Developer ToolsFree referencePDF, Excel, Word exportIBM iAll IBM i (AS/400) ERPs tools

IBM i Services SQL Reference: QSYS2 and SYSTOOLS Views and Functions

IBM i Services are views, table functions and procedures in QSYS2 and SYSTOOLS that return system information as SQL result sets. This reference lists the ones admins and developers use most, the CL command each replaces, and a statement you can run from Run SQL Scripts, STRSQL or any ODBC or JDBC client.

Download:
ServiceTypeReplaces or mirrorsReturnsSample SQLRelease note
QSYS2.ACTIVE_JOB_INFO
Table function
WRKACTJOB
Active jobs with CPU, I/O, status, function
SELECT JOB_NAME, AUTHORIZATION_NAME, JOB_STATUS, FUNCTION FROM TABLE(QSYS2.ACTIVE_JOB_INFO(DETAILED_INFO => 'NONE')) X WHERE JOB_STATUS = 'MSGW'
Parameters SUBSYSTEM_LIST_FILTER, JOB_NAME_FILTER, CURRENT_USER_LIST_FILTER, DETAILED_INFO
QSYS2.JOB_INFO
Table function
WRKUSRJOB, WRKSBMJOB
Jobs in any state: ACTIVE, JOBQ, OUTQ
SELECT * FROM TABLE(QSYS2.JOB_INFO(JOB_STATUS_FILTER => '*JOBQ', JOB_USER_FILTER => '*ALL')) X
Filters: JOB_STATUS_FILTER, JOB_TYPE_FILTER, JOB_SUBSYSTEM_FILTER, JOB_USER_FILTER
QSYS2.SYSTEM_STATUS_INFO
View
WRKSYSSTS
One row: jobs in system, ASP used, CPU, memory, job table
SELECT TOTAL_JOBS_IN_SYSTEM, ACTIVE_JOBS_IN_SYSTEM, SYSTEM_ASP_USED, CONFIGURED_CPUS FROM QSYS2.SYSTEM_STATUS_INFO
Use SYSTEM_STATUS_INFO_BASIC for a cheaper subset when polling often
QSYS2.SYSTEM_STATUS_INFO_BASIC
View
WRKSYSSTS
Faster subset of SYSTEM_STATUS_INFO
SELECT * FROM QSYS2.SYSTEM_STATUS_INFO_BASIC
Prefer for monitoring scripts
QSYS2.SYSTEM_ACTIVITY_INFO
Table function
WRKSYSACT (summary)
CPU utilisation figures
SELECT * FROM TABLE(QSYS2.SYSTEM_ACTIVITY_INFO())
Call with no parameters for current CPU and activity figures
QSYS2.SYSTEM_VALUE_INFO
View
WRKSYSVAL, DSPSYSVAL
Current value and shipped default per system value
SELECT SYSTEM_VALUE_NAME, SYSTEM_VALUE, SHIPPED_DEFAULT_VALUE FROM QSYS2.SYSTEM_VALUE_INFO WHERE SYSTEM_VALUE_NAME LIKE 'QPWD%'
Good for audit diffs between partitions
QSYS2.USER_INFO
View
DSPUSRPRF, WRKUSRPRF
User profiles: status, last sign-on, special authorities, password dates
SELECT AUTHORIZATION_NAME, STATUS, PREVIOUS_SIGNON, SPECIAL_AUTHORITIES FROM QSYS2.USER_INFO WHERE PREVIOUS_SIGNON < CURRENT TIMESTAMP - 90 DAYS
Needs *OBJOPR and *READ on the profiles; USER_INFO_BASIC is faster
QSYS2.USER_INFO_BASIC
View
DSPUSRPRF
Faster subset of USER_INFO
SELECT AUTHORIZATION_NAME, STATUS FROM QSYS2.USER_INFO_BASIC WHERE STATUS = '*DISABLED'
Use for large profile counts
QSYS2.OBJECT_STATISTICS
Table function
DSPOBJD, WRKOBJ
Objects in a library with size, created, last used, days used
