Query/400 (WRKQRY) Record Selection Tests and Result Field Functions
A searchable reference for Query for IBM i (Query/400, WRKQRY and RUNQRY): every record selection test with its exact syntax, the functions you can use in result fields, and recipes that solve the usual ERP date and selection problems. Everything here matches IBM's Query for IBM i Use guide.
| Test or function | Where | Syntax as typed | Meaning | Example | Gotcha |
|---|---|---|---|---|---|
EQ | Select records | FIELD EQ value | Equal | STATE EQ 'TX' | Character constants need apostrophes; field and value are compared character by character, shorter one padded with blanks. |
NE | Select records | FIELD NE value | Not equal | NAME NE 'SMITH' | SMITHSON and Smith are both selected: NE is an exact match test. |
GT | Select records | FIELD GT value | Greater than | BALDUE GT 1000 | For character fields the collating sequence decides order (hex by default: lowercase sorts before uppercase, letters before digits). |
GE | Select records | FIELD GE value | Greater than or equal | INTRAT GE 18 | The value can be another field name, e.g. BALDUE GE CRLIMIT. |
LT | Select records | FIELD LT value | Less than | BALDUE LT CRLIMIT | Field to field comparisons need compatible types. |
LE | Select records | FIELD LE value | Less than or equal | QTYOH LE 0 | Numeric constants: no thousands separators. |
RANGE | Select records | FIELD RANGE low high | Between two values, inclusive at both ends | ORDDT RANGE 20260101 20261231 | Two values separated by a blank. If low is greater than high nothing is selected. |
LIST | Select records | FIELD LIST v1 v2 v3 | Equal to any value in the list | STATE LIST 'TX' 'OK' 'LA' | Values separated by blanks, no field names. Each character value in its own apostrophes. |
NLIST | Select records | FIELD NLIST v1 v2 | Not equal to any value in the list | CODE NLIST 'X' 'Y' | Same rules as LIST. If the list wraps onto the next Value line, keep a blank before the next value. |
LIKE | Select records | FIELD LIKE 'pattern' | Matches a pattern; % = zero or more characters, _ = exactly one | CUSNAM LIKE '%SMITH%' | Characters match exactly, so case matters. '%A' fails on a padded field because the last position is a blank: use '%A%'. |
NLIKE | Select records | FIELD NLIKE 'pattern' | Does not match the pattern | PARTNO NLIKE 'OBS%' | Character fields only. For a date field, build a result field with CHAR() and test that. |
IS | Select records | FIELD IS NULL | Field is null | SHIPDT IS NULL | The only valid value is NULL. Only meaningful on null-capable fields (common with SQL-created tables and outer joins). |
ISNOT | Select records | FIELD ISNOT NULL | Field is not null | NAME ISNOT NULL | Typed as one word, ISNOT. |
AND / OR | Select records | AND/OR column | Blank means AND. OR starts a new group; a record is selected if any group is fully true | STATE EQ 'TX' AND BALDUE GT 0, OR STATE EQ 'OK' | ANDs bind tighter than ORs: repeat a shared condition in every OR group if it must apply to all. |
+ - * / | Define result fields | FIELD1 * FIELD2 | Arithmetic on numeric fields and constants | AMOUNT = QTY * PRICE | Set Len and Dec on the result field or you may get truncation or rounding you did not want. |
|| (concatenation) | Define result fields | A || B | Joins character values | FULLNM = FIRSTN || ' ' || LASTN | Fixed-length fields keep trailing blanks inside the result. |
SUBSTR | Define result fields | SUBSTR(value, offset, length) | Part of a character value; length optional | SUBSTR(ALPHA,4,3) gives DEF from ABCDEFGHI | Character values only: wrap a number in DIGITS first. Exceeding the field end gives an error. |
DIGITS | Define result fields | DIGITS(numeric) | Character string of the digits, with leading zeros, no sign or decimal point | DIGITS(JOBCODE) | Length equals the number of digits in the field, so a 7,0 field gives 7 characters. |
VALUE | Define result fields | VALUE(x, y) | First argument that is not null (same idea as SQL COALESCE) | VALUE(COMMISSION, 0) | Arguments must be compatible types: no mixing character and numeric. |
VARCHAR | Define result fields | VARCHAR(expression) | Variable-length character result | VARCHAR(CUSNAM) | Useful before concatenation to avoid fixed padding. |
CHAR | Define result fields | CHAR(date-or-time, format) | Character form of a date, time or timestamp | CHAR(ORDDATE, ISO) | Needed before LIKE or SUBSTR on a date field. |
