JD Edwards Work Order Status Codes Template
In JD Edwards EnterpriseOne the work order status field lives on the work order master (F4801) and is driven by user defined codes, so no two sites mean exactly the same thing by status 30 or 50. This worksheet lets you write down what each code means in your plant, who may move an order into it and what it allows.
| Status code | Description | Lifecycle phase | Owner role | Allowed next codes | Costs may post | Visible to planning | Business rule or note | |
|---|---|---|---|---|---|---|---|---|
The values above are examples only. Work order status codes are user defined codes (UDC system 00, type SS) and every site configures its own. Replace the rows with the codes in your own UDC table and your Shop Floor Management setup.
Status and aging report from your F4801 data
Optional: we can review your work order status design against live order data and suggest cleanup.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Start by pulling your current list from the UDC program (P0004A, system 00, type SS) and typing each code into a row. Then fill in the lifecycle phase, the role that owns the order in that status and the codes it may move to next. The last columns record whether costs may post and whether the order is still visible to planning. Export to Excel and review the result with production control, maintenance planning and cost accounting before you change any setup.
- One row per status code in your UDC table
- Write the allowed next codes as a short list, for example 30, 45, 99
- Use the note column for rules such as a mandatory hold reason
- Keep one worksheet per order type if types use different flows
Where status is controlled in JDE
Status behaviour is not one switch. The order type setup, the Shop Floor Management constants, the status code processing in Work Order Entry and any custom edits all influence which moves are allowed. Many sites also rely on the status to decide when material can be issued or hours can be entered. Documenting it in one place exposes conflicts, such as two codes that mean the same thing or a status that planning still reads after the order is complete.
Reading the finished design
Look for dead ends first: any code that has no allowed next code other than closed, and any code that nobody owns. Then check the cost and planning columns against reality. An order in a status that still posts cost but is invisible to planning is a common source of confusing variances. The count of defined codes is shown at the bottom, and a long list is usually a sign that holds, rework and approval states have been mixed into one field.
Common mistakes
The biggest mistake is copying codes from another site or from a blog and assuming they match yours. A second is adding a new code without checking reports, UBEs and custom code that test the status by value. Retest anything that filters on status when you change the list, including Orchestrator steps and integrations that read F4801.
- Treating examples as standard JDE values
- Adding codes without searching UBEs and BSFNs that hard code values
- Using status to carry both lifecycle and quality hold meaning
- Leaving the closed status open to edits
Frequently Asked Questions
Are JDE work order status codes the same everywhere?
No. They are user defined codes stored in UDC system 00, type SS, and each implementation sets its own values and descriptions. Some behaviour is tied to the code through setup, so always read your own UDC table instead of relying on a published list.
Which table holds the work order status?
The work order master table F4801 holds the current status of each order. History of status changes can also be captured in related tables depending on your setup, so check your configuration before relying on it for audit reporting.
Can I use this for plant maintenance work orders?
Yes. Maintenance orders use the same work order master with different order types and often a different status flow. Keep a separate worksheet per type and export each to Excel so approvals and reviews stay clear.
Does this tool change anything in JD Edwards?
No. It runs entirely in your browser and only produces a document. Any change to UDC values or Shop Floor setup must be made in your own JDE environment, tested in a non-production path first.
If you want status flow questions answered from your own F4801 data, for example how many orders sit in each status by age, Netray can connect an on-prem assistant to your JDE database with read-only access.
Related Tools
JD Edwards Table Reference (F4211, F4311, F0101, F4101, F4102)
Quick lookup of common JD Edwards tables with description, module, column prefix and the key fields you join on.
OracleJD Edwards UBE Job Scheduling Worksheet
Editable worksheet to plan and document scheduled UBE batch jobs with versions, queues, run windows, dependencies and owners.
Developer ToolsJD Edwards SQL Query Generator (Open Sales Order Lines)
Generates a read-only SQL Server query for open JDE sales order lines, with Julian date conversion, implied decimal handling and branch filters.
OracleJD Edwards Security Workbench Worksheet
Editable worksheet to record JD Edwards role security records by type, with the actions allowed, risk notes and approver for each.
More Oracle tools
See all- JD Edwards EnterpriseOne Core Table Reference
- Oracle EBS Discrete Job Statuses Reference
- Oracle EBS Inventory Transaction Types Reference
- Oracle EBS Item Attribute Template Worksheet
- Oracle EBS MRP Exception Messages Reference
- Oracle EBS BOM Interface Load Worksheet
- Oracle EBS Inventory Period Close Checklist
- Oracle EBS WIP Accounting Class Reference
- Oracle EBS Cycle Count Setup Worksheet
New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- JD Edwards System Codes ReferenceLook up what each JD Edwards system code stands for and how it shows up in table, application and UDC names.
- JD Edwards EnterpriseOne AI Assistant Sizing and Value CalculatorEstimate peak load, GPUs, index size, hours saved and payback for an on-prem AI assistant on JD Edwards EnterpriseOne.
- JD Edwards EnterpriseOne Private AI Layer Blueprint GeneratorFill in your JD Edwards EnterpriseOne version, database, hosting and users to get a shareable architecture plan for a private, on-prem AI assistant.
ERP fixes and how-tos
- How to Add a Private AI Layer to JD Edwards EnterpriseOne On-PremAdd a private AI layer to JD Edwards EnterpriseOne: AIS data service, Orchestrator, Security Workbench mapping, a local model and human approval.
- JD Edwards table conversion: how it works and how to run oneWhat a JD Edwards table conversion does to a JDE table's structure and data, when it runs in a package build, and how to run or design one manually.
- How to set up BI Publisher output for a JD Edwards reportJDE BI means BI Publisher: how to attach an RTF template to a JD Edwards EnterpriseOne UBE version, what to configure first, and why it may print the old way.
Runs with your ERP
- Oracle CPQ and JD Edwards EnterpriseOne: quote to sales orderHow Oracle CPQ integrates with JD Edwards EnterpriseOne: customer data into quotes, sales orders created from quotes, and status back, with setup and pitfalls.
- Vertex Tax Connectors with JD Edwards EnterpriseOneHow Vertex calculates sales, use and VAT tax for JD Edwards EnterpriseOne and World, plus Oracle EBS and Cloud ERP: integration model, flows, setup, pitfalls.
- RF-SMART Manufacturing Data Collection with JD Edwards EnterpriseOneHow RF-SMART collects work order completions, labor, lot and serial data and shop floor labels in JD Edwards EnterpriseOne, online or offline: setup, pitfalls.
AI on your ERP
- AI for JD Edwards EnterpriseOne Manufacturing, Without Leaving the F-Tables ExposedGrounded AI over JD Edwards EnterpriseOne Manufacturing: work orders, routings, and Orchestrator data, answered on-prem without sending F-table data to a public model.
- Private AI for Oracle ERP Data Across EBS, JD Edwards and FusionPrivate AI across Oracle ERP data: open-weight models on your GPUs over EBS, JD Edwards and Fusion, with ERP security and no external model calls.
Integrations
- How to add an AI chatbot to JD Edwards EnterpriseOneAdd an AI chatbot to JD Edwards EnterpriseOne: grounded in ERP data via AIS, for planners, buyers and customers, and able to run fully on-prem.
- How to add AI agents to JD Edwards EnterpriseOneHow to add AI agents to JD Edwards EnterpriseOne: Orchestrator and AIS as the tool layer, read-only first, human approval on writes, on-prem models.