Developer ToolsFree calculatorPDF, Excel, Word export

MCP Server End-to-End Availability Calculator

An agent answer needs the identity provider, the MCP server, the ERP API and the model to all be up. Their availabilities multiply, so the chain is weaker than any single link.

Your numbers

%
1 replicas

Assumes independent failures behind a load balancer.

%
%
%
days

Your results

End-to-end availability
98.4%
Expected downtime in period
687.3 min
MCP tier availability with replicas
99.5%
Expected downtime in hours
11 hrs
Weakest component availability
99.5%

Assumes independent failures and all components required for every request. Correlated failures, shared hosts and maintenance windows make real availability lower.

Free, optional. Reopen it on any device.
Save results:

End-to-end availability by MCP replica count

Sweeps Active replicas of the MCP server from 1 to 5, holding your other inputs fixed.

Availability design review

We can walk through your agent request path and single points of failure. Optional.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter each component's availability as a percentage from your monitoring or contract. Use measured values where you have them rather than the vendor's marketing figure. Set the number of active MCP replicas to see the effect of redundancy at that tier. The outputs give end-to-end availability, expected downtime in the period and the weakest link. The chart sweeps replicas from one to five and shows how quickly redundancy helps the one tier you control.

Formula

For components in series, availability is the product of the individual availabilities. For n independent active replicas, tier availability is one minus (one minus a) to the power n. Downtime equals (1 minus overall) times the minutes in the period. Four components at 99.5, 99.5, 99.9 and 99.5 percent combine to about 98.4 percent, which is roughly eleven hours of downtime a month, much worse than any single figure suggests.

  • Replicas fix only the tier they sit on.
  • Shared database or host breaks independence.
  • Graceful degradation, such as cached answers, changes the model.

Using the result

If the total is below what users need, find the weakest link first. Often it is the ERP, which you cannot replicate, so add read replicas or cached views for read-only agent queries. Self-hosting the model removes an external dependency but adds your own GPU availability to the chain. Document which failures should produce a clear error message rather than a silent wrong answer.

Frequently Asked Questions

Why is combined availability lower than each part?

Because a request succeeds only if every required component is up at that moment. Independent failures accumulate, so the probabilities multiply, and the product is always lower than the weakest single value.

Do replicas always help?

Only if failures are independent. Replicas on one host, one database or one deployment pipeline share failure modes. Spread across nodes and avoid shared single points to see the computed benefit.

What does 99.9 percent mean per month?

About 43 minutes of downtime in a 30 day month. 99.5 percent allows about three and a half hours, and 99 percent about seven hours. Use the downtime output for your own period.

Should I include planned maintenance?

Yes if it makes the service unavailable to users. Either reduce the stated availability by the maintenance share or schedule it outside business hours and report availability for working hours.

Netray designs on-prem agent stacks with read-only ERP access and fallbacks. We can help set realistic availability targets for your stack.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations