GPUs for on-prem AI / NVIDIA

NVIDIA RTX A6000 48GB for LLMs

Ampere workstation card; 48GB at 300W makes 2-4 card workstations practical for 70B at 4-bit. No FP8. NVIDIA lists 309.7 TFLOPS tensor with sparsity, halved here. Price is an indicative 2026 street range for one unit, not a quote.

Memory
48 GB GDDR6
Bandwidth
768 GB/s
BF16 dense
155 TFLOPS
FP8 dense
no
Power
300 W

workstation card | NVLink bridge 112.5 GB/s (2 GPUs) | CUDA | indicative price $3,500-5,000

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Llama 3.3 70B Instruct70B111417
Qwen3.6-35B-A3B36B / 3B1154179
Qwen3-32B32.8B123218
Olmo 3.1 32B Think32B124112
GLM-4.7-Flash31.2B / 3B1149160
Gemma 4 31B IT30.7B125219
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B1134143
Granite 4.2 30B30B126219
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B1156191
Qwen3.8-27B27.8B128115
Gemma 3 27B IT27B128114
Gemma 4 26B A4B IT25.2B / 3.8B1122149
Mistral Small 3.2 24B Instruct 250624B132115
Magistral Small 1.2 (2509)24B132115
Devstral Small 2 24B Instruct 251224B132115
gpt-oss-20b21B / 3.6B1133167
Phi-414B151120
Gemma 4 12B IT11.95B160127
Qwen3.5-9B9.7B174139
Qwen3-VL-8B-Instruct8.8B178129
Granite 4.2 8B8B183130
Llama 3.1 8B Instruct8B184132
Mistral Medium 3.5 128B128B211410
Qwen3.5-122B-A10B125B / 10B287478
Ling-3.0-flash124B / 5.1B21444128
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B271464
Mistral Small 4 119B A6B (2603)119B / 6.5B21234108
gpt-oss-120b117B / 5.1B21444116
Command A (03-2025)111B213413
Llama 4 Scout 17B-16E Instruct109B / 17B254440
Qwen3-Coder-Next79.7B / 3B21912112
Hy3295B / 21B4658 (multi-node)38
Command A+ (05-2026)218B / 25B4678 (multi-node)56
Step-3.7-Flash198B / 11B41158 (multi-node)80
Qwen3.8-Flash-Next180B / 6B41588 (multi-node)100
MiniMax-M3428B / 23B8 (multi-node)7116 (multi-node)58
Qwen3.5-397B-A17B403B / 17B8 (multi-node)8016 (multi-node)69
Llama 4 Maverick 17B-128E Instruct400B / 17B8 (multi-node)8916 (multi-node)68
Trinity Large Thinking398B / 13B8 (multi-node)8616 (multi-node)68
GLM-5.3-Flash320B / 18B8 (multi-node)918 (multi-node)68
MiMo-V2.6-Flash-RL309B / 15B8 (multi-node)948 (multi-node)71
MiMo-V2.6-Pro-RL1020B / 42B16 (multi-node)5832 (multi-node)55
Kimi-K2.61000B / 32B16 (multi-node)6932 (multi-node)64
Kimi-K2.7-Code1000B / 32B16 (multi-node)6932 (multi-node)64
Muse Spark Open 816B-A42B816B / 42B16 (multi-node)6224 (multi-node)51
DeepSeek-V4.1-Flash-1017748B / 16B16 (multi-node)10924 (multi-node)95
GLM-5.3744B / 40B16 (multi-node)5624 (multi-node)47
Mistral Large 3 675B Instruct 2512675B / 41B16 (multi-node)6324 (multi-node)53
DeepSeek-V3.2671B / 37B16 (multi-node)6624 (multi-node)55
DeepSeek-V4-Pro-08131600B / 49B24 (multi-node)6340 (multi-node)56
Kimi-K32800B / 104B40 (multi-node)42--
Qwen3.8-2.4T-A95B2446B / 95B40 (multi-node)4364 (multi-node)42

Design a deployment on NVIDIA RTX A6000 48GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one NVIDIA RTX A6000 48GB?

Of the models we track, Llama 3.3 70B Instruct (70B) fits on a single 48 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is NVIDIA RTX A6000 48GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 768 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 96 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is NVIDIA RTX A6000 48GB a good choice for on-prem AI?

Ampere workstation card; 48GB at 300W makes 2-4 card workstations practical for 70B at 4-bit. No FP8. NVIDIA lists 309.7 TFLOPS tensor with sparsity, halved here. Price is an indicative 2026 street range for one unit, not a quote.