SELECT OBJNAME, OBJTYPE, OBJSIZE, LAST_USED_TIMESTAMP FROM TABLE(QSYS2.OBJECT_STATISTICS('MYLIB', 'PGM SRVPGM')) X ORDER BY OBJSIZE DESC
Third parameter '*ALLSIMPLE' returns names fast without detail
QSYS2.LIBRARY_INFO
Table function
DSPLIB, RTVLIBD
Library size and object count
SELECT OBJECT_COUNT, LIBRARY_SIZE FROM TABLE(QSYS2.LIBRARY_INFO('MYLIB')) X
DETAILED_INFO => 'NO' skips the size calculation
QSYS2.SYSTABLESTAT
Catalog view
DSPFD (member sizes)
Rows, deleted rows and size per table
SELECT TABLE_NAME, NUMBER_ROWS, NUMBER_DELETED_ROWS, DATA_SIZE FROM QSYS2.SYSTABLESTAT WHERE TABLE_SCHEMA = 'MYLIB' ORDER BY NUMBER_DELETED_ROWS DESC
Db2 for i catalog; finds files that need RGZPFM
QSYS2.SYSPARTITIONSTAT
Catalog view
DSPFD per member
Statistics per table partition or member
SELECT TABLE_NAME, TABLE_PARTITION, NUMBER_ROWS FROM QSYS2.SYSPARTITIONSTAT WHERE TABLE_SCHEMA = 'MYLIB'
Use for multi-member physical files
QSYS2.SYSTABLES / QSYS2.SYSCOLUMNS
Catalog view
DSPFFD
Tables and their columns, types, lengths
SELECT COLUMN_NAME, DATA_TYPE, LENGTH, NUMERIC_SCALE FROM QSYS2.SYSCOLUMNS WHERE TABLE_SCHEMA = 'MYLIB' AND TABLE_NAME = 'CUSTMAST'
Db2 for i catalog
QSYS2.HISTORY_LOG_INFO
Table function
DSPLOG
QHST messages with timestamp, ID, severity, from job
SELECT MESSAGE_TIMESTAMP, MESSAGE_ID, FROM_JOB, MESSAGE_TEXT FROM TABLE(QSYS2.HISTORY_LOG_INFO(START_TIME => CURRENT TIMESTAMP - 1 DAY)) X WHERE SEVERITY >= 40
Parameters START_TIME, END_TIME
QSYS2.MESSAGE_QUEUE_INFO
View
DSPMSG
Messages on queues such as QSYSOPR
SELECT MESSAGE_TIMESTAMP, MESSAGE_ID, MESSAGE_TEXT FROM QSYS2.MESSAGE_QUEUE_INFO WHERE MESSAGE_QUEUE_NAME = 'QSYSOPR' AND MESSAGE_TYPE = 'INQUIRY'
Also available as a table function
QSYS2.JOBLOG_INFO
Table function
DSPJOBLOG
Job log messages of a job
SELECT MESSAGE_ID, MESSAGE_TEXT FROM TABLE(QSYS2.JOBLOG_INFO('*')) X
'*' is the current job
QSYS2.OUTPUT_QUEUE_ENTRIES
View
WRKOUTQ
One row per spooled file in every output queue
SELECT OUTPUT_QUEUE_NAME, SPOOLED_FILE_NAME, USER_NAME, SIZE, CREATE_TIMESTAMP FROM QSYS2.OUTPUT_QUEUE_ENTRIES WHERE OUTPUT_QUEUE_NAME = 'PRT01'
OUTPUT_QUEUE_ENTRIES_BASIC is much faster
QSYS2.SPOOLED_FILE_INFO
Table function
WRKSPLF
Spooled files filtered by user, time, status, queue
SELECT SPOOLED_FILE_NAME, STATUS, SIZE, CREATION_TIMESTAMP FROM TABLE(QSYS2.SPOOLED_FILE_INFO(USER_NAME => 'BATCHUSR')) X
Other filters: STARTING_TIMESTAMP, STATUS, JOB_NAME, OUTPUT_QUEUE, USER_DATA
QSYS2.NETSTAT_INFO
View
NETSTAT *CNN
TCP and UDP connections, ports, state
SELECT REMOTE_ADDRESS, REMOTE_PORT, LOCAL_PORT, TCP_STATE FROM QSYS2.NETSTAT_INFO WHERE LOCAL_PORT = 8471
