REACH SVHC Supplier Declaration Response Template
Customers in the EU routinely ask suppliers whether any article contains a Candidate List substance above 0.1%. This template gives you a clean, consistent answer you can issue per part and keep on file.
Fill in
REACH SVHC Supplier Declaration Response Template
REACH SVHC Declaration
Supplier: Brightline Components Ltd Customer: Northgate Electronics GmbH Article: PN-48213 Rev C Date: 2026-10-20
Scope and basis
This declaration relates to Regulation (EC) No 1907/2006 (REACH) and the Candidate List as of January 2026 of substances of very high concern (SVHC) proposed for authorisation. It applies to the article named above as supplied by Brightline Components Ltd.
Statement
Result: No SVHC above 0.1% w/w
The statement is based on information from our suppliers, material declarations and, where available, test results. The threshold used is 0.1% weight by weight at the level of the article as supplied.
Substance details
| Substance | CAS or EC number | Location in article |
|---|---|---|
| Not applicable | Not applicable | Not applicable |
Safe use information (Article 33)
No special precautions are needed for normal use and handling of the article. Dispose of in line with local waste rules for electrical and electronic equipment.
Waste Framework Directive and SCIP
SCIP database notification status: Not required
Validity
This declaration is valid for the article revision named above. We will inform you if the Candidate List update or a change in our article affects this statement.
Approval
This template is a starting point, not legal advice. Check the current Candidate List on the ECHA website and confirm your obligations under REACH Article 33 and the Waste Framework Directive with qualified counsel or your compliance lead.
Draft compliance declarations from ERP data
Optional: discuss a human-approved workflow that prepares declarations from your part master.
Optional. The tool and every export work without this. No spam.
How to use the template
Enter your company, the customer, the article number and revision, and the Candidate List version you checked against. Choose whether any SVHC is above 0.1% weight by weight. If yes, name the substance, CAS or EC number and where it sits in the article, and add safe use information. Export to Word or PDF, then have an authorised person sign. Keep one declaration per article revision.
The rule behind it
Under REACH Article 33, a supplier of an article containing a Candidate List substance above 0.1% w/w must give recipients enough information to allow safe use, including at least the substance name. Consumers can ask and must be answered within 45 days. Since 2021, producers and importers of such articles in the EU must also notify the ECHA SCIP database under the Waste Framework Directive. The Court of Justice ruled in 2015 that the 0.1% applies to each article within a complex product.
Common mistakes
Many declarations cite an old Candidate List or a generic phrase of compliance without naming a version. Others apply 0.1% to the whole assembly instead of each article. The Candidate List is updated twice a year, so a declaration can be outdated within months.
- Not stating the Candidate List version
- Missing sub-supplier data on purchased components
- Confusing REACH SVHC with RoHS limits
- Skipping safe use information when an SVHC is present
Frequently Asked Questions
What is an SVHC?
A substance of very high concern is a chemical identified under REACH for properties such as carcinogenicity or persistence. Once placed on the Candidate List, suppliers of articles that contain it above 0.1% w/w have information duties.
How often should I update the declaration?
ECHA updates the Candidate List usually twice a year. Re-check your parts against each update and reissue declarations where the answer changes. Many customers request an annual refresh as a minimum.
Is a REACH declaration the same as a RoHS declaration?
No. RoHS restricts specific substances in electrical equipment, while REACH Article 33 is about information on Candidate List substances in articles. A product can need both, and they use different lists and thresholds.
Who must sign the declaration?
Use a person with authority to make binding statements for the company, often a compliance manager or quality director. Customers may specify their own format, so check whether your template meets their needs before sending.
If you answer many such requests each month, we can help automate the first draft from your ERP part data and stored supplier declarations, with human sign-off.
Related Tools
EU REACH Article 33 Supplier SVHC Request Template
A supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
Compliance & ContractsRoHS Restricted Substances and Exemptions Reference
Searchable lookup of RoHS 2 substance limits, widely used Annex III exemptions and equipment categories.
Compliance & ContractsPFAS Reporting Worksheet
List PFAS-containing parts with CAS numbers, concentration and volume, and compute the annual PFAS mass per part and in total.
Compliance & ContractsCE Marking Conformity Readiness Assessment
Answer nine questions on directives, standards, technical file and declaration to see how ready you are to affix the CE mark.
More Compliance & Contracts tools
See all- GDPR ERP Data Migration Checklist
- EORI and Customs Readiness Checklist for Manufacturers
- EU Intra-Community Supply Evidence File Template
- EU Declaration of Conformity (CE) Template
- EU CE Marking Directives and Regulations Reference
- SVHC Candidate List Article Screening Worksheet
- WEEE and Battery Producer Registration Tracker Worksheet
- REACH SVHC Article Concentration and Notification Calculator
- EU Product Legislation Directives and Regulations Reference
Keep exploring
Free tools
- EU REACH Article 33 Supplier SVHC Request TemplateA supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
- EU REACH SVHC Compliance Checklist for ManufacturersA 32-point checklist for managing Substances of Very High Concern in articles: screening, supplier requests, communication and notification.
- Supplier Material Declaration Request Letter TemplateA fill-in letter that asks a supplier for substance and material declarations, with a response deadline and a list of the data you need back.