Quality & InspectionFree worksheetPDF, Excel, Word exportAutomotive

Production Control Plan Worksheet for PPAP (Excel Export)

The control plan describes how each important product and process characteristic is controlled during production. In PPAP it is submitted with the PFMEA and process flow. This worksheet lays out the standard columns so you can fill it row by row and export it to Excel.

Free, optional. Reopen it on any device.
Download:
Op no.Machine / deviceCharacteristicClassSpecification / toleranceMeasurement methodSample sizeFrequencyControl methodReaction plan
Total samples per cycle
10
Control points
4

The control plan is a living document. Use the prototype, pre-launch or production phase your customer expects and keep it aligned with the PFMEA and process flow.

Want inspection plans compared to your control plan?

Optional review of how ERP inspection plans can be checked against a PPAP control plan.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to fill each column

Use the same operation numbers as the process flow and PFMEA. List product characteristics from the drawing and process characteristics such as temperature, pressure or torque. Give each a specification with units, the measurement method including gage type, a sample size and a frequency, and a control method. The reaction plan should say what the operator does next, who is notified and how suspect product is contained. Vague entries like 'inform quality' are a frequent audit finding.

  • Link every special characteristic to a control
  • State frequency as a number and a unit of time or quantity
  • Name the gage so the MSA study can be traced
  • Write reaction plans as actions, not intentions

Choosing control methods

Poka-yoke and automatic checks are stronger than visual checks, and SPC suits variable data with enough volume to chart. Go/no-go gages are fast but give attribute data only. First piece approval protects against setup errors but not drift. Choose the method that matches the PFMEA detection rating you claimed, because a control plan that relies on a visual check cannot support a detection score of 2.

Reading the example

The example shows four operations with different control strengths. The bore diameter is a fit and function characteristic charted by SPC with hourly samples. The wash residue is critical, so it is controlled by lot sampling with a hold. The summary counts control points and total samples per cycle, which helps you estimate inspection labour for the run at rate study.

Common mistakes

Typical failures are mismatched operation numbers, specifications copied without units, sample sizes with no basis, and reaction plans that never mention containment. Review the control plan whenever the process, gage or customer requirement changes, and record the revision. If your ERP or MES holds routings and inspection plans, keep the characteristic and operation references identical there.

Frequently Asked Questions

What are the three control plan phases?

The AIAG control plan manual describes prototype, pre-launch and production phases. Prototype covers build and test of prototype parts, pre-launch covers the stage after prototype and before full production, and production is the full-volume control. Mark the phase on the header.

Does a control plan replace work instructions?

No. The control plan summarises what is controlled and how often. Detailed steps, setup values and gage handling belong in work instructions or inspection instructions that the control plan references.

How is sample size decided?

Base it on process capability, risk and customer requirements. Stable capable processes can use smaller or less frequent samples, while new or marginal processes need more. Document the rationale and review it after the initial process study.

Can I export this worksheet?

Yes. Download it as Excel, CSV or PDF using the export buttons and add your company header and revision details in the exported file.

If your inspection plans live in an ERP such as SAP QM or SyteLine, Netray can help check them against your control plan with read-only access.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP