EU REACH SVHC Compliance Checklist for Manufacturers
REACH requires companies placing articles on the EU market to know whether those articles contain Substances of Very High Concern above 0.1 percent by weight, and to tell customers when they do. This checklist turns that duty into steps for product compliance, supplier quality and engineering teams in manufacturing.
0 of 29 items complete
10 critical items still open - these are the highest-risk gaps.
Role and scope
Candidate List screening
Supplier data
Communication and notification
Management and change
REACH obligations depend on your role (manufacturer, importer, downstream user, or producer of articles) and on tonnage. Confirm your role and the current lists with ECHA and your legal adviser.
Screen your BOM against supplier declarations
We can outline a private workflow that matches part numbers with declarations stored in your ERP and file shares. Optional.
Optional. The tool and every export work without this. No spam.
How to use this checklist
Start with your role and scope, then work through screening, supplier data, communication and change control. Tick only the items you can evidence with a document or a system record. Export the result and use the gaps as the agenda for your next compliance review. Run the checklist again whenever ECHA updates the Candidate List, since new substances can instantly change the status of existing products without any design change on your side.
The rules behind the checklist
Under REACH, the Candidate List identifies substances of very high concern. If an article contains such a substance above 0.1 percent weight by weight, the supplier must give recipients enough information to allow safe use, at least the substance name (Article 33). Consumers can request it, and the supplier must reply within 45 days. Suppliers of articles must also submit information to the SCIP database under the Waste Framework Directive. Producers and importers may have a separate notification duty to ECHA above one tonne a year.
- 0.1 percent applies to each article, not the whole product
- Article 33 covers professional recipients and consumers on request
- SCIP notification is a separate duty from Article 33
- The Candidate List is updated a couple of times per year
Worked example
A control panel contains a connector housing, a cable and a PCB. A new Candidate List update adds a substance used in a cable sheath at 0.3 percent of that cable. The cable is an article within the product, so the 0.1 percent test applies to the cable, and the panel maker must inform customers and file a SCIP notification. If the same substance were found at 0.05 percent, no communication would be triggered, but the record should be kept.
Common mistakes
Frequent errors include calculating the threshold on the finished product, relying on out-of-date supplier declarations, forgetting spares and packaging, and treating a RoHS declaration as proof of REACH status. They are different laws with different substance lists. In the ERP, keep a REACH status attribute on the part or item revision so a new supplier part cannot be released without a declaration.
Frequently Asked Questions
What does 0.1 percent apply to?
The 0.1 percent weight-by-weight threshold applies to each article incorporated in a complex product, following the court ruling often referred to as once an article, always an article. It is not calculated across the whole finished product.
Is REACH the same as RoHS?
No. RoHS restricts a short list of substances in electrical and electronic equipment. REACH covers a much wider range of substances and has communication, notification and authorisation duties. Compliance with one does not prove compliance with the other.
What is the SCIP database?
SCIP is an ECHA database of information on articles containing Candidate List substances above 0.1 percent. Suppliers of such articles in the EU submit information so that waste operators and consumers can access it later.
How often should we screen?
Each time ECHA updates the Candidate List, and whenever a part, supplier or material changes. Many manufacturers also run an annual full review of supplier declarations to catch expired or inconsistent data.
If you want to cross-check your bill of materials against supplier declarations held in your ERP and document stores, Netray can help build that review on infrastructure you control.
Related Tools
EU REACH Article 33 Supplier SVHC Request Template
A supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
Compliance & ContractsSVHC Candidate List Article Screening Worksheet
Log each SVHC found in a component, compute its concentration in the article and flag when the 0.1% w/w threshold is exceeded.
Compliance & ContractsRoHS Compliance Declaration Template
Fill in product and company details to produce a RoHS declaration that lists the restricted substances, limits, exemptions and evidence basis.
Compliance & ContractsSupplier Material Declaration Request Letter Template
A fill-in letter that asks a supplier for substance and material declarations, with a response deadline and a list of the data you need back.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- EU REACH Article 33 Supplier SVHC Request TemplateA supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
- REACH SVHC Supplier Declaration Response TemplateFill in a clear supplier declaration that answers a customer's REACH SVHC request with Candidate List version, substances and safe use information.
- REACH SVHC Article Concentration and Notification CalculatorTest an SVHC against the 0.1% w/w threshold in each article and the 1 tonne per year trigger for notification to ECHA.