GPUs for on-prem AI / NVIDIA

NVIDIA RTX 6000 Ada 48GB for LLMs

Ada workstation card with FP8 and no NVLink. FP8 is half NVIDIA's 1,457 TFLOPS sparse figure; BF16 is derived as half of dense FP8. Price is an indicative 2026 street range for one unit, not a quote.

Memory
48 GB GDDR6
Bandwidth
960 GB/s
BF16 dense
364 TFLOPS
FP8 dense
728 TFLOPS
Power
300 W

workstation card | PCIe Gen4 only | CUDA | indicative price $6,500-8,000

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Llama 3.3 70B Instruct70B114421
Qwen3.6-35B-A3B36B / 3B1182196
Qwen3-32B32.8B129222
Olmo 3.1 32B Think32B130115
GLM-4.7-Flash31.2B / 3B1177173
Gemma 4 31B IT30.7B131223
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B1159153
Granite 4.2 30B30B132224
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B11851111
Qwen3.8-27B27.8B135118
Gemma 3 27B IT27B135117
Gemma 4 26B A4B IT25.2B / 3.8B1145160
Mistral Small 3.2 24B Instruct 250624B139118
Magistral Small 1.2 (2509)24B139118
Devstral Small 2 24B Instruct 251224B139118
gpt-oss-20b21B / 3.6B1159181
Phi-414B163125
Gemma 4 12B IT11.95B173133
Qwen3.5-9B9.7B190148
Qwen3-VL-8B-Instruct8.8B194136
Granite 4.2 8B8B1101137
Llama 3.1 8B Instruct8B1102140
Mistral Medium 3.5 128B128B214413
Qwen3.5-122B-A10B125B / 10B2103491
Ling-3.0-flash124B / 5.1B21664145
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B284474
Mistral Small 4 119B A6B (2603)119B / 6.5B21444125
gpt-oss-120b117B / 5.1B21674134
Command A (03-2025)111B216416
Llama 4 Scout 17B-16E Instruct109B / 17B266449
Qwen3-Coder-Next79.7B / 3B22132131
Hy3295B / 21B4768 (multi-node)44
Command A+ (05-2026)218B / 25B4808 (multi-node)65
Step-3.7-Flash198B / 11B41328 (multi-node)88
Qwen3.8-Flash-Next180B / 6B41748 (multi-node)107
MiniMax-M3428B / 23B8 (multi-node)7816 (multi-node)64
Qwen3.5-397B-A17B403B / 17B8 (multi-node)8616 (multi-node)75
Llama 4 Maverick 17B-128E Instruct400B / 17B8 (multi-node)9616 (multi-node)75
Trinity Large Thinking398B / 13B8 (multi-node)9216 (multi-node)73
GLM-5.3-Flash320B / 18B8 (multi-node)998 (multi-node)76
MiMo-V2.6-Flash-RL309B / 15B8 (multi-node)1028 (multi-node)79
MiMo-V2.6-Pro-RL1020B / 42B16 (multi-node)6332 (multi-node)59
Kimi-K2.61000B / 32B16 (multi-node)7432 (multi-node)69
Kimi-K2.7-Code1000B / 32B16 (multi-node)7432 (multi-node)69
Muse Spark Open 816B-A42B816B / 42B16 (multi-node)6724 (multi-node)56
DeepSeek-V4.1-Flash-1017748B / 16B16 (multi-node)11524 (multi-node)101
GLM-5.3744B / 40B16 (multi-node)6024 (multi-node)51
Mistral Large 3 675B Instruct 2512675B / 41B16 (multi-node)6924 (multi-node)58
DeepSeek-V3.2671B / 37B16 (multi-node)7124 (multi-node)60
DeepSeek-V4-Pro-08131600B / 49B24 (multi-node)6840 (multi-node)60
Kimi-K32800B / 104B40 (multi-node)44--
Qwen3.8-2.4T-A95B2446B / 95B40 (multi-node)4664 (multi-node)44

Design a deployment on NVIDIA RTX 6000 Ada 48GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one NVIDIA RTX 6000 Ada 48GB?

Of the models we track, Llama 3.3 70B Instruct (70B) fits on a single 48 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is NVIDIA RTX 6000 Ada 48GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 960 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 120 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is NVIDIA RTX 6000 Ada 48GB a good choice for on-prem AI?

Ada workstation card with FP8 and no NVLink. FP8 is half NVIDIA's 1,457 TFLOPS sparse figure; BF16 is derived as half of dense FP8. Price is an indicative 2026 street range for one unit, not a quote.