Automotive Core Tools and CQI Guidelines Reference: Which Standard Covers What

Automotive quality work is spread across many documents from AIAG, VDA and ISO, and suppliers constantly need to know which one answers a given audit question. This lookup lists the core tools, the CQI guidelines and the common VDA references with a one-line plain use for each.

Download:
ReferenceTitlePublisherGroupTypical use in a supplier plant
APQP
Advanced Product Quality Planning and Control Plan
AIAG
Core tool
Plans a new product launch through phases and defines the control plan structure.
PPAP
Production Part Approval Process
AIAG
Core tool
Evidence package submitted to the customer to release a part for production.
FMEA
Potential Failure Mode and Effects Analysis (AIAG and VDA handbook)
AIAG and VDA
Core tool
Design and process risk analysis with Action Priority rather than RPN alone.
MSA
Measurement Systems Analysis
AIAG
Core tool
Gage R&R, bias, linearity and stability studies on measuring equipment.
SPC
Statistical Process Control
AIAG
Core tool
Control charts and capability indices for key characteristics.
CQI-8
Layered Process Audits Guideline
AIAG
CQI
Tiered, short, frequent process audits by supervisors and management.
CQI-9
Special Process: Heat Treat System Assessment
AIAG
CQI special process
Self-assessment and audit of heat treat furnaces, pyrometry and process control.
CQI-11
Special Process: Plating System Assessment
AIAG
CQI special process
Covers electroplating and related plating lines, bath control and testing.
CQI-12
Special Process: Coating System Assessment
AIAG
CQI special process
Covers paint and coating processes such as spray, powder and e-coat.
CQI-14
Automotive Warranty Management Guideline
AIAG
CQI
Structures warranty analysis, field data flow and learning back into design.
CQI-15
Special Process: Welding System Assessment
AIAG
CQI special process
Covers resistance, arc and other welding processes and their controls.
CQI-17
Special Process: Soldering System Assessment
AIAG
CQI special process
Covers soldering of electronic assemblies, including reflow and wave.
CQI-19
Sub-tier Supplier Management Process Guideline
AIAG
CQI
How a supplier selects, monitors and develops its own sub-tier suppliers.
CQI-23
Special Process: Molding System Assessment
AIAG
CQI special process
Covers plastic and rubber molding process controls.
CQI-24
Design Review Based on Failure Mode (DRBFM)
AIAG
CQI
Focused design review of changes and their failure modes.
CQI-27
Special Process: Casting System Assessment
AIAG
CQI special process
Covers casting processes such as die casting and foundry operations.
VDA 6.3
Process Audit
VDA QMC
VDA
Process audit method used by German OEMs for suppliers and for internal audits.
VDA 6.5
Product Audit
VDA QMC
VDA
Audit of the finished product against specification and customer requirements.
VDA 2
Production Process and Product Approval (PPA)
VDA QMC
VDA
German OEM counterpart to PPAP for part and process approval.
VDA 19
Technical Cleanliness (inspection of technical cleanliness)
VDA QMC
VDA
Particle cleanliness of components such as fuel, brake and e-drive parts.
IMDS
International Material Data System
Automotive industry (hosted by Hamburg-based provider)
Reporting
Material declaration of parts to OEMs for substance and recycling compliance.
ISO 26262
Road vehicles, Functional safety
ISO
Standard
Functional safety lifecycle for electrical and electronic systems with ASIL levels.

Reference list only. Edition numbers change, so always confirm the current edition and your customer's specific requirements before an audit or submission.

Standards register from your quality system

Optional: we can review how your customer requirements and standards register could be linked to your ERP quality data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this list

Type a process name or number into the search box, for example welding, CQI-9 or audit, and the table narrows to matching rows. The Group column separates the five core tools from special process assessments, general CQI guidelines and VDA documents. Export the filtered rows to Excel to build the standards register that auditors ask for during an IATF 16949 certification or customer audit. Keep the register next to your document control list so the edition and review date sit beside each reference.

Core tools versus CQI guidelines

The five core tools are APQP, PPAP, FMEA, MSA and SPC. IATF 16949 requires suppliers to use them, and customers reference them in their customer specific requirements. The CQI guidelines are different: they are assessments and good-practice guides published by AIAG, and many OEMs mandate specific ones for the relevant process. A plant with a furnace is typically expected to complete the heat treat assessment, a plating line the plating assessment, and so on.

  • Special process assessments are process specific
  • Layered process audits and warranty guides are general management tools
  • Check each customer's requirements for which assessments they accept

VDA and AIAG side by side

German OEMs often use VDA 6.3 for process audits and VDA 2 for approval, while North American customers use PPAP and CQI assessments. Many suppliers serve both and must keep two vocabularies. The AIAG and VDA FMEA handbook is shared by both organisations, which helps. When you serve both, map your internal audit programme so one process audit covers the VDA 6.3 questions and the CQI items together.

Common mistakes

The most common error is treating a CQI assessment as a one-time exercise. Assessments are meant to be repeated, normally at least yearly, with actions tracked. Another is citing the wrong edition in a procedure. A third is assuming a standard applies because it is popular rather than because the customer requires it. Read your customer specific requirements first, then use this table to find the matching guide.

Frequently Asked Questions

Is CQI-9 required by IATF 16949?

IATF 16949 itself does not name CQI-9. Many OEM customer specific requirements do require suppliers with heat treat processes to complete the CQI-9 assessment, so the requirement usually arrives through the customer, not the standard.

What is the difference between PPAP and VDA 2?

Both release a part and process for series production. PPAP is the AIAG method used by most North American and many global OEMs. VDA 2 is the German equivalent and uses its own submission levels and documents. Follow whichever the customer specifies.

Are the core tools the same as the CQI guidelines?

No. The core tools are APQP, PPAP, FMEA, MSA and SPC. The CQI series is a separate set of AIAG guidelines and process assessments, covering things like welding, plating and layered process audits.

Does this list replace the standards?

No. It is a pointer to what each document covers. The official documents are copyrighted and must be purchased from AIAG, VDA QMC or ISO. Use this list to find the right one, then use the actual document.

If your standards register, audit findings and customer requirements sit in different systems, Netray can help connect them to your ERP and quality data with a private, on-prem assistant.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Integrations

Comparisons