claude_desktop_config.json Generator for MCP Servers
Claude Desktop reads a JSON file that lists the local MCP servers to launch. A missing comma or a single backslash on Windows is enough to stop a server from loading. This generator produces a clean mcpServers entry you can paste in.
Fill in
On Windows, double every backslash in JSON.
claude_desktop_config.json
{
"mcpServers": {
"erp-readonly": {
"command": "node",
"args": [
"C:\\mcp\\erp-server\\dist\\index.js",
"--read-only"
],
"env": {
"ERP_BASE_URL": "https://erp.example.com/api",
"ERP_API_TOKEN": "REPLACE_WITH_SERVICE_TOKEN"
}
}
}
}Where the file lives
Windows: %APPDATA%\Claude\claude_desktop_config.json macOS: ~/Library/Application Support/Claude/claude_desktop_config.json Fully quit and reopen Claude Desktop after editing. Open the developer settings to read the server logs if the server does not appear.
If the file already has an mcpServers object, add your entry beside the existing ones instead of pasting a second mcpServers key. Never commit real tokens. Use a least-privilege service account for the env value. Verify the file path and options against the current Claude Desktop documentation for your version.
Roll out MCP to my ERP team
Optional: we can help design a read-only ERP MCP server and a safe rollout plan.
Optional. The tool and every export work without this. No spam.
How to use it
Enter a short server name, choose how the server starts (node, python, npx, uvx or docker), give the script or package, and add any arguments. Put the ERP base URL and a service token in the env section, not on the command line, so they are not visible in process listings. Copy the output into your config file, keeping valid JSON, then restart the app fully, not just close the window.
- Use a dedicated read-only ERP service account
- Double backslashes in Windows paths
- Keep one entry per server and unique names
What each key does
The mcpServers object maps a name to a launch definition. Command is the executable, args is the list of arguments passed to it, and env adds environment variables to the child process. Desktop starts the process and speaks MCP over standard input and output. That is why the server must write protocol messages only to stdout and logs to stderr, otherwise the handshake breaks.
Reading the result and debugging
After a restart, your tools should appear in the tools menu. If not, check three things in order: the JSON parses (paste it into any validator), the command resolves on the PATH Desktop sees (node or npx installed for all users), and the server starts by itself in a terminal without errors. Log files in the Claude logs folder show the launch error and the stderr output from your server.
Common mistakes
Frequent problems include smart quotes pasted from documents, trailing commas, relative script paths, relying on a shell profile for PATH, and storing production admin credentials in the file. Remember the file is plain text on the user's machine. For shared or regulated environments, prefer a remote server with proper authentication over distributing secrets to laptops.
Frequently Asked Questions
Where is claude_desktop_config.json on Windows?
It is normally under %APPDATA%\Claude\ in a file named claude_desktop_config.json. You can also open it from the developer section of the Claude Desktop settings, which creates it if it does not exist yet.
Why does my server not show up?
Most often the JSON is invalid, the command is not on the PATH, or the server crashes at start. Run the same command in a terminal first, then check the Claude Desktop log files for stderr output.
Can I put secrets in the env block?
You can, and it is common for local use, but the file is plain text. Use a least-privilege service account, restrict file permissions, and avoid reusing a personal admin token.
Does this work for remote MCP servers?
This file launches local processes. Remote servers are generally added through the connectors or integrations settings rather than a command entry, so check the current product documentation for your plan.
If you need MCP access to your ERP rolled out safely across a team, Netray can design the server, the roles and the deployment with you.
Related Tools
MCP Server Tool Definition JSON Generator
Fill in a tool name, description and one parameter to get a valid MCP tool definition with an inputSchema and behavior annotations.
AI Agents & AutomationMCP Server Security Checklist
Work through authentication, authorization, input handling, prompt injection, secrets, logging and deployment before an MCP server touches ERP data.
Developer ToolsMCP Server Deployment Runbook Template
A fill-in runbook covering host, secrets, network, health checks, monitoring and rollback for an MCP server in front of an ERP.
AI Agents & AutomationAI Agent Tool Permission Worksheet
Inventory each agent tool, score its blast radius and decide who approves it before an AI agent touches ERP data.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- MCP Server Tool Definition JSON GeneratorFill in a tool name, description and one parameter to get a valid MCP tool definition with an inputSchema and behavior annotations.
- ERP Record JSON Schema GeneratorDefine an item, order or supplier record as JSON Schema with types, patterns, enums and required fields for validation and AI tool input.
- CAPA Record JSON Payload GeneratorBuild a clean JSON payload for a corrective and preventive action record to test an API, seed a sandbox or define an integration contract.
AI on your ERP
- AI for QuickBooks Enterprise, Built for Small ManufacturersAdd AI to QuickBooks Enterprise Manufacturing and Wholesale without sending books to the cloud. Private LLMs grounded in your QODBC or SDK data.
- JD Edwards MCP Server: Exposing EnterpriseOne to AI Agents SafelyBuild an MCP server for JD Edwards EnterpriseOne: expose AIS data services and Orchestrator as governed AI agent tools, with security, approval and audit.
Integrations
- How to use Claude with Infor M3How to connect Claude to Infor M3: a connector over the M3 API via MCP, cloud options (Anthropic API, Bedrock, Vertex), data handling, and an on-prem alternative.
- How to connect Claude to SAP ECC 6.0Connect Claude to SAP ECC 6.0 through an MCP connector, the Anthropic API, AWS Bedrock or Google Vertex, and see when an on-prem open model is the better fit.