Gage R&R Acceptance Criteria Reference Table
This table collects the acceptance thresholds quality engineers keep looking up when they review a gage R&R study: %GRR bands, ndc, resolution, bias, linearity, kappa and the calibration ratios. Search it, then export the rows you need into a procedure or supplier review.
| Metric | Band or condition | Threshold | How it is usually read | Applies to |
|---|---|---|---|---|
%GRR (of total variation) | Below 10% | < 10% | Measurement system generally acceptable | Variable data, AIAG MSA guidance |
%GRR (of total variation) | 10% to 30% | 10 - 30% | May be acceptable depending on application, cost of gage, cost of rework or risk | Variable data, AIAG MSA guidance |
%GRR (of total variation) | Above 30% | > 30% | Generally unacceptable, improve the system | Variable data, AIAG MSA guidance |
%GRR (of tolerance) | Same bands as above | 10 / 30% | Use when the gage is used for pass/fail against a specification | Variable data, product acceptance |
%EV (repeatability) | Compared with %AV | No fixed limit | EV much larger than AV points to the gage or the method, not the operators | Variable data |
%AV (reproducibility) | Compared with %EV | No fixed limit | AV much larger than EV points to training, fixturing or procedure | Variable data |
ndc (number of distinct categories) | 5 or more | >= 5 | System can distinguish enough levels for process control | Variable data, AIAG MSA guidance |
ndc (number of distinct categories) | 2 to 4 | 2 - 4 | Only coarse screening, not suited to process control charts | Variable data |
ndc (number of distinct categories) | 1 | 1 | System cannot discriminate between parts | Variable data |
Resolution (10:1 rule) | Gage increment vs tolerance or process spread | Increment <= 1/10 | Smallest readable increment should be about one tenth of the tolerance or process variation | Gage selection |
Test accuracy ratio (TAR) | Tolerance of UUT over calibrator accuracy | 4:1 common target | Classic military-era rule, often still written into procedures | Calibration |
Test uncertainty ratio (TUR) | Tolerance of UUT over expanded uncertainty of the calibration | 4:1 common target | ANSI/NCSL Z540.3 uses 4:1 TUR as a fallback when probability of false accept cannot be estimated | Calibration |
Bias | Observed average minus reference value | Not significantly different from 0 | Judged with a confidence interval from the bias study, not a single reading | Variable data |
Linearity | Bias across the operating range | Slope not significant | A significant slope means bias changes with the size of the part | Variable data |
Stability | Control chart of a master over time | In statistical control | Out-of-control points signal drift, wear or environmental change | Variable data |
Cohen kappa (attribute) | 0.90 or higher | >= 0.90 | Good agreement, appraisers accepted | Attribute data, AIAG MSA guidance |
Cohen kappa (attribute) | 0.75 to 0.90 | 0.75 - 0.90 | Marginal, acceptable only with justification | Attribute data, AIAG MSA guidance |
Cohen kappa (attribute) | Below 0.75 | < 0.75 | Poor agreement, improve criteria and training | Attribute data, AIAG MSA guidance |
Effectiveness (attribute) | Correct decisions over opportunities | >= 90% acceptable, >= 80% marginal | Appraiser correct decision rate against the reference standard | Attribute data |
Miss rate and false alarm rate | Bad called good, good called bad | Miss <= 2%, false alarm <= 5% (acceptable) | Customer-facing escapes weigh more than false rejects | Attribute data |
These are commonly used guideline values from the AIAG MSA reference manual and ANSI/NCSL Z540.3 practice. Your customer, quality agreement or internal procedure may set stricter limits. Always confirm against the edition your customer requires.
Review our measurement system data model
Optional: a short review of how gage studies and calibration status could be tracked against your ERP item and equipment records.
Optional. The tool and every export work without this. No spam.
How to use the table
Type a metric name such as ndc or kappa into the search box to filter the rows. Each row gives the band, the numeric threshold, how the result is normally read and which type of data it applies to. Use the variable data rows after an average and range or ANOVA study, and the attribute rows after an agreement study. Export to Excel when you want to paste the thresholds into a measurement system procedure.
