Medical Device Lot Start Quantity and Rolled Throughput Yield Calculator
If a work order starts the exact order quantity, it will ship short. Device lines lose units to molding defects, assembly rejects, failed seals, inspection and sterilization, and they must also set aside release samples. This calculator solves for the quantity to start, so the lot ships complete the first time.
Your numbers
Damage, biological indicator and process challenge losses.
Units that will be consumed by release testing and retained, so they cannot ship.
Blended cost at the average point of loss.
Your results
Assumes step yields are independent and applied in series. Use measured first-pass yields from the last several lots, and update the factor if the process changes.
Start quantity vs assembly yield
Sweeps Assembly yield from 85 to 100, holding your other inputs fixed.
Derive yield factors from real lot history
Optional: we can compute step yields from your work order history and suggest planning factors.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the shippable quantity the order needs and the measured first-pass yield for each major step. If your process has more or fewer steps, fold two steps into one yield or set an unused step to 100. Add the units consumed by release testing and retains, a small planning overage, and an average cost for a lost unit. The calculator returns rolled yield, the lot start quantity, expected losses and the dollar cost of yield loss. The sweep shows how sensitive start quantity is to your weakest step.
- Use first-pass yield, not final yield after rework, for each step
- Include sterilization loss even if it is small
- Add release samples and retains because they never ship
- Revisit the overage after every five or ten lots of history
Formula and source
Rolled throughput yield is the product of the individual step yields: RTY = Y1 x Y2 x ... x Yn, a standard Six Sigma and lean metric. The required start quantity is the quantity that must emerge, which is shippable units plus retains, divided by RTY and scaled by the overage. For example, steps at 97, 96.5, 98.5 and 99 percent with 0.8 percent sterilization loss give about 91 percent rolled yield, so shipping 5,000 units with 60 retains needs a start of roughly 5,600 units.
Using the result in your ERP
Most ERPs accept a scrap or yield factor on the item or routing, such as the scrap percent on a BOM component or the yield percent on an operation. Use the start-to-ship ratio as a cross-check on those settings rather than as a replacement. Keep one yield assumption in one place so planners, buyers and costing agree. If actual yield consistently beats the factor, you are over-buying material and over-building. If it falls short, you are shipping partial lots and expediting.
Common mistakes
Averaging yields across different products hides a problem on the one that matters. Using final yield after rework understates the capacity consumed by rework loops. Forgetting that retains and sterilization samples reduce shippable output is another frequent error. For product with a hard cap on quantity, such as a customer-supplied serialized component, the overage may need to be zero and the yield assumption validated tightly. Always treat the result as a plan, then compare to actual lot results.
Frequently Asked Questions
What is rolled throughput yield?
It is the probability that a unit passes through every step without defect or rework, found by multiplying the first-pass yield of each step. It is always lower than the lowest individual step yield, which is why many small losses add up.
Should sterilization loss be included?
Yes, if units can be damaged or consumed during sterilization or handling. Include biological indicator units and any product used for process challenge testing. Even a small percentage matters on a high volume order.
How much overage should I add?
Enough to cover normal variation in yield between lots without building a large surplus. Many planners start at 1 to 3 percent and tune it from lot history. Product with hard quantity caps or expensive components usually needs a smaller cushion.
Can I use this for non-medical products?
Yes. The yield math is general. The medical-specific parts are the retains, release samples and sterilization loss, which you can set to zero for other products.
If you want yield factors derived from actual lot history in your ERP and fed back into planning automatically, that is a task we can help you build.
Related Tools
Medical Device PPQ Lot Count and Validation Cost Calculator
Costs a process performance qualification build from lot count, lot size, unit cost, destructive samples, test cost, labor and line downtime, and nets off units you can sell.
Costing & FinanceMedical Device NCR Labor, Rework and Scrap Cost Calculator
Builds a cost per NCR and an annual cost from NCR volume, burdened labor, MRB time, rework and scrap mix, and CAPA escalation rate. Includes a volume sweep.
Quality & InspectionMedical Device Lot Reconciliation and Genealogy Worksheet
Row-by-row lot reconciliation with yield and unaccounted-unit columns, plus component lot and sterilization lot links for genealogy. Exports to Excel.
Costing & FinanceScrap Adjusted Product Cost and Price Calculator
Calculate cost per good unit after material scrap and process yield, then the selling price needed for a target gross margin.
More MES & Shop Floor tools
See all- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- IFS Shop Order Status and Lifecycle Reference
- Plex Smart Manufacturing Data Source Request Template
- Plex Production Scheduling Checklist
- Plex Downtime Reason Log and OEE Worksheet
- Plex Go-Live Readiness Sign-Off Template
Keep exploring
Free tools
- SyteLine Scrap, Yield and Start Quantity CalculatorCalculate rolled yield across three operations and the start quantity a SyteLine job needs to deliver the required good units.
- Medical Device Lot Reconciliation and Genealogy WorksheetRow-by-row lot reconciliation with yield and unaccounted-unit columns, plus component lot and sterilization lot links for genealogy. Exports to Excel.
- Oracle EBS Operation Yield and Start Quantity CalculatorTurn routing operation yields and component shrinkage into the start quantity and component requirement for a job.
Guides
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
- Using AI to Review Device History Records Before Lot ReleaseHow a medical device contract manufacturer can use private AI to pre-check device history records for missing entries, cert mismatches and out-of-spec data.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.