Costing & FinanceFree calculatorPDF, Excel, Word export

Contract Manufacturer Job Quote Price Calculator

Small shops quote dozens of jobs a week, and a missed setup or forgotten tooling charge can erase the margin. This calculator builds a quote from the real cost elements and shows the quantity price break.

Your numbers

100 units
$
hrs
min
$/hr
$

Plating, heat treat, coating, per unit.

$
%
30 %

Your results

Total quote price
$2,789
Unit price
$28
Units to start
104
Material cost
$666
Setup plus run cost
$773
Outside processing cost
$114
Total cost
$1,953

Excludes freight, packaging, payment terms and sales commission. Add these to a cost line before sending a quote.

Free, optional. Reopen it on any device.
Save results:

Unit price vs quote quantity

Sweeps Quote quantity from 1 to 2000, holding your other inputs fixed.

Connect quotes to job costing

Optional: discuss comparing quoted and actual cost in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the quantity and per unit material. Add setup hours and run time per unit, priced at your combined machine and labor rate. Include outside processing per unit and any tooling you will not reuse. Set the scrap allowance so the shop starts enough pieces to ship the quoted quantity, then choose the margin on price. The result is both the job total and a unit price.

The calculation

Units to start equal quantity divided by one minus scrap, rounded up. Material and outside processing scale with started units. Setup is paid once, run time scales with started units. Total cost adds tooling, and price equals cost divided by one minus margin. Because setup and tooling are fixed, unit price falls as quantity rises.

  • Setup and tooling are amortized over the quantity
  • Scrap allowance matters most on small orders
  • Margin is on price, not markup on cost
  • Round prices up to the nearest sensible unit

Using the price break chart

The curve is steep at low quantities and flattens near the variable cost. Read quantity breaks from the knee: the point where doubling quantity saves less than a few percent. Quote breaks at 1, 10, 50, 100, 500 and so on, and avoid offering a break below the quantity at which the cost curve is still steep.

Common mistakes

Quoters often use a shop rate without setup, ignore the cost of rejects and quote tooling as free to win the order. Also verify the machine rate against actual hours; a rate that ignores idle time leads to quotes that lose money at real utilization.

Frequently Asked Questions

Should I use margin or markup for quotes?

Margin on price is easier to compare with financial statements. A 30 percent margin equals a 42.9 percent markup on cost. Mixing the two is a common reason shops under price.

How do I price setup for repeat jobs?

If the setup is repeated each run, include it every time. If a fixture is kept, bill the tooling once and quote lower setup afterwards. Make the policy visible on the quote.

What scrap allowance is reasonable?

It depends on the process. Stable turned parts may run under 2 percent, while complex fabrications, castings or first articles can be 5 percent or more. Use your own history and revisit it quarterly.

Does the tool add freight and tax?

No. Add freight, packaging and any commission as extra cost before applying margin, and handle sales tax separately on the invoice.

Once quotes live in your ERP, Netray can compare quoted cost with actual job cost and show where estimates drift.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP