Heat Treat Certification Template: Certificate of Heat Treatment
Customers and auditors ask for a heat treat certificate with every shipment: what process was done, at what temperature and time, in which furnace, and what hardness was achieved. This template builds a clean certificate you can print, save as a PDF or edit in Word.
Fill in
Heat Treat Certification Template
Certificate of Heat Treatment
Certificate no: HT-2026-04417 Processor: Northfield Thermal Processing Date processed: 2026-10-16 Customer: Ridgeway Gear Works Purchase order: PO-77120
Product
| Part number / rev | Lot or heat | Quantity | Material |
|---|---|---|---|
| SH-4140-221 Rev C | L24-0918 | 40 | AISI 4140 bar |
Process
| Item | Value |
|---|---|
| Specification | Customer spec CS-HT-12 Rev B |
| Process | Quench and temper |
| Soak temperature (C) | 845 |
| Time at temperature | 90 min |
| Quench | Oil |
| Temper | 540 C for 120 min |
| Furnace / load | Furnace 4, Load 2291 |
Hardness
Requirement: 28 to 34 HRC
Results: Sample 1: 31 HRC Sample 2: 30 HRC Sample 3: 32 HRC
Remarks
Parts processed as a single load. Thermocouple and instrument calibration current at time of run.
Statement
We certify that the material described above was heat treated in accordance with the specification and process data shown. Records are retained and are available for review.
Approvals
A starting point, not a controlled form. Add the clauses, nadcap or customer flowdown wording, test method and instrument references your customer contract requires, and have your quality manager approve the format.
Certificates attached to lots in your ERP
Optional: a review of how supplier certificates are matched to receipts and lots.
Optional. The tool and every export work without this. No spam.
How to use it
Fill in the certificate number, customer, purchase order, part, lot and quantity. Enter the specification, process type, soak, quench and temper data and the furnace and load number. Record the measured hardness values and the requirement. The preview updates as you type; export to PDF or Word when you are done, then sign. Keep the load sheet, chart recorder or data logger file and calibration reference linked to the certificate number.
What a good certificate contains
A useful certificate states who processed the parts, which lot or heat it applies to, the specification and revision, the actual process parameters rather than just nominal ones, the test method and results, and an authorised signature. Aerospace and defense customers may also require traceability to furnace class and pyrometry compliance such as AMS2750, a Nadcap accreditation reference where applicable and a statement of material and test equipment calibration. Include only claims your quality system can support.
- Link to the actual furnace chart or logger file
- State the spec and revision, not only the spec number
- Report measured values, not just pass or fail
- Record the test method and scale used
How to read and check one
On receiving a certificate, check the part number, revision, quantity and lot against the packing slip and purchase order. Confirm the process matches the drawing note, the hardness values fall within the requirement and the test scale is the right one for the section size. A certificate with no furnace or load reference is hard to defend in an audit. Reject certificates where numbers are rounded to nominal values every time, because that suggests the data are copied rather than recorded.
Common mistakes and ERP notes
Frequent faults are missing revision, a quantity that does not match the shipment, and a certificate number that is not unique. In the ERP, the certificate is typically a document attached to the receipt or the outside process purchase order, with the lot number as the traceability key. Store certificate number, spec and result on the receiving inspection record so a recall or audit can find every part treated in one load.
Frequently Asked Questions
What must a heat treat certificate include?
Processor name, certificate number, customer and purchase order, part number and revision, lot or heat, quantity, specification, process parameters, test results, furnace or load reference, date and an authorised signature. Add customer flowdown items as required.
Is this template valid for Nadcap or AS9100 work?
It is a generic starting point. Nadcap or AS9100 customers may specify extra content and form control. Have your quality manager approve the final format and wording before use.
Can I use it for outside heat treat suppliers?
Yes. Ask the supplier to complete it, or use it as a model for what you require on their certificate in your purchase order terms.
Can I save it as a Word file?
Yes. Fill in the fields and use the Word export to continue editing, or export a PDF for sign-off. Nothing is stored by the page unless you export it.
If certificates are collected as PDFs in email, we can help attach and read them against receipts and lots in your ERP.
Related Tools
Heat Treatment Furnace Load Worksheet
Build a furnace load sheet row by row: pieces, unit weight, section thickness and process, with total load weight and a planning soak time.
Quality & InspectionCasting Defect Troubleshooting Checklist
A practical checklist of what to check when castings show gas porosity, shrinkage, inclusions, sand defects, cracks or dimensional problems.
Discrete ManufacturingForging Press Tonnage Estimator
Estimate the press force needed for open die or closed die forging from projected area, flow stress and a shape complexity factor, with a safety margin.
Aerospace & DefenseAMS 2750 Furnace Class and Uniformity Reference
Furnace classes 1 to 6 with the temperature uniformity range, plus how to read a class against a heat treat specification.
More Quality & Inspection tools
See all- Heat Treat Pyrometry AMS2750 Readiness Checklist
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
Keep exploring
Free tools
- Heat Treat Furnace Batch Log WorksheetAn editable batch log for furnace loads: part, process, load weight, setpoint, soak time, quench medium, hardness and pass or hold status.
- Heat Treatment Furnace Load WorksheetBuild a furnace load sheet row by row: pieces, unit weight, section thickness and process, with total load weight and a planning soak time.
- Steel Heat Treatment Processes ReferenceQuick lookup of common heat treatment processes with typical temperature ranges, cooling method and what each one is used for.
Guides
- AI for Commercial Heat Treating Shops: Quotes, Spec Review and CertsWhere AI helps in a commercial heat treating shop: reading POs and specs, drafting quotes by weight and cycle, checking certs, answering furnace record questions.
- NADCAP Heat Treat Audit Preparation for a Small Heat Treating ShopPreparing a small heat treating shop for a NADCAP audit: AMS 2750 pyrometry, TUS and SAT records, AC7102 checklist items and the paperwork auditors pull first.
- Heat Treatment and Testing Costs in Forging QuotesHow to price heat treatment, mechanical testing, NDT and certification into a forging quote, including in-house versus outside processing and lot charges.
Manufacturing hubs
- Metal Treating Institute and commercial heat treating: standards and ERP realitiesMetal Treating Institute and commercial heat treating: furnaces, Nadcap, AMS 2750 and CQI-9 records, plus the ERP, quoting and private AI issues heat treaters face.
- American Gear Manufacturers Association (AGMA): gear standards, quality and ERP for gear shopsAGMA gear manufacturers ecosystem: gear standards, accuracy grades, heat treat and inspection, plus quoting, ERP and private AI problems for gear shops.