8471 is the database host server port
QSYS2.NETSTAT_JOB_INFO
View
NETSTAT option 3 then F14
Connections with the job and user that own them
SELECT JOB_NAME, AUTHORIZATION_NAME, REMOTE_ADDRESS, LOCAL_PORT FROM QSYS2.NETSTAT_JOB_INFO WHERE LOCAL_PORT = 8471
Find which PC holds an ODBC job
QSYS2.PTF_INFO
View
DSPPTF
PTFs with loaded status and IPL action
SELECT PTF_PRODUCT_ID, PTF_IDENTIFIER, PTF_LOADED_STATUS, PTF_IPL_ACTION FROM QSYS2.PTF_INFO WHERE PTF_IPL_ACTION <> 'NONE'
PTF_IPL_ACTION shows what changes at the next IPL
QSYS2.GROUP_PTF_INFO
View
WRKPTFGRP
PTF groups installed and their status
SELECT * FROM QSYS2.GROUP_PTF_INFO ORDER BY PTF_GROUP_NAME
Local information only
SYSTOOLS.GROUP_PTF_CURRENCY
View
Manual check of the IBM PSP site
Installed vs available level for each PTF group
SELECT PTF_GROUP_ID, PTF_GROUP_TITLE, PTF_GROUP_LEVEL_INSTALLED, PTF_GROUP_LEVEL_AVAILABLE FROM SYSTOOLS.GROUP_PTF_CURRENCY ORDER BY PTF_GROUP_LEVEL_AVAILABLE - PTF_GROUP_LEVEL_INSTALLED DESC
Needs internet access from the partition to IBM
QSYS2.JOURNAL_INFO
View
WRKJRNA
Journals with attached receiver, receiver count and total size
SELECT JOURNAL_LIBRARY, JOURNAL_NAME, ATTACHED_JOURNAL_RECEIVER_NAME, NUMBER_JOURNAL_RECEIVERS, TOTAL_SIZE_JOURNAL_RECEIVERS FROM QSYS2.JOURNAL_INFO ORDER BY TOTAL_SIZE_JOURNAL_RECEIVERS DESC
Sizes in KB
QSYS2.JOURNAL_RECEIVER_INFO
View
WRKJRNRCV, DSPJRNRCVA
Receiver size, entry count, status, attach and detach times
SELECT JOURNAL_RECEIVER_NAME, SIZE, NUMBER_OF_JOURNAL_ENTRIES, STATUS, DETACH_TIMESTAMP FROM QSYS2.JOURNAL_RECEIVER_INFO WHERE JOURNAL_RECEIVER_LIBRARY = 'MYJRNLIB'
SIZE in KB
QSYS2.DISPLAY_JOURNAL
Table function
DSPJRN
Journal entries with code, type, object, timestamp, entry data
SELECT ENTRY_TIMESTAMP, JOURNAL_CODE, JOURNAL_ENTRY_TYPE, OBJECT FROM TABLE(QSYS2.DISPLAY_JOURNAL('MYJRNLIB', 'MYJRN', STARTING_TIMESTAMP => CURRENT TIMESTAMP - 1 HOUR)) X
First two parameters: journal library, journal name
QSYS2.SCHEDULED_JOB_INFO
View
WRKJOBSCDE
Job schedule entries with next run, command, last result
SELECT SCHEDULED_JOB_NAME, STATUS, NEXT_SUBMISSION_DATE, COMMAND_STRING FROM QSYS2.SCHEDULED_JOB_INFO ORDER BY NEXT_SUBMISSION_DATE
Full visibility needs *JOBCTL
QSYS2.JOB_QUEUE_INFO
View
WRKJOBQ
Job queues, status, jobs waiting, subsystem
SELECT JOB_QUEUE_NAME, JOB_QUEUE_STATUS, NUMBER_OF_JOBS, SUBSYSTEM_NAME FROM QSYS2.JOB_QUEUE_INFO WHERE NUMBER_OF_JOBS > 0
Spot held queues before the night batch
QSYS2.SUBSYSTEM_INFO
View
WRKSBS
Subsystems, status, current active jobs
SELECT SUBSYSTEM_DESCRIPTION, STATUS, CURRENT_ACTIVE_JOBS FROM QSYS2.SUBSYSTEM_INFO WHERE STATUS = 'ACTIVE'