DATE | Define result fields | DATE(expression) | Converts a timestamp, a day number, a valid date string, or a yyyynnn string to a date | DATE('2026-10-22') | Two-digit year formats only cover 1940 to 2039; out-of-range values print as +. |
DAYS | Define result fields | DAYS(date) | Day number since 0001-01-01; subtract two DAYS() for a day count | DAYS(CURRDATE) - DAYS(HIREDATE) | Subtracting two dates directly gives a yyyymmdd duration, not a day count. |
YEAR / MONTH / DAY | Define result fields | YEAR(date) | Year, month or day part of a date, timestamp or duration | YEAR(ORDDATE) | Result is binary numeric; good as a break field. |
TIME / TIMESTAMP and HOUR, MINUTE, SECOND, MICROSECOND | Define result fields | HOUR(time) | Time and timestamp conversions and parts | HOUR(ENTTIME) | Time comparisons always include seconds. |
CURRENT | Define result fields | CURRENT(DATE) / CURRENT(TIME) / CURRENT(TIMESTAMP) / CURRENT(TIMEZONE) | System clock value; one reading per query run | TODAY = CURRENT(DATE) | Define it as a result field, then compare other date fields to it in Select records. |
Labeled duration | Define result fields | date + n DAYS / MONTHS / YEARS | Date arithmetic | CURRENT(DATE) - 30 DAYS | HIREDATE + 2 MONTHS + 14 DAYS is valid; HIREDATE + (2 MONTHS + 14 DAYS) is not. |
Report breaks | Run and output | Define report breaks: level 1-6 | Group lines and print summaries at each change | Level 1 = CUSNO, level 2 = ORDNO | Up to 6 break levels; sort on the break fields in the same order or the groups split. |
Summary functions | Run and output | 1=Total 2=Average 3=Minimum 4=Maximum 5=Count | Totals per break level and for the report | Total on ORDAMT | Count counts non-null values. |
Output type | Run and output | 1=Display 2=Printer 3=Database file | Where the result goes | 3 to write MYLIB/ORDEXT | Data in file: 1=New file, 2=Replace file, 3=New member, 4=Replace member, 5=Add to member. Replace file deletes all members first. |
Form of output | Run and output | 1=Detail 2=Summary only | Detail lines or only the break totals | 2 for a customer totals file | Summary-only output to a database file holds one row per break. |
RUNQRY | Run and output | RUNQRY QRY(lib/qry) RCDSLT(*YES) | Run a saved query; RCDSLT(*YES) shows Select Records before running | RUNQRY QRY(MYLIB/OPENORD) RCDSLT(*YES) | Changes made at run time are not saved to the definition. |
RUNQRY to a file | Run and output | RUNQRY QRY(lib/qry) OUTTYPE(*OUTFILE) OUTFILE(lib/file) | Override output to a database file | RUNQRY QRY(MYLIB/OPENORD) OUTTYPE(*OUTFILE) OUTFILE(QTEMP/OPENORD) | Good for scheduling with ADDJOBSCDE. |
RUNQRY default query | Run and output | RUNQRY QRYFILE(lib/file) | Quick look at a file with no saved query | RUNQRY QRYFILE(MYLIB/CUSTMAST) | Displays every record and field of the file; add RCDSLT(*YES) to filter first on large files. |
CYYMMDD to date | Recipe | YMD8 = ORDDT + 19000000; C8 = DIGITS(YMD8); ISO = SUBSTR(C8,1,4) || '-' || SUBSTR(C8,5,2) || '-' || SUBSTR(C8,7,2); ODATE = DATE(ISO) | Turns a 7,0 CYYMMDD number (1261022) into a real date | 1261022 + 19000000 = 20261022, then 2026-10-22 | Give YMD8 Len 8 Dec 0. Zero or invalid dates in the field fail the DATE step: select ORDDT GT 0 first. |
Last 30 days | Recipe | FROMDT = CURRENT(DATE) - 30 DAYS; select ODATE GE FROMDT | Rolling date window with no prompts | Uses the ODATE result field from the recipe above | Result fields can be used in Select Records once defined. |
Numeric to text for LIKE | Recipe | ITEMC = DIGITS(ITEMNO); select ITEMC LIKE '45%' | Pattern test on a numeric field | Finds items starting 45 | DIGITS keeps leading zeros, so 00045 does not start with 45. |
Null-safe total | Recipe | AMT0 = VALUE(AMT, 0) | Avoids null results in arithmetic after an outer join | TOTAL = AMT0 * QTY | Any null argument makes the whole expression null. |
Convert to SQL | Recipe | RTVQMQRY QMQRY(lib/qry) SRCFILE(lib/QQMQRYSRC) ALWQRYDFN(*YES) | Retrieves the SQL behind a Query/400 definition into a source member | RTVQMQRY QMQRY(MYLIB/OPENORD) SRCFILE(MYLIB/QQMQRYSRC) ALWQRYDFN(*YES) | Review the SQL: some report formatting and break options have no SQL equivalent. |
Run a definition through Query Manager | Recipe | STRQMQRY QMQRY(lib/qry) ALWQRYDFN(*YES) | Runs the query definition with Query Manager | STRQMQRY QMQRY(MYLIB/OPENORD) OUTPUT(*PRINT) ALWQRYDFN(*YES) | Report layout differs from RUNQRY output. |
Syntax and rules follow IBM's Query for IBM i Use guide (SC41-5210), chapters Selecting records and Defining result fields. Field names in examples are illustrative; use your own file's fields from the bottom of each display.
