qwen3.5-9B on-prem

Small dense Qwen3.5 vision-language model, one of the most downloaded Qwen releases of 2026. Same hybrid attention layout as the larger Qwen3.5 models.

9.7B dense256K contextApache-2.0text + visionthinking modetool callingreleased 2026-02

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)19.4 GB0.27 GB1.07 GB4.29 GB
FP89.70 GB0.13 GB0.54 GB2.15 GB
INT4 (AWQ / GPTQ)5.43 GB0.13 GB0.54 GB2.15 GB
GGUF Q4_K_M5.82 GB0.13 GB0.54 GB2.15 GB

KV cache from the published config: 32 layers, 4 KV heads x 256 dims, 8 full-attention layers. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

Good for edge and shop-floor use: label or document field extraction, quick lookups and simple tool calls on modest hardware. Pair it with schema retrieval and validation if used for text-to-SQL.

Strengths

  • Runs on a 24 GB GPU in BF16 and on laptops or edge boxes at 4-bit
  • Image and document understanding at small size
  • Very small KV cache (8 attention layers)
  • Apache 2.0

Watch out for

  • Limited reasoning depth for complex SQL or long agent chains
  • More prone to schema hallucination than 27B+ models
  • Thinking default; turn off for fast extraction

GPUs that run it

One user, 8K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA L4 24GB112 / 21 GB18
NVIDIA A10 24GB112 / 21 GB35
NVIDIA GeForce RTX 4090 24GB112 / 21 GB57
NVIDIA GeForce RTX 5090 32GB112 / 28 GB94
NVIDIA A100 40GB PCIe112 / 36 GB84
NVIDIA L40S 48GB112 / 43 GB49
NVIDIA RTX A6000 48GB112 / 43 GB44
NVIDIA RTX 6000 Ada 48GB112 / 43 GB54

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA L4 24GB117 / 21 GB14
NVIDIA A10 24GB117 / 21 GB28
NVIDIA GeForce RTX 4090 24GB117 / 21 GB45
NVIDIA GeForce RTX 5090 32GB117 / 28 GB76
NVIDIA A100 40GB PCIe117 / 36 GB67
NVIDIA L40S 48GB117 / 43 GB39
NVIDIA RTX A6000 48GB117 / 43 GB35
NVIDIA RTX 6000 Ada 48GB117 / 43 GB43

Serving and licence

vLLM and SGLang support the Qwen3.5 hybrid (Gated DeltaNet + gated attention) architecture; use a recent release (Qwen3.6 card recommends vllm>=0.19.0 / sglang>=0.5.10), --reasoning-parser qwen3 and --tool-call-parser qwen3_coder; vLLM --language-model-only skips the vision encoder; MTP speculative decoding available. KTransformers supported; llama.cpp/Ollama community GGUFs exist. Single-GPU (TP 1) launch lines are in the card.

Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps.

Model card on Hugging Face

Design a Qwen3.5-9B deployment

Preloaded with Qwen3.5-9B. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Qwen3.5-9B need?

The weights alone take about 19.4 GB in BF16, 9.70 GB in FP8 and 5.43 GB in 4-bit. On top of that each request holds a KV cache of about 0.13 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 2.68 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Qwen3.5-9B?

For a single user at 8K context in FP8, 1 x NVIDIA L4 24GB (24 GB each) fits, at an estimated 18 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Qwen3.5-9B allowed for commercial use?

Qwen3.5-9B is released under Apache-2.0. Apache 2.0: commercial use, modification and redistribution allowed with notice; no usage caps. Check the licence text on the model card with your legal team before production use.

Which engine should serve Qwen3.5-9B on-prem?

vLLM and SGLang support the Qwen3.5 hybrid (Gated DeltaNet + gated attention) architecture; use a recent release (Qwen3.6 card recommends vllm>=0.19.0 / sglang>=0.5.10), --reasoning-parser qwen3 and --tool-call-parser qwen3_coder; vLLM --language-model-only skips the vision encoder; MTP speculative decoding available. KTransformers supported; llama.cpp/Ollama community GGUFs exist. Single-GPU (TP 1) launch lines are in the card.