JSON Schema Generator for ERP Records
Most bad ERP integrations fail on data shape: a wrong unit of measure, a part number with a stray space, a cost sent as text. A JSON Schema catches these before a record reaches the ERP. This generator builds one for an item master style record.
Fill in
JSON Schema
{
"$schema": "https://json-schema.org/draft/2020-12/schema",
"$id": "https://example.com/schemas/item.json",
"title": "Item master record",
"type": "object",
"properties": {
"itemNumber": { "type": "string", "pattern": "^[A-Z0-9-]{3,30}$" },
"description": { "type": "string", "maxLength": 60 },
"uom": { "enum": ["EA", "KG", "M", "L"] },
"itemType": { "enum": ["make", "buy", "phantom"] },
"unitCost": { "type": "number", "minimum": 0, "maximum": 1000000 },
"leadTimeDays": { "type": "integer", "minimum": 0, "maximum": 365 },
"lotTracked": { "type": "boolean", "default": false },
"effectiveDate": { "type": "string", "format": "date" },
"suppliers": {
"type": "array",
"items": {
"type": "object",
"properties": {
"supplierId": { "type": "string" },
"leadTimeDays": { "type": "integer", "minimum": 0 }
},
"required": ["supplierId"]
}
}
},
"required": ["itemNumber", "description", "uom", "itemType"],
"additionalProperties": false
}Field names are generic examples, not the columns of any specific ERP. Map them to your entity. JSON Schema validates shape only: business rules such as valid supplier ids or open periods still need checks against the ERP.
Check my ERP data contracts
Optional: we can review your schemas and validation flow before agents write anything.
Optional. The tool and every export work without this. No spam.
How to use it
Set the key field and its regex pattern, the list of allowed units and item types, and numeric limits for length and cost. Copy the schema into your validator of choice, such as Ajv in JavaScript or jsonschema in Python, and run every inbound payload through it. The same document can serve as the inputSchema of an AI tool, so the model is constrained to valid shapes from the start.
- Use enum for coded values like UoM
- Set additionalProperties to false on inbound data
- List required fields explicitly
What the keywords do
Type fixes the base type. Pattern applies a regular expression to strings, which is ideal for part numbers and document ids. Enum restricts a value to a known list. Minimum and maximum bound numbers, and maxLength bounds strings, which also protects against fields that exceed the column width in the ERP. Format with date or date-time documents intent, although validators may only assert it when configured to do so.
Reading the example
The default describes an item with a key, a 60 character description, a unit, a make or buy type, a cost, a lead time, lot tracking and a nested list of suppliers. Required fields are the minimum an ERP would reject a record without. Limits are examples; set them from your actual field lengths and business ranges, not from this sample.
Common mistakes
Teams often validate only at the final API, leave additionalProperties open so typos pass silently, use numbers for ids that carry leading zeros, and forget that decimals in JSON are floating point, so money may need string or integer minor units. Version your schemas alongside the API and test them with both valid and invalid sample files.
Frequently Asked Questions
Which JSON Schema draft does this use?
Draft 2020-12, declared in the $schema keyword. Most current validators support it. If your tool needs draft-07, the keywords used here are largely compatible, but check array and reference handling.
Can I use it as an MCP or function tool schema?
Yes, a plain object schema with properties and required works as an input schema. Some clients restrict advanced keywords, so keep to simple types, enums and patterns for tool inputs.
Does this replace ERP validation?
No. It checks structure and ranges. The ERP still validates business rules such as existing master data, open periods and authorizations, and its errors should be surfaced to the caller.
How should I model money?
Either as a string with a decimal pattern or as an integer in minor units, together with a currency code. Binary floating point can introduce rounding errors in totals.
If you want validated, permissioned data flowing between your ERP and AI tools, Netray can help design the schemas and the services around them.
Related Tools
OpenAPI Spec Skeleton Generator for ERP Endpoints
Create an OpenAPI 3.0 YAML starting point for an ERP resource with list and get operations, paging and a record schema.
Developer ToolsMCP Server Tool Definition JSON Generator
Fill in a tool name, description and one parameter to get a valid MCP tool definition with an inputSchema and behavior annotations.
Developer ToolsWebhook Payload Template Generator
Design a consistent JSON webhook payload for ERP events, with an idempotency id, versioning and signature header guidance.
AI Agents & AutomationAI Agent Tool Permission Worksheet
Inventory each agent tool, score its blast radius and decide who approves it before an AI agent touches ERP data.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Invoice Extraction JSON Schema GeneratorCreate a JSON Schema that defines and validates the structure of extracted invoice data, including header fields, line items, confidence scores and review flags.
- CAPA Record JSON Payload GeneratorBuild a clean JSON payload for a corrective and preventive action record to test an API, seed a sandbox or define an integration contract.
- Aerospace Lot Traceability Record JSON GeneratorBuilds a structured JSON record linking material heat, certificate, specification, work order and serial numbers for AS9100 traceability.
Guides
- Preparing Your ERP Data for AI: A Practical GuidePrepare ERP data for AI use: extraction patterns, schema documentation, and the data quality checks that determine whether your copilot is trustworthy.
- SyteLine Upgrade Error Resolution: Complete GuideResolve common SyteLine upgrade errors including schema migration failures, customization conflicts, and post-upgrade validation issues step by step.