Injection Press Startup and Shutdown Checklist
Most startup problems, from flash to a damaged mold, trace back to a skipped check. This checklist walks a setter through safety, material, mold, barrel and first-shot checks before production, and the steps to shut a press down properly.
0 of 42 items complete
13 critical items still open - these are the highest-risk gaps.
Safety and area before startup
Material and dryer
Mold and tooling
Barrel heat and settings
First shots and release to production
Shutdown
Every item marked critical must be complete before production or shutdown is signed off. Adapt the list to your press type, tool and resin, and follow the manufacturer's manual and your site safety procedures.
Capture startup checklists against work orders
Optional: we can outline how to store completed checklists with the tool, press and work order in your system.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through the groups in order at the beginning of each setup and again at shutdown. Tick each item as you confirm it and treat the critical items as hard stops: do not run the press with a failing interlock, with unverified lockout status, or with mold protection not set. Export the completed list to PDF or Excel to keep with the shift record. The list is a template, so remove items that do not apply and add steps specific to your presses and tools.
- Use it at every tool change, not only at the start of the week
- Keep a signed copy with the setup sheet for traceability
- Review the list after any incident or tool damage
Why order matters
Safety checks come first because an interlock or lockout error can injure someone. Material checks follow, because wet or wrong resin causes defects that look like process problems. Mold checks protect an expensive tool before it closes, and barrel heat soak prevents cold slugs and screw damage. Only then do you take first shots, inspect, and release the press to automatic. Skipping ahead is what leads to broken tools and long troubleshooting sessions.
Purging and shutdown
How you shut down affects the next startup. Purging the barrel removes resin that could degrade, which is especially important for heat sensitive materials like PVC or acetal and for color or material changes. If the press will sit idle, lower temperatures per procedure and protect the mold surfaces from rust. Record shot counts, scrap and any issues, so maintenance and the next shift have the information.
Common mistakes
Typical errors are leaving mold protection disabled after a trial, starting production before barrel heat soak is complete, forgetting to recheck dryer dew point, and failing to record resin lot. Another is turning off cooling water while the mold is still hot, which can crack hot runner components or cause condensation. Build the checklist into your MES or shift report so it is completed and stored for every setup.
Frequently Asked Questions
How long should the barrel soak before starting?
It depends on barrel size and resin. Many shops allow at least 20 to 30 minutes after the setpoints are reached so the whole barrel and screw are uniformly heated. Follow the machine and resin supplier guidance.
Why set mold protection before running?
Mold protection detects obstructions, such as a stuck part, and stops closing at low force. It protects the cavity and parting surfaces from crush damage, which is costly to repair.
When should I purge the barrel?
Purge at resin or color changes, before shutting down heat sensitive materials, and when you see degraded melt or black specks. Use a purge compound or compatible resin recommended by the supplier.
Does this checklist replace my site safety procedures?
No. It is a general template. Always follow the machine manual, local regulations and your site lockout and safety procedures, and adapt the list to your equipment.
If you want completed setup and startup checklists captured against the work order and tool in your ERP or MES, Netray can help design that workflow.
Related Tools
Injection Molding Process Sheet Template
A fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
MES & Shop FloorMold Changeover Time Log Worksheet
Log each mold change by phase, total the minutes and see which jobs miss your changeover target.
MES & Shop FloorMolding Shift Production Report Template
A shift report for a molding department capturing output, downtime, scrap and issues for the next shift.
Quality & InspectionResin Lot and Dryer Log Worksheet
Record resin lots, dryer settings and drying hours, and see at a glance which lots were under dried.
Quality & InspectionInjection Molding Defects, Causes and Fixes Reference
A searchable troubleshooting table for common molded part defects, with the usual causes and the first adjustments to try.
More MES & Shop Floor tools
See all- Scientific Molding Viscosity Curve Worksheet
- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- IFS Shop Order Status and Lifecycle Reference
- Plex Smart Manufacturing Data Source Request Template
- Plex Production Scheduling Checklist
- Plex Downtime Reason Log and OEE Worksheet