Percent of what? Total variation versus tolerance
The same 10 and 30 percent bands are applied to two different denominators. Against total variation, %GRR tells you whether the gage can support process control and capability studies. Against tolerance, it tells you whether the gage can sort good from bad parts. A process with tight variation but a wide tolerance can look poor on the first and fine on the second. Report both and state which one your customer asks for.
- Use total variation for SPC and capability work
- Use tolerance for final inspection and product acceptance
- Never mix the two when comparing studies
Why the 10 to 30 percent band needs a decision
Results between 10 and 30 percent are not an automatic pass. The guidance asks you to weigh the importance of the measurement, the cost of the gage, the cost of repairs and the risk to the customer. Record that reasoning and get customer agreement where the contract requires it. Results above 30 percent normally trigger a corrective action: better fixturing, higher resolution, clearer method or operator training.
Common mistakes
The most frequent errors are using parts that do not span the process range, which inflates the apparent gage error share, running too few parts, and treating a passing %GRR as proof the gage is calibrated. A gage R&R study measures variation, not accuracy against a standard. Pair it with calibration records and a bias study.
Frequently Asked Questions
What is an acceptable gage R&R percentage?
Under AIAG MSA guidance, under 10 percent is generally acceptable, 10 to 30 percent may be acceptable depending on the application and cost, and over 30 percent is generally unacceptable. Your customer may require a stricter limit, so check the quality agreement.
What does ndc of 5 mean?
Number of distinct categories is how many groups of parts the measurement system can reliably tell apart within the process spread. A value of 5 or more is the usual minimum for process control. It is computed from part variation divided by gage R&R, multiplied by 1.41.
Is the 4:1 ratio a requirement?
It is a long-standing rule of thumb, not a universal requirement. Many procedures still adopt 4:1 for test accuracy or test uncertainty ratio. Standards such as ANSI/NCSL Z540.3 define how decisions should be made when it cannot be met.
Do these limits apply to attribute gages?
Percent GRR bands apply to variable data. For attribute gages such as go/no-go or visual inspection, use kappa, effectiveness, miss rate and false alarm rate from an attribute agreement study instead.
If your gage R&R results live in a spreadsheet or a QMS, we can help pull them into your ERP quality module so acceptance status shows up on the gage record.
Related Tools
Gage R&R Average and Range Constants (K1, K2, K3) Reference
The K1, K2 and K3 constants for the 5.15-sigma (99 percent) average and range gage R&R method, by number of trials, operators and parts.
Developer ToolsGage R&R Python Script Generator (Average and Range)
Fill in the file name, tolerance, and get a plain Python script that computes the average and range gage R&R.
Quality & InspectionMeasurement System and Calibration Audit Checklist
A practical checklist for internal and supplier audits of gage control, calibration records, MSA studies and traceability.
Quality & InspectionMeasurement System Maturity Assessment
Ten questions that score how well your calibration, MSA and gage records are controlled, with next-step advice by band.
More Quality & Inspection tools
See all- A3 Problem Solving Report Template
- Rolled Throughput Yield Calculator
- A3 Problem Solving Template
- Rolled Throughput Yield Calculator
- Cpk Confidence Interval and Sample Size Calculator
- X-bar and S Control Chart Limits Calculator
- Individuals and Moving Range (I-MR) Chart Limits Calculator
- Expected PPM Out of Specification Calculator
- Taguchi Loss Function Calculator
Keep exploring
Free tools
- Gage Resolution and Distinct Categories (ndc) CalculatorCheck whether gage resolution is fine enough for a tolerance and calculate the number of distinct categories from part variation and gage R&R.
- Gage R&R Average and Range Method CalculatorTurn the averages from a variable gage R&R study into EV, AV, GRR, part variation, %GRR and number of distinct categories.
- Gage R&R NDC and Percent Tolerance CalculatorConvert part-to-part and gage R&R standard deviations into NDC, %GRR of study variation and %GRR of tolerance, and see how NDC falls as gage error grows.
Guides
- Factory Acceptance Test Checklist for Custom Machinery BuildersHow to plan and document a factory acceptance test for custom machinery: test protocol, samples, acceptance criteria, punch list and sign-off tied to payment.
- The AI Statement of Work ChecklistThe AI statement of work checklist: scope language that prevents creep, IP and model ownership clauses, measurable acceptance criteria, and payment milestones.