Get a WRKQRY report converted to SQL
Send one Query/400 definition printout and we will return the equivalent SQL view with the date conversions done properly.
Optional. The tool and every export work without this. No spam.
How to use it
Search the table for the test or function you need, for example LIKE, LIST or SUBSTR, and copy the syntax exactly as shown into the Field, Test and Value columns. Filter on Recipe to see worked combinations such as turning an ERP CYYMMDD numeric date into a real date and selecting the last 30 days. Each row has the one gotcha that most often breaks it, for example LIKE patterns failing on trailing blanks or LIST values without apostrophes. Export to Excel if you want to keep a desk copy next to the green screen.
Where this lives in Query/400
Start with WRKQRY, type 2 next to a query to change it or 1 to create one, and you reach the Define the Query display with its list of options: Specify file selections, Define result fields, Select and sequence fields, Select records, Select sort fields, Define report breaks, Select output type and output form, and more. Type 1 next to the options you need, or press F21 to select all of them. Result fields are defined before Select records, so a result field built with SUBSTR or DATE can be used as a selection field. RUNQRY runs a saved query from the command line or a CL program, and RCDSLT(*YES) lets the operator change the selection at run time.
- WRKQRY options: 1=Create 2=Change 3=Copy 4=Delete 5=Display 6=Print definition 8=Run in batch 9=Run
- F13 shows the report layout while you work
Worked example: open orders for three states in 2026
Assume an order header file with STATE, ORDDT (7,0 CYYMMDD) and OPNAMT. In Define result fields add YMD8 = ORDDT + 19000000 with Len 8 Dec 0, C8 = DIGITS(YMD8), ISO = SUBSTR(C8,1,4) || '-' || SUBSTR(C8,5,2) || '-' || SUBSTR(C8,7,2) and ODATE = DATE(ISO). In Select records type STATE LIST 'TX' 'OK' 'LA', then AND YMD8 RANGE 20260101 20261231, then AND OPNAMT GT 0. Add report break level 1 on STATE with Total on OPNAMT and choose output type 3 to write the result to a work file another job can pick up.
Moving to SQL equivalents
Most Query/400 logic maps directly to SQL: EQ to =, LIST to IN, NLIST to NOT IN, RANGE to BETWEEN, LIKE and NLIKE to LIKE and NOT LIKE, IS and ISNOT to IS NULL and IS NOT NULL, VALUE to COALESCE, and labeled durations work unchanged in Db2 for i. RTVQMQRY with ALWQRYDFN(*YES) writes the SQL that IBM generates from the definition into a source member, which is the fastest starting point. Expect to rework report breaks and summary-only output into GROUP BY. Running the SQL through Run SQL Scripts or a view also lets other tools read the same result.
Frequently Asked Questions
How do I use LIKE in an AS400 query?
Type the field name, LIKE in the Test column, and a pattern in apostrophes in the Value column, for example CUSNAM LIKE '%SMITH%'. Percent matches zero or more characters and underscore matches exactly one. Matching is exact, so case matters, and trailing blanks count: '%A' fails on 'ANNA ' in an 8-character field, while '%A%' works.
What is the syntax for LIST in Query/400?
Use FIELD LIST followed by the values separated by blanks, with each character value in its own apostrophes, for example STATE LIST 'TX' 'OK' 'LA'. Numeric values have no apostrophes. Field names are not allowed in a list. Use NLIST for not in the list. If the values do not fit, continue on the next Value line with a leading blank.
Is RANGE inclusive in Query/400?
Yes. RANGE selects values greater than or equal to the first value and less than or equal to the second, typed with a blank between them, for example ORDDT RANGE 1260101 1261231. If the first value is higher than the second, nothing is selected, which is a common mistake when typing dates in descending order.
How do I use SUBSTR on a numeric field in AS400 query?
SUBSTR only works on character values. First make a result field with DIGITS(field), which returns the digits with leading zeros, then apply SUBSTR to that result field, for example SUBSTR(DIGITS(ORDDT),2,2) for the year part of a CYYMMDD date. Remember DIGITS keeps the full field length.
If your users spend their day building WRKQRY reports to answer ERP questions, we can put a private assistant on your IBM i data that answers in plain English and shows the SQL it ran.