QSYS2.RECORD_LOCK_INFO
View
WRKOBJLCK, DSPRCDLCK
Record locks held and requested
SELECT * FROM QSYS2.RECORD_LOCK_INFO WHERE TABLE_SCHEMA = 'MYLIB' AND TABLE_NAME = 'CUSTMAST'
Use with RPG status 01218
QSYS2.ASP_INFO
View
WRKDSKSTS (capacity), WRKASPCFG
Capacity and free space per ASP in MB
SELECT ASP_NUMBER, ASP_STATE, TOTAL_CAPACITY, TOTAL_CAPACITY_AVAILABLE FROM QSYS2.ASP_INFO
QSYS2.LICENSE_INFO
View
WRKLICINF
Licensed products, usage limit, count, expiration
SELECT PRODUCT_ID, FEATURE_ID, USAGE_LIMIT, USAGE_COUNT, LICENSE_EXPIRATION FROM QSYS2.LICENSE_INFO WHERE LICENSE_EXPIRATION <= CURRENT DATE + 14 DAYS
Spot expiring keys before they stop a product
QSYS2.OBJECT_PRIVILEGES
View
DSPOBJAUT
Private and public authorities per object
SELECT SYSTEM_OBJECT_NAME, AUTHORIZATION_NAME, OBJECT_AUTHORITY FROM QSYS2.OBJECT_PRIVILEGES WHERE SYSTEM_OBJECT_SCHEMA = 'MYLIB' AND AUTHORIZATION_NAME = '*PUBLIC'
Also a table function form
QSYS2.SERVER_SBS_ROUTING
View
Manual QSYS2.SET_SERVER_SBS_ROUTING review
Users routed to alternate subsystems for host servers like QZDASOINIT
SELECT AUTHORIZATION_NAME, QZDASOINIT_SUBSYSTEM, QZDASOINIT_ROLLOVER FROM QSYS2.SERVER_SBS_ROUTING
Set with QSYS2.SET_SERVER_SBS_ROUTING
QSYS2.IFS_OBJECT_STATISTICS
Table function
WRKLNK, DSPLNK
IFS objects with size, owner, change and use times
SELECT PATH_NAME, OBJECT_TYPE, DATA_SIZE, DATA_CHANGE_TIMESTAMP FROM TABLE(QSYS2.IFS_OBJECT_STATISTICS(START_PATH_NAME => '/home', SUBTREE_DIRECTORIES => 'YES')) X ORDER BY DATA_SIZE DESC
Large trees take time: start narrow
QSYS2.IFS_READ
Table function
DSPF, EDTF (read)
Lines of a stream file (LINE_NUMBER, LINE)
SELECT LINE_NUMBER, LINE FROM TABLE(QSYS2.IFS_READ(PATH_NAME => '/home/dev/readme.txt', END_OF_LINE => 'CRLF')) X
IFS_READ_BINARY and IFS_READ_UTF8 variants exist
QSYS2.QCMDEXC
Procedure
Running CL from SQL
Runs a CL command
CALL QSYS2.QCMDEXC('ADDLIBLE LIB(PRODLIB2)')
Also a scalar function returning 1 or -1; command authority rules apply
QSYS2.HTTP_GET
Scalar function
Java or curl calls from CL
Response body as CLOB
VALUES QSYS2.HTTP_GET('https://example.com/api/status', '{"headers":{"Accept":"application/json"}}')
QSYS2 HTTP functions arrived with 7.3 TR11 and 7.4 TR5. The headers JSON object needs a recent Db2 PTF Group (7.4 level 23, 7.5 level 3); older levels use the single header option. The SYSTOOLS HTTPGETCLOB functions use Java
SYSIBM.SYSDUMMY1
Catalog view
The DUAL table in Oracle
One row, one column, for evaluating expressions
SELECT CURRENT TIMESTAMP, CURRENT SERVER FROM SYSIBM.SYSDUMMY1
Or use VALUES CURRENT TIMESTAMP with no table

