Db2 for i SQL Services Query Generator (IBM i Health Queries)
Db2 for i includes SQL services in the QSYS2 schema that return system information as rows, so you can check object sizes, locks and jobs without writing CL. This generator builds the common queries for a library you name.
Fill in
The data library to inspect.
Subsystem to filter active jobs.
Largest objects in the library
SELECT OBJNAME, OBJTYPE, OBJSIZE, LAST_USED_TIMESTAMP
FROM TABLE(QSYS2.OBJECT_STATISTICS('PRODDTA', '*FILE')) AS O
ORDER BY OBJSIZE DESC
FETCH FIRST 25 ROWS ONLY;Tables with the most rows
SELECT TABLE_SCHEMA, TABLE_NAME, NUMBER_ROWS, DATA_SIZE FROM QSYS2.SYSTABLESTAT WHERE TABLE_SCHEMA = 'PRODDTA' ORDER BY NUMBER_ROWS DESC FETCH FIRST 25 ROWS ONLY;
Active jobs in a subsystem by CPU
SELECT JOB_NAME, AUTHORIZATION_NAME, SUBSYSTEM, JOB_STATUS, CPU_TIME FROM TABLE(QSYS2.ACTIVE_JOB_INFO(SUBSYSTEM_LIST_FILTER => 'QBATCH')) AS J ORDER BY CPU_TIME DESC FETCH FIRST 25 ROWS ONLY;
Locks on objects in the library
SELECT SYSTEM_OBJECT_SCHEMA, SYSTEM_OBJECT_NAME, OBJECT_TYPE, LOCK_STATE, JOB_NAME FROM QSYS2.OBJECT_LOCK_INFO WHERE SYSTEM_OBJECT_SCHEMA = 'PRODDTA';
Disabled user profiles
SELECT AUTHORIZATION_NAME, STATUS, PREVIOUS_SIGNON FROM QSYS2.USER_INFO WHERE STATUS = '*DISABLED' ORDER BY PREVIOUS_SIGNON;
System status snapshot
SELECT * FROM QSYS2.SYSTEM_STATUS_INFO;
These services need a supported IBM i release (most need 7.3 or later) with current Db2 PTF groups, and authority to the objects queried. Column lists differ slightly by release, so run a SELECT * once and adjust the column list if a column is missing.
Plain-English questions over your IBM i data
Optional: a read-only assistant that turns questions into queries like these, shows the SQL, and runs on your own server.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the data library that holds your JD Edwards World files, pick an object type and a subsystem, then copy the queries into STRSQL, Run SQL Scripts in IBM i Access Client Solutions or any SQL client with a JDBC or ODBC connection to the partition. Run them one at a time and export the results to a spreadsheet when you need to share them. All six queries are read-only.
What each query tells you
OBJECT_STATISTICS shows size and last used date, which is how you find unused files and fast growing objects. SYSTABLESTAT shows row counts and data size from the catalog statistics. ACTIVE_JOB_INFO shows live jobs and CPU use. OBJECT_LOCK_INFO shows who holds locks, useful when a nightly job waits on a file. USER_INFO helps clean up profiles that are disabled or unused.
- OBJECT_STATISTICS: size and last used
- SYSTABLESTAT: rows and data size
- ACTIVE_JOB_INFO: live job CPU
- OBJECT_LOCK_INFO: lock holders
- USER_INFO: profile status
Reading the results
A file with millions of rows and a last used date several years ago is a candidate for archive. A job in a batch subsystem with high CPU time may be looping. Locks held by an interactive job on a file a batch job needs explain many late nightly runs. NUMBER_ROWS counts include deleted rows in some cases, so reorganize files before treating counts as exact.
Common mistakes
Running table functions with a library name in the wrong case or with a missing quote returns an empty set rather than an error. Using system names instead of SQL names for long named tables returns surprises. Do not run these on a busy production system with very broad filters during peak hours, and test on a non-production partition before putting them in a scheduled job.
Frequently Asked Questions
Which IBM i release do I need?
Most of these services exist from IBM i 7.3 onward, and newer releases add more columns and services. If a view or function is missing, check your Db2 for i PTF group level against the IBM documentation before assuming it is unsupported.
Do these queries change any data?
