Fault Tree Top Event Probability Calculator: OR and AND Gates with Redundancy
Fault tree analysis starts from an unwanted top event and works down to the basic events that cause it. This calculator handles a common small structure: two single points of failure plus a redundant pair, all feeding one top event. It shows how much the redundancy is worth, and how fast that benefit shrinks as the pair gets less reliable.
Your numbers
Single point failure feeding the OR gate.
First leg of the redundant pair.
Second leg of the redundant pair. B and C must both fail.
Another single point failure feeding the OR gate.
Your results
Assumes statistically independent basic events and probabilities over the same mission time or demand. Common-cause failures can make a redundant pair far less effective than shown. Not a substitute for a formal safety analysis.
Top event probability versus event B probability
Sweeps Event B probability from 0 to 30, holding your other inputs fixed.
Bring failure data into your reliability models
Optional: a short chat about reading failure and downtime data from maintenance and quality records.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the probability of each basic event over the same period, such as one mission or one demand, in percent. Events A and D are single points of failure: if either happens, the top event happens. Events B and C are a redundant pair: the top event occurs through that branch only if both fail. The calculator joins the three branches with an OR gate and shows the top event probability, the same figure if the pair were not redundant, and the reduction.
The math behind it
For independent events, an AND gate multiplies probabilities: P(B and C) = P(B) x P(C). An OR gate is one minus the product of the complements: P(A or X or D) = 1 - (1 - P(A))(1 - P(X))(1 - P(D)). For small probabilities this is close to the sum, which is the rare-event approximation used in many reports. Standards such as IEC 61025 describe the method. In larger trees, minimal cut sets are found first, and the top event probability is the union of those sets.
- AND gate: multiply the input probabilities
- OR gate: one minus the product of (1 - p)
- Rare-event approximation: add the cut set probabilities
- Check that all probabilities share the same time basis
Worked example and common mistakes
With A at 2%, B and C at 5% each and D at 1%, the redundant pair fails together only 0.25% of the time. The top event is about 3.2%, against about 12.5% if B and C were each single points of failure. The benefit looks large, but it depends on independence. If B and C share a power supply or a software defect, the true pair probability may be orders of magnitude higher. Mixing per-hour and per-demand figures is another common error.
Frequently Asked Questions
Why multiply probabilities for an AND gate?
If both events must occur and they are independent, the chance of both is the product of the chances. Five percent and five percent give 0.25 percent. This holds only when one failure does not make the other more likely.
What is common cause failure?
A single root cause that defeats redundant items at once, such as shared power, a shared environment, a design flaw or the same maintenance error. It makes AND gate math too optimistic and must be modelled separately.
Can I use failure rates instead of probabilities?
Convert them first. For a constant failure rate lambda and a mission time t, the probability of failure is about 1 minus exp(-lambda x t). Then enter that figure as a percent so all events share the same time basis.
Is this enough for a safety case?
No. Real fault trees can have many gates, repeated events and dependencies, and should be built with dedicated software and reviewed against IEC 61025 and your sector standard. This tool is for quick checks and teaching.
If you want failure rates and downtime events pulled from your maintenance and quality systems to feed trees like this, Netray can discuss a read-only approach with your data.
Related Tools
Risk Analysis Method Selection Reference
A searchable comparison of risk and reliability analysis methods, showing whether each works bottom-up or top-down, what it suits and which standard describes it.
Quality & InspectionProcess FMEA Failure Mode Library
A searchable starter list of typical failure modes, effects and causes for common manufacturing processes, to seed a PFMEA brainstorm instead of starting from a blank sheet.
Quality & InspectionFMEA Process Maturity Assessment
Ten questions that score how well your organisation runs FMEA, from team and scope to rating discipline, action closure and linkage to the control plan.
Quality & InspectionFMEA Prevention and Detection Controls Reference
A searchable list of common prevention and detection controls, with what each addresses and where it falls short, for use when completing FMEA and control plan columns.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Vibration Fault Signature Diagnosis ReferenceA searchable lookup of what each common machine fault looks like in a vibration spectrum, with dominant frequency, direction and the first check to make.
- Supplier Lot Acceptance Probability CalculatorCalculates the chance an incoming lot is accepted for a given supplier defect rate and sampling plan, and plots the operating characteristic curve.
- SAP QM OC Curve and Acceptance Probability CalculatorSee how a sampling plan behaves: acceptance probability and average outgoing quality across incoming defect rates.
ERP fixes and how-tos
- How the SyteLine Event System Works for Workflow NotificationsHow SyteLine's Event Manager triggers email alerts, Mongoose scripts and ION Workflow off IDO methods: setup steps, Before/After timing, and troubleshooting.
- How to Send SyteLine Business Event Alerts to Infor Ming.leHow to turn SyteLine business events into Infor Ming.le alerts and notifications: event handlers, ION, recipients, noise control and a decision guide.
- How to Set Up Business Events and Actions in IFSConfigure IFS Business Events and Actions step by step: define triggers on an entity, enable the event, and bind an email, workflow, or webhook action.
Guides
- How to Configure Event Handlers in SyteLineStep-by-step guide to configuring event handlers in Infor SyteLine for automated responses to data changes, user actions, and system events across your ERP environment.
- SyteLine Event System Customization GuideCustomize SyteLine with the event system. Build event handlers, manage triggers, and extend CloudSuite Industrial without modifying base code.
- SyteLine Event System: Automating ERP Workflows the Supported WayAutomate workflows with the SyteLine event system: event definitions, handlers, actions, approval routing, and how to troubleshoot stuck events explained.
AI on your ERP
- AI for Infor WMS: Warehouse Answers Joined to Your Infor ERPPrivate AI for Infor WMS and your Infor or other ERP: inventory, tasks and receiving questions answered in plain English, with ION-based or database access.
- AI for 1factory: First Article and Inspection Data Joined to Your ERPPrivate AI for 1factory: first article inspection (AS9102), ballooned drawings and inspection data joined to ERP work orders, lots and suppliers.