Related Tools
IBM i Services (QSYS2 and SYSTOOLS) SQL Reference
Searchable list of IBM i Services you can query with SQL from Run SQL Scripts, STRSQL or ODBC, with the CL command each replaces and a ready-to-run statement.
Developer ToolsIBM i (DB2 for i) SQL Data Extraction Script Generator
Generate DB2 for i SQL to inspect a file, count rows, and extract records with Julian date filters for JD Edwards World or other IBM i data.
OracleIBM i CL Command Cheat Sheet
A searchable lookup of the CL commands operators and JDE World support staff use daily, grouped by task with a short note on each.
Developer ToolsIBM i RPGLE Fully Free Program Skeleton Generator (SQL, MONITOR)
Fill in your table and columns and get a complete fully free ILE RPG program that reads rows with an SQL cursor, handles SQL and runtime errors, and compiles with one CRTSQLRPGI command.
More Developer Tools tools
See all- IBM i ILE RPG Status Codes and Common Error Messages Reference
- IBM i RPGLE Service Program Generator (NOMAIN, Binder Source, CRTSRVPGM)
- IBM i Journal Receiver Growth and Retention Calculator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
New to IBM i (AS/400) ERPs? Start with the IBM i (AS/400) ERPs guide and toolkit.
Keep exploring
Free tools
- IBM i Services (QSYS2 and SYSTOOLS) SQL ReferenceSearchable list of IBM i Services you can query with SQL from Run SQL Scripts, STRSQL or ODBC, with the CL command each replaces and a ready-to-run statement.
- IBM i System Values ReferenceA searchable table of the IBM i system values that matter for security, date handling, job limits and startup, with the reason each one is checked.
- IBM i (DB2 for i) SQL Data Extraction Script GeneratorGenerate DB2 for i SQL to inspect a file, count rows, and extract records with Julian date filters for JD Edwards World or other IBM i data.
ERP fixes and how-tos
- How to Add AI to an IBM i (AS/400) RPG Application Without Moving ItHow to add a private AI assistant to custom RPG applications on IBM i: Db2 for i access, field names, journals, RCAC security, local LLM, sizing and rollout.
- How to add a private AI layer to Infor XA on-premReference architecture to add AI to Infor XA on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- Infor XA REST API: expose XA through IBM i Integrated Web Services or IONHow to expose Infor XA (MAPICS) data and functions as REST on IBM i using Integrated Web Services or ION, with an example call and the safety rules for writes.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- SAP Field Service Management with SAP Business OneHow SAP Field Service Management, with Coresuite, syncs with SAP Business One service calls and billing: data flows, setup, pitfalls and a private AI layer.
- NetSuite Field Service Management (formerly NextService) for equipment manufacturersWhat NetSuite Field Service Management, formerly NextService, offers equipment makers: scheduling, dispatch, mobile app, asset history and work orders, plus setup tips.
Guides
- Manufacturing ERP Selection: A Structured Decision FrameworkSelect the right manufacturing ERP with a structured decision framework. Functional requirements, TCO analysis, vendor evaluation, and risk assessment.
- AI-Powered Test Generation for ERP Module TestingGenerate comprehensive ERP test cases with AI agents covering unit tests, integration tests, regression suites, and UAT scenarios for SyteLine, LN, and M3.
- Cable Assembly Quality Records: Crimp Validation, Pull Tests and TraceabilityWhat quality records a cable assembly or harness shop should keep: crimp validation, pull tests, test results per serial, nonconformance and lot genealogy.
AI on your ERP
- AI for Infor XA on IBM i: On-Prem, No Replatforming RequiredAdd AI to Infor XA on IBM i (AS/400) without a migration project. Read DB2 for i directly, ground answers in live XA data, keep everything on-prem.
- AI for Infor LX: A Private Layer on Top of Your IBM i InvestmentAdd a private AI layer to Infor LX on IBM i: natural-language answers over LX files and BODs, agents for MRP and order status, on-prem deployment.
Integrations
- How to use Claude with Infor XA on IBM iHow to use Claude with Infor XA on IBM i: MCP connectors, Anthropic API versus Bedrock or Vertex, enterprise data handling, and an on-prem alternative.
- How to add AI agents to Infor XA on IBM iHow to add AI agents to Infor XA on IBM i: a tool layer over Db2 for i and RPG programs, approval gates, on-prem models, and realistic expedite and exception flows.
Software
- IBM MaximoIBM Maximo explained: enterprise asset management modules, the integration framework, deployment options, limitations and alternatives for manufacturers.
- Oracle Field ServiceOracle Field Service schedules, routes and equips mobile workers within Oracle cloud applications. Modules, integrations, AI uses and alternatives.