FDA 21 CFR Part 820 to ISO 13485 Clause Crosswalk
Many US device manufacturers wrote their procedures against the old Quality System Regulation and now need to show they meet ISO 13485 as well. This crosswalk lines up the familiar 21 CFR 820 sections with the closest ISO 13485 clause so you can see where each procedure lives.
| 21 CFR 820 section (legacy QSR) | Topic | Closest ISO 13485 clause | Note |
|---|---|---|---|
820.20 | Management responsibility | 5 Management responsibility | Includes quality policy, planning and management review |
820.20(c) | Management review | 5.6 Management review | ISO 13485 specifies review inputs and outputs in more detail |
820.22 | Quality audit | 8.2.4 Internal audit | Audit procedure, auditor independence, follow-up |
820.25 | Personnel, training | 6.2 Human resources | Competence, training and awareness |
820.30 | Design controls | 7.3 Design and development | Planning, inputs, outputs, review, verification, validation, transfer, changes |
820.40 | Document controls | 4.2.4 Control of documents | Approval, distribution, change control of documents |
820.50 | Purchasing controls | 7.4 Purchasing | Supplier evaluation, purchasing information, verification of purchased product |
820.60 | Identification | 7.5.8 Identification | Product identification through all stages |
820.65 | Traceability | 7.5.9 Traceability | Required for implants and life-supporting devices in particular |
820.70 | Production and process controls | 7.5.1 Control of production and service provision | Includes environmental control, personnel health, equipment |
820.72 | Inspection, measuring and test equipment | 7.6 Control of monitoring and measuring equipment | Calibration and calibration records |
820.75 | Process validation | 7.5.6 Validation of processes for production and service provision | Validation where results cannot be fully verified by inspection |
820.80 | Receiving, in-process and finished device acceptance | 7.4.3 and 8.2.6 Monitoring and measurement of product | Acceptance criteria and release records |
820.86 | Acceptance status | 7.5.8 and 8.2.6 | Status identification through the process |
820.90 | Nonconforming product | 8.3 Control of nonconforming product | Disposition, rework, concessions |
820.100 | Corrective and preventive action | 8.5.2 Corrective action, 8.5.3 Preventive action | Investigation, verification of effectiveness |
820.120 | Device labeling | 7.5.1 and 4.2.3 as applicable | Labeling control requirements are partly regulatory rather than in the standard |
820.130 | Device packaging | 7.5.11 Preservation of product | Packaging and handling that protect product |
820.140 | Handling | 7.5.11 Preservation of product | Handling that prevents mix-ups, damage, contamination |
820.150 | Storage | 7.5.11 Preservation of product | Storage areas and receipt and dispatch authorization |
820.160