No. All six are SELECT statements over system views and table functions. They only need read authority to the objects, although some views show more rows to users with special authorities like all-object.
Why are my row counts different from COUNT(*)?
SYSTABLESTAT values come from catalog statistics and can include deleted records until a reorganization. Use SELECT COUNT(*) FROM your table when you need an exact figure, especially for reconciliation.
Can I use these with JD Edwards World files?
Yes. World files are Db2 for i physical files, so the same services work. Use the data library name such as your production data library. JD Edwards file names with short system names may need quoting.
If you want these checks combined with ERP data into one question and answer interface that stays on your hardware, talk to us about a private build.
Related Tools
IBM i CL Command Cheat Sheet
A searchable lookup of the CL commands operators and JDE World support staff use daily, grouped by task with a short note on each.
OracleJD Edwards Julian Date (CYYDDD) SQL Converter
Build SQL that converts the CYYDDD Julian dates stored in JD Edwards files into real dates, converts a date back, and filters by date range.
ERP OperationsIBM i Disk Capacity Runway Calculator
Enter total and used disk, your yearly growth and a threshold to see how many months of headroom you have left.
OracleIBM i System Values Reference
A searchable table of the IBM i system values that matter for security, date handling, job limits and startup, with the reason each one is checked.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
New to IBM i (AS/400) ERPs? Start with the IBM i (AS/400) ERPs guide and toolkit.
Keep exploring
Free tools
- IBM i (DB2 for i) SQL Data Extraction Script GeneratorGenerate DB2 for i SQL to inspect a file, count rows, and extract records with Julian date filters for JD Edwards World or other IBM i data.
- JD Edwards World F0011 Batch Control Status SQL Generator (Db2 for i)Generate Db2 for i SQL that lists F0011 batch headers by type, status and date, decodes status through UDC 98/IC and counts unposted F0911 lines per batch.
- JD Edwards World Private AI Layer Blueprint GeneratorFill in your JD Edwards World version, database, hosting and users to get a shareable architecture plan for a private, on-prem AI assistant.
ERP fixes and how-tos
- How to Add a Private AI Layer to JD Edwards World on IBM iAdd AI to JD Edwards World without moving data: DB2 for i access, journal-based replication, rebuilt row security, local GPUs and approved batch write-back.
- How to Add a Private AI Layer to JD Edwards EnterpriseOne On-PremAdd a private AI layer to JD Edwards EnterpriseOne: AIS data service, Orchestrator, Security Workbench mapping, a local model and human approval.
- How to set up JD Edwards Orchestrator (step by step)Set up a working JD Edwards Orchestrator end to end: enable the AIS server, build a form or service request, wire it into an orchestration, and call it over REST.
Runs with your ERP
- RF-SMART Manufacturing Data Collection for JD Edwards WorldShop floor barcode data collection for JD Edwards World with RF-SMART: what it reports, how it connects, setup steps, pitfalls and a private AI layer on top.
- Vertex Tax Connectors with JD Edwards EnterpriseOneHow Vertex calculates sales, use and VAT tax for JD Edwards EnterpriseOne and World, plus Oracle EBS and Cloud ERP: integration model, flows, setup, pitfalls.
- RF-SMART and JD Edwards EnterpriseOne: Barcode Scanning and Mobile WMSHow RF-SMART connects barcode scanning to JD Edwards EnterpriseOne and World: integration method, data flows, setup steps, pitfalls and where private AI helps.
AI on your ERP
- AI for JD Edwards World on IBM i, without a EnterpriseOne migrationAdd AI to JD Edwards World on IBM i without replatforming: read the physical files safely, ground an LLM on your data, and keep control on the box you already run.
- JD Edwards AI Consulting: How to Scope and Implement AI on EnterpriseOneJD Edwards AI consulting and implementation: scope, phases, Orchestrator and AIS design, security, cost and partner questions for EnterpriseOne and World.
Integrations
- How to add an AI chatbot to JD Edwards WorldAdd an AI chatbot to JD Edwards World on IBM i: grounded in DB2 for i data, role-aware, web or Teams front end, and fully on-prem with open models.
- How to build an MCP server for JD Edwards WorldBuild a Model Context Protocol server for JD Edwards World on IBM i: tools to expose, DB2 for i auth, transports, permission scoping and audit.