Service names, columns and parameters follow IBM Documentation for IBM i 7.5 (IBM i Services and the Db2 for i catalog). Many services arrive on earlier releases through the Db2 PTF Group; check the IBM i Technology Updates pages for the level your partition needs. Sample library and object names are placeholders.

Get a daily IBM i health check script

Tell us your release and what you monitor today and we will send a set of IBM i Services queries for a daily check, matched to your PTF level.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by the CL command you already know, for example WRKACTJOB or DSPLOG, and the table shows the service that returns the same information as rows. Copy the sample SQL, change the library or user names, and run it. Views are queried directly (SELECT ... FROM QSYS2.USER_INFO); table functions need TABLE(...) around the call and accept named parameters with =>; procedures are run with CALL. Because the results are ordinary SQL, you can join them, filter them, export them from ACS to Excel, or read them from SQL Server through a linked server over the IBM i Access ODBC driver.

  • Run SQL Scripts in IBM i Access Client Solutions is the easiest place to start
  • STRSQL works too but does not show long columns well
  • From SSMS, use OPENQUERY over an ODBC linked server so the SQL runs on IBM i

Worked example: find jobs waiting on a message

A night batch has stopped and users report locks. Run SELECT JOB_NAME, AUTHORIZATION_NAME, JOB_STATUS, FUNCTION FROM TABLE(QSYS2.ACTIVE_JOB_INFO(DETAILED_INFO => 'NONE')) X WHERE JOB_STATUS = 'MSGW'. Each row is a job waiting on an inquiry message. Then SELECT MESSAGE_TIMESTAMP, MESSAGE_ID, MESSAGE_TEXT FROM QSYS2.MESSAGE_QUEUE_INFO WHERE MESSAGE_QUEUE_NAME = 'QSYSOPR' AND MESSAGE_TYPE = 'INQUIRY' shows what they are asking. If a job holds record locks, QSYS2.RECORD_LOCK_INFO filtered on the table shows the holder. Keeping DETAILED_INFO at 'NONE' makes ACTIVE_JOB_INFO fast enough to run every few minutes from a monitoring job.

PTF currency and housekeeping checks

SYSTOOLS.GROUP_PTF_CURRENCY compares the PTF group levels installed on the partition with the levels IBM publishes, so ordering by the difference shows which groups are furthest behind. It needs the partition to reach IBM over the internet; on an isolated partition use QSYS2.GROUP_PTF_INFO and compare manually. QSYS2.PTF_INFO with PTF_IPL_ACTION <> 'NONE' shows what will change at the next IPL. For storage, QSYS2.SYSTABLESTAT ordered by NUMBER_DELETED_ROWS finds files that need RGZPFM, and QSYS2.JOURNAL_INFO ordered by TOTAL_SIZE_JOURNAL_RECEIVERS finds journals whose receivers are not being cleaned up.

Gotchas: releases, PTFs and authority

IBM adds and extends services through Technology Refreshes and the Db2 PTF Group, so a service or column in the 7.5 documentation may be missing on a 7.4 partition that is behind on PTFs. Check the IBM i Technology Updates pages before relying on a parameter. Services respect object authority: a user without *JOBCTL sees fewer jobs, USER_INFO needs authority to the profiles, and some columns return null without *ALLOBJ, *SECADM or *JOBCTL. Some services do a lot of work per call (OBJECT_STATISTICS on *ALLUSR, IFS_OBJECT_STATISTICS on /), so filter early and test outside business hours.

Frequently Asked Questions

How do I run an SQL query on AS400?

Use Run SQL Scripts in IBM i Access Client Solutions, STRSQL on a green screen, or any ODBC or JDBC client with the IBM i Access driver. Type a statement such as SELECT * FROM QSYS2.SYSTEM_STATUS_INFO and run it. With system naming use library/file; with SQL naming use library.file, which ACS uses by default.

What is the dummy table in IBM i SQL?

SYSIBM.SYSDUMMY1 is the one-row table used to evaluate expressions, the equivalent of DUAL in Oracle, for example SELECT CURRENT DATE FROM SYSIBM.SYSDUMMY1. Db2 for i also supports VALUES, so VALUES CURRENT DATE returns the same result with no table at all.

Can I query AS400 system information from SQL Server SSMS?

Yes. Create a linked server in SQL Server over the IBM i Access ODBC driver, then use OPENQUERY so the statement runs on IBM i, for example SELECT * FROM OPENQUERY(IBMI, 'SELECT JOB_NAME, JOB_STATUS FROM TABLE(QSYS2.ACTIVE_JOB_INFO()) X'). The connecting user's IBM i authority still decides which rows come back.

Which IBM i Services replace WRKACTJOB and DSPLOG?

QSYS2.ACTIVE_JOB_INFO returns what WRKACTJOB shows, with filters for subsystem, job name and user, and a DETAILED_INFO level that controls how many columns are computed. QSYS2.HISTORY_LOG_INFO returns the QHST history log that DSPLOG shows, with START_TIME and END_TIME parameters to limit the window.

If you want admins and managers to ask questions like these in plain English and get answers from your IBM i, with the SQL shown and nothing leaving your network, we can set that up on your servers.

Get IBM i (AS/400) ERPs alerts

Support and maintenance deadlines, release changes that affect IBM i (AS/400) ERPs sites, and new free IBM i (AS/400) ERPs tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for IBM i (AS/400) ERPs: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to IBM i (AS/400) ERPs? Start with the IBM i (AS/400) ERPs guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software