Quality & InspectionFree worksheetPDF, Excel, Word exportMedical Devices

Medical Device Lot Reconciliation and Traceability Worksheet

Every device lot should reconcile: units started equal units shipped, scrapped, held, consumed in testing or retained. If the numbers do not close, you either have a counting error or a missing unit, and either one is a finding. This worksheet does the arithmetic and links each lot to the component and sterilization lots that make recalls and investigations fast.

Free, optional. Reopen it on any device.
Download:
Finished lot numberDevice part numberCritical component lot(s)Sterilization lot / loadUnits startedGood units to stockScrappedOn rework or holdSamples and retainsUnaccounted unitsInvestigate flag (1 = yes)Yield to stockManufacture date
0
0
93.2%
0
0
93.9%
0
0
93.6%
3
1
91.1%
1
1
93.5%
2
1
93%
Total units started
5,400
Total good units
5,026
Total scrapped
174
Total unaccounted units
6
Lots to investigate
3
Overall yield to stock
93.1%
Overall scrap rate
3.2%
Unaccounted rate
0.1%

Example rows are illustrative. Two lots in the sample data have unaccounted units to show how the flag works. Reconcile to zero or document the explanation in the DHR before release. Keep the sheet under document control if it forms part of a quality record.

Generate lot reconciliation from your ERP

Optional: we can build a lot reconciliation and genealogy report straight from your work orders and inventory transactions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the worksheet

Add one row per finished lot. Record the units started, good units moved to stock, scrapped, on rework or hold, and samples or retains. The unaccounted column calculates automatically, and the flag column shows 1 when it is not zero. Record the key component lot and the sterilization load so you can trace in both directions. Export to Excel for attachment to the device history record, or keep the sheet as a working log during production.

  • Close every lot to zero unaccounted units before release
  • Record rework quantities even if they return to stock later
  • Use the same lot format as your labels and UDI production identifier
  • Add rows for multiple component lots if the genealogy needs them

Why reconciliation and traceability matter

ISO 13485 clause 7.5.9 requires documented procedures for traceability, and for implantable devices requires records of components, materials and the work environment conditions that could cause the device to not meet its requirements. Clause 7.5.1 requires a record for each medical device or batch that identifies the quantity manufactured and approved for distribution. Reconciliation is the control that proves those two numbers are credible. UDI regulation also expects the production identifier, usually lot or batch, on the label and in the records.

Interpreting the flags and yield

A non-zero unaccounted count means units were miscounted, mislabeled, lost, or moved without a transaction. Investigate before the lot is released, because a missing unit in a sterile device lot may be a unit in the wrong package. A yield that drifts down lot over lot is an early warning for a tooling or material issue, and should feed your trending. Compare the overall yield with the planning factor used in your ERP. If the sheet shows 93 percent and your planning factor assumes 97, expect short shipments.

Common mistakes

Teams often record sample quantities only on the test record, so the lot never closes. Another is to adjust the good count to force reconciliation, which hides the real loss and defeats the purpose. Rework quantities that return to stock should be added back through a documented transaction with a new inspection. Finally, link the sterilization load and the component lots on the same row, or a recall scope question will take days rather than minutes.

Frequently Asked Questions

What must a device history record show about quantity?

Under 21 CFR 820.184 and ISO 13485 clause 7.5.1, the record identifies the dates of manufacture, quantity manufactured and quantity released for distribution, along with acceptance records and labeling. A reconciliation like this one supports those quantities.

How exact does the reconciliation need to be?

For finished devices, it should close to the unit. Tolerances, if allowed at all, should be defined in a procedure and justified by risk. Bulk materials such as resin or adhesive can be reconciled by weight with a stated tolerance.

Do I need component lot numbers for every device?

Not necessarily. The required depth depends on the device risk class and your procedure. Implantables require more extensive traceability. Record the lots of components that affect safety or performance, and any your customer or regulator specifies.

Can I use this as the DHR?

It supports the DHR but does not replace it. The DHR also includes acceptance records, the primary identification label and labeling, and device identification and control numbers. Attach the reconciliation to the record.

If your lot, component and sterilization data live in your ERP or MES, we can generate this reconciliation automatically for every lot at release.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Software