SAP Business One BOM Cost Rollup Worksheet
Before a bill of materials goes into Business One, someone should check that its material cost makes sense. This worksheet rolls up component cost with a scrap allowance so you can compare it with the cost the system shows.
| Component | Type | Qty per parent | Scrap allowance (%) | Unit cost | Extended cost | |
|---|---|---|---|---|---|---|
$4 | ||||||
$6 | ||||||
$15 | ||||||
$2 | ||||||
$1 |
Scrap allowance is entered as a percent of the quantity per parent. Add labour and overhead outside this sheet, or as separate lines with a type of your choice. Compare the result with the item cost shown in Business One after loading the BOM.
BOM data check
Ask for help comparing your BOM data against costs and item master settings before loading.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
List each component from the BOM with the quantity needed for one parent unit, a scrap allowance and the current unit cost. The extended cost column multiplies quantity by one plus the scrap percentage by the unit cost. The total is the material cost per finished unit. Add or delete rows, then export to Excel to share with engineering and finance.
The formula
Extended cost equals quantity times (1 plus scrap divided by 100) times unit cost. Scrap here is the extra quantity you expect to consume beyond the theoretical requirement, due to cutting loss, setup or rejects. If the BOM already includes the scrap in its quantity, enter zero to avoid double counting. Sub-assemblies should carry their own rolled-up cost from a separate sheet or from the system.
Using it with Business One
Business One production BOMs list components with quantities per parent, and production orders consume them at the configured issue method. Item cost depends on your valuation method, for example standard, moving average or FIFO, so the system cost may differ from this sheet when purchase prices move. Use the sheet as a sanity check on newly migrated BOMs, not as a replacement for the system's costing.
- Explode one finished good fully and compare each line
- Check units of measure for each component
- Investigate any line more than a few percent away from the system cost
Common mistakes
Mixing purchase UoM and inventory UoM, such as costing per metre against a quantity in millimetres. Forgetting packaging and consumables. Using a stale price list. Entering scrap twice, once in the BOM quantity and once here.
Frequently Asked Questions
Does this replace Business One costing?
No. It is a check on material cost for one BOM. The system's valuation method, overhead and variance accounts determine actual postings. Differences are a prompt to investigate, not necessarily an error.
How should I treat scrap?
Enter the expected extra consumption as a percent of the theoretical quantity. Base it on measured yield. If a process loses 5 percent, enter 5. Do not add scrap if the BOM quantity already includes it.
How do I cost multi-level BOMs?
Roll up the lowest level first, then enter each sub-assembly's cost as a unit cost in the parent sheet. Repeat up the structure. This keeps each sheet short and easy to audit.
Can I add labour and overhead?
Yes. Add lines with a quantity in hours and a rate as the unit cost. Keep the type labelled, so you can separate material from conversion cost when comparing with the system.
If you want BOM and cost anomalies flagged automatically from live ERP data, Netray can build a read-only reporting layer for your system.
Related Tools
SAP Business One Data Migration Mapping Worksheet
An editable tracker that maps legacy data to Business One objects with record counts, cleansing progress and owners.
SAPSAP Business One Cycle Count Variance Worksheet
An editable worksheet that compares system and counted stock, values the variance and shows the percentage before you post the inventory adjustment.
SAPSAP Business One User Acceptance Test Script Template
A fill-in UAT script for one Business One scenario, with prerequisites, numbered steps, expected results and a sign-off block.
SAPSAP Business One Go-Live Readiness Checklist
A five-group checklist to confirm an SAP Business One implementation is ready for cutover, with the critical blockers marked.
More SAP tools
See all- SAP Business One Production Order Checklist
- SAP B1 Item Master Import Template (DTW)
- SAP B1 MRP Setup Readiness Assessment
- SAP B1 Implementation Cost Calculator
- SAP Business One Implementation Project Charter Template
- SAP Business One License and 5-Year TCO Calculator
- SAP B1 Reorder Point, Safety Stock and EOQ Calculator
- SAP B1 Production Order Cost Variance Calculator
- SAP B1 Landed Cost Allocation Calculator
New to SAP Business One? Start with the SAP Business One guide and toolkit.
Keep exploring
Free tools
- SAP Standard Cost Estimate BOM Rollup CalculatorCheck a unit cost with scrap, setup per lot and overhead surcharges, the way a costing run (CK11N or CK40N) builds it.
- SAP Business One Database Tables ReferenceSearchable lookup of the core SAP Business One tables, with the matching row table and what each one stores.
- SAP Business One Production Order ChecklistA step-by-step checklist for creating, releasing, issuing to, receiving from and closing a production order in SAP Business One.
ERP fixes and how-tos
- SAP Business One production planning: MRP, production orders, cost and variancesSAP Business One production planning end to end: MRP, planned to released orders, cost rollup, variance reporting and when you need a manufacturing add-on.
- Production standard cost in SAP Business One: how it works and where it stopsHow standard cost works for production orders in SAP Business One: valuation method, issue and receipt values, variances at close and process limits.
- SAP Business One production process flow: from BOM to production order to receiptThe SAP Business One production process flow from bill of materials to production order, issue, receipt and close, with the reports and tables used.
Runs with your ERP
- SOLIDWORKS to SAP Business One with BOM Creator: items, BOMs and drawingsHow Servtronica BOM Creator pushes SOLIDWORKS and SOLIDWORKS PDM items, BOMs and drawings into SAP Business One, with setup steps and common pitfalls.
- Spreadsheet Server with SAP Business One: live Excel reporting on inventory, sales and costHow insightsoftware Spreadsheet Server gives Excel live drill-down on SAP Business One inventory, sales and production cost data, with setup and pitfalls.
- ECOSIRE shop floor data collection with SAP Business One: OEE, setup and alternativesHow ECOSIRE's shop floor terminal for SAP Business One records clock-ons, scrap and OEE, plus ECOSIRE alternatives such as beas, ProcessForce and an MES.
AI on your ERP
- AI on SAP Business One for Electronics Manufacturers: BOMs, Shortages and TraceabilityPrivate AI on SAP Business One for electronics makers: multi-level BOM questions, component shortages, lot and serial traceability, RoHS and obsolescence checks.
- AI for SAP Business One, Without Sending Your Books to a Public APIAdd AI to SAP Business One without sending customer data or financials to a public API. Service Layer and DI API integration, sized for an SMB budget.
Integrations
- How to add AI agents to SAP Business OneHow to put AI agents on SAP Business One: Service Layer tool design, read-only first, draft documents for human approval, and an on-prem model option.
- How to use ChatGPT with SAP Business OneUsing ChatGPT with SAP Business One: exports versus live Service Layer access, custom GPT actions, enterprise data controls, and when a private model fits better.
Software
- SAP Business OneSAP Business One explained for small manufacturers: modules, Service Layer and DI API, deployment, limits, alternatives and where AI helps on top of it.
- SAP Business ByDesignSAP Business ByDesign explained: cloud ERP modules for midsize firms, extensibility, integration options, limits, alternatives and where AI fits.