Casting Defect Troubleshooting Checklist: Porosity, Shrinkage, Sand and Metal Faults
When castings start to fail inspection, speed matters. This checklist lists what experienced foundry people check, grouped by the type of defect, so you can work through likely causes in order instead of guessing. Print it or save it as a PDF for the shift review.
0 of 39 items complete
9 critical items still open - these are the highest-risk gaps.
Gas porosity and pinholes
Shrinkage and feeding
Inclusions, slag and dross
Sand and mold defects
Cracks, tears and distortion
Dimensions and records
Tick each check you have completed. Start with the group matching the defect appearance, then review records. The list does not replace metallurgical examination, radiography or sectioning when the cause is not clear.
Scrap reason codes and trends
Optional: a review of how scrap and defect data is recorded in your ERP or MES.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Start by naming the defect from its appearance and location. A rounded smooth cavity is usually gas, a rough dendritic cavity at a hot spot is usually shrinkage, and a spongy area at the surface may be sand or core gas. Go to the matching group and tick off each check. Items marked critical are the ones most often found to be the cause. Record findings with the heat, mold and time so you can find a pattern across shifts.
Gas or shrinkage
Confusing gas porosity with shrinkage leads to the wrong fix. Gas defects are usually spherical, smooth and often near the surface or under cores, and respond to venting, drier sand and degassing. Shrinkage is angular or dendritic and sits at heavy sections away from risers, and responds to better feeding, chills and pouring temperature control. Increasing riser size to fix gas defects wastes metal, and degassing more will not cure shrinkage.
- Smooth round cavity: suspect gas
- Rough interior, dendrites: suspect shrinkage
- Surface slag or dross stringers: suspect inclusions
- Cavity under a core: check core gas and venting
Closing the loop
A defect fix is only proven when scrap falls over many molds, not after one good shot. Change one variable at a time and note it in the process log. Monitor the scrap code for at least a week. Use sectioning, X-ray or dye penetrant testing on sample castings to confirm the defect type before spending on tooling changes. For safety-critical or customer-reported failures, run a formal 8D or corrective action report.
Common mistakes and ERP notes
Most foundries lose time because scrap is coded loosely, such as a single 'defective' reason. Use specific reason codes so Pareto charts mean something. In the ERP or MES, tie scrap and rework quantities to the heat, mold line and pattern so trends can be seen. Without heat and mold traceability the checklist yields opinions rather than evidence.
Frequently Asked Questions
How do I tell gas porosity from shrinkage porosity?
Gas porosity tends to be smooth, round and sometimes shiny, while shrinkage is rough, angular or dendritic and appears at the last-to-freeze section. Sectioning the casting and examining the cavity wall usually settles it.
What causes hot tears in castings?
Hot tears form while the casting is still weak and is restrained from contracting, often at sharp section changes or where cores and mold resist movement. Better radii, more collapsible cores and controlled pour temperature help.
Should I change the riser or the pouring temperature first?
Confirm the defect type first. Shrinkage points to feeding and temperature; gas points to venting, moisture and metal quality. Change one variable at a time and track scrap over many molds.
Does this checklist cover die casting?
It is written mainly for sand casting. Many ideas, such as gas, shrinkage and inclusions, carry across, but die casting adds shot profile, die temperature and lubricant factors that need their own list.
If scrap reasons and heat numbers are not captured consistently in your ERP, we can help set up the codes and reports that make defect trends visible.
Related Tools
Casting Yield Calculator
Calculate casting yield from casting, gating and riser weights, then see the metal you must actually charge per good casting after scrap and melt loss.
Industry TemplatesCasting Shrinkage Allowance Reference Table
Look up typical linear shrinkage allowances by alloy for sand casting patterns, with conversions to inches per foot and millimetres per metre.
Engineering & PLMCasting Pattern Allowance Worksheet
Compute pattern dimensions from finished size, machining stock per side and shrink percent, feature by feature, and export the table to Excel.
Costing & FinanceFoundry Melt Loss Calculator
Convert your melt loss percentage into kilograms, cost per heat and annual cost, then test the saving from improving loss by a few tenths of a point.
Quality & InspectionHeat Treat Certification Template
Generate a clean heat treatment certificate with process data, hardness results, furnace identification and signature blocks.
More Quality & Inspection tools
See all- Casting Nonconformance and Disposition Template
- Casting Scrap by Defect Pareto Worksheet
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
Keep exploring
Free tools
- Casting Scrap by Defect Pareto WorksheetRecord scrap by defect type with quantity and unit cost, and see the cost and average value per scrapped casting.
- Casting Nonconformance and Disposition TemplateA nonconformance report built for castings, with defect type, location on the part, heat number, containment and a disposition decision.
- Casting Shrinkage Allowance Reference TableLook up typical linear shrinkage allowances by alloy for sand casting patterns, with conversions to inches per foot and millimetres per metre.
Guides
- Casting Defect Root Cause: Porosity, Shrinkage and Scrap AnalysisFind root causes of porosity, shrinkage, cold shuts and inclusions by linking scrap to heat, die, pattern, shift and process data, and use AI to spot patterns.
- Casting Quote Estimating for FoundriesHow foundries estimate casting quotes: pour weight, yield, melt loss, core and finishing cost, tooling amortization, and where AI speeds up the first draft.
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.