Mobile inventory and traceabilityInfor LNRuns on-prem

Infor Factory Track with Infor LN: barcode inventory, labor and lot or serial traceability

Infor Factory Track is plant-floor and warehouse automation covering barcode inventory handling, inbound logistics, job material transactions, labor collection and lot and serial traceability. Infor lists it for both SyteLine and LN. This page focuses on how an LN site should think about it, and mentions SyteLine where the picture differs.

How Infor Factory Track connects to Infor LN

Native Infor add-on

Factory Track is an Infor product, so the vendor owns the ERP link. The product brochure lists SyteLine and LN. The way transactions reach LN (the specific business objects, sessions or interfaces) varies by release, so get the integration design from Infor for your LN version rather than assuming it matches SyteLine.

ERP master data as the source of truth

Items, warehouses, locations, orders and lot or serial rules are defined in LN. Factory Track consumes them on handhelds and kiosks, so LN setup quality directly sets scan quality.

What data moves

FromToDataWhen
Infor LNFactory TrackItems, warehouses, locations, purchase and production ordersScan lookup or scheduled refresh
Factory TrackInfor LNInbound receipts and putawayScan at the receiving dock
Factory TrackInfor LNMaterial issues to production ordersScan at the work center
Factory TrackInfor LNLabor time against order operationsOperator clock on and off
Factory TrackInfor LNLot and serial numbers captured with each movementScan of the lot or serial label

Setting it up

  1. 1Confirm LN support and releaseAsk Infor for the supported LN version, required components and licensing for Factory Track before design starts.
  2. 2Review lot and serial setup in LNCheck which items are lot or serial controlled, numbering rules, and whether inventory is tracked by lot at each warehouse.
  3. 3Define the traceability goalDecide whether you need forward and backward genealogy for recall or customer reporting, and which transactions must capture lot numbers.
  4. 4Design labels and scan pointsPlace scan points where material changes state: receipt, issue, completion, shipment. Design labels carrying the lot or serial.
  5. 5Configure transactions and rolesEnable only needed transactions, set required fields, and restrict adjustments.
  6. 6Pilot and run a mock recallTrace a finished lot back to supplier lots and forward to customers using only system data. Fix gaps before roll-out.
  7. 7Train and document fallbacksWrite down manual entry paths in LN for outages.

What usually breaks

  • !Traceability is only as good as the least disciplined scan; one skipped lot scan breaks a genealogy chain.
  • !Items that are lot controlled in one warehouse but not another cause confusing errors on the handheld.
  • !Unit of measure and conversion differences between LN and the scan label lead to quantity errors on issue.
  • !Labor collected without the right operation reference lands in the wrong cost bucket.
  • !An LN upgrade or customisation can change the interface behind the module; retest after every update.
  • !Mixing backflushing and manual issue for the same component double counts consumption.

A private AI layer across both systems

Mock recall and genealogy questions

A private assistant can answer which finished lots used a given supplier lot and which customers received them, citing the LN records it read, for a quality manager to verify.

Traceability gap detection

It can scan completed orders for consumption without lot numbers and list them so gaps are fixed while memory is fresh.

Scan exception triage

It can group rejected transactions by cause (closed order, wrong warehouse, missing lot) and suggest the correction for approval.

Cross-system questions

Planners can ask in plain language what is on hand by lot, or why an order is waiting on material, answered from LN data on your own servers.

Try it here, free

Infor Factory Track Warehouse Mobility and Time Track Transaction Reference (CSI / SyteLine)

Open full tool

Every common Factory Track Warehouse Mobility transaction for CloudSuite Industrial and SyteLine, with what the user scans, what it does and the usual gotcha.

When something else fits better

  • Third-party barcode and WMS products for LN may fit better in complex warehouses; check which are supported for your release.
  • LN's native warehousing and manufacturing sessions with manual entry can suffice if volumes are low and traceability needs are modest.
  • A dedicated quality or traceability system may be better if regulators demand electronic batch records or genealogy beyond ERP lots.

Frequently asked questions

Is Factory Track the same on LN and SyteLine?

Infor lists both ERPs on the product page, but the ERP integration underneath differs by product. Treat features as common in concept and confirm exact screens, transactions and versions for LN with Infor.

Does it help with recalls?

It captures lot and serial numbers at movements, which is the data a recall trace needs. Whether the trace works depends on scan discipline and LN setup, so run a mock recall before you rely on it.

Can this run on-prem?

Infor LN is commonly deployed on-prem, and Factory Track is an Infor add-on. Hosting options depend on release and contract, so request the architecture and server requirements.

What does Netray add?

A private AI layer that reads LN and Factory Track data on your own infrastructure to answer traceability questions, find gaps and triage exceptions. It is read-only by default, and writes require human approval.

Pairing documented at www.infor.com/products/factory-track . Infor Factory Track is a product of Infor; Netray is independent and not affiliated with either vendor.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software