Engineering & PLMFree worksheetPDF, Excel, Word exportEngineer-to-Order Machinery

Configurable BOM Option Cost and Price Rollup Worksheet

Configure-to-order and ETO builders often quote from a base machine plus a set of options. This worksheet lets estimators and sales engineers toggle each option, apply scrap and labor, and see how cost, price, hours and blended margin move with the configuration.

Free, optional. Reopen it on any device.
Download:
Item or optionOption groupSelected (1 yes, 0 no)QtyUnit material costScrap and yield loss (%)Labor hours per unit (hrs)Labor rate ($/hr)Target margin (%)Line costLine labor hoursLine price
$9,012
38 hrs
$13,253
$4,734
7 hrs
$6,763
$11,282
46 hrs
$17,094
$4,722
12 hrs
$6,746
$0
0 hrs
$0
$1,227
4 hrs
$1,635
Configuration cost
$30,977
Configuration price
$45,491
Total labor hours
107 hrs
Gross profit
$14,514
Blended margin on price
31.9%
Price per labor hour
$425

Line cost = selected flag x (quantity x unit cost x (1 + scrap) + quantity x labor hours x rate). Price = cost / (1 - target margin), so margin is stated on price. Use one row per BOM line or option, set Selected to 0 for options the customer has not chosen, and remember that mutually exclusive options need a manual check. Replace example costs with current standard cost from your ERP.

Quote from live BOM and routing costs

Optional: see how a private assistant could roll up configured cost from your ERP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the worksheet

List each BOM line or option as a row with its option group, quantity, unit material cost, scrap, labor hours per unit and labor rate. Set the Selected flag to 1 for lines in the quoted configuration and 0 for options not chosen. The worksheet computes line cost, labor hours and price at your target margin, and the totals give configuration cost, price and blended margin. Change a flag and the totals update immediately, so you can price several configurations in turn.

  • Use current standard or latest purchase cost for materials
  • Keep labor hours per unit from routings or time studies
  • Export to Excel to attach the configuration to the quote

Formulas used

Material cost per line is quantity times unit cost times one plus the scrap or yield loss percentage. Labor cost is quantity times hours per unit times the labor rate. Line cost is their sum multiplied by the selected flag. Price is cost divided by one minus target margin, which gives the stated margin on selling price rather than a markup on cost; a 30 percent margin needs a markup of about 43 percent. Blended margin is total gross profit divided by total price.

Reading the totals

Compare the blended margin with the sum of the individual targets: if a high-margin option is deselected, the blended margin drops. Price per labor hour is a quick check on how well the configuration monetises the shop. If it falls below your target, the options with heavy labor and low margin need repricing. Build one tab per typical configuration to compare, such as standard, extended and fully equipped.

Common mistakes

Common errors are applying markup percentages as if they were margins, forgetting scrap on purchased and fabricated parts, ignoring labor on supposedly simple options, and not updating costs after supplier price changes. Mutually exclusive options also cause errors: selecting both a standard and a premium drive double counts. Finally, avoid rolling up engineering for custom options here; add a separate line for it.

  • Check exclusive options manually before quoting
  • Refresh unit costs at least quarterly
  • Keep option groups consistent with your ERP configurator

Frequently Asked Questions

What is the difference between margin and markup?

Margin is profit as a share of selling price, markup is profit as a share of cost. A 30 percent margin equals about a 43 percent markup. This worksheet uses margin on price, because it is the figure finance and sales leaders usually track.

How do I handle options that exclude each other?

Group them and set only one to 1. The worksheet does not enforce exclusivity, so check each configuration before quoting. Your ERP configurator can enforce these rules when you are ready to automate.

Where should unit costs come from?

Use the standard cost or latest purchase price from your ERP item master, and update them regularly. For quoted purchased items use the supplier quote, noting its validity date.

Does this include engineering for custom options?

No. It prices the BOM and labor content of standard options. Add engineering as a separate row, or use the engineering hours estimator to build that line for custom work.

Netray can connect a configurator to live ERP costs, BOMs and routings so quotes roll up cost automatically with human approval. Ask for an assessment of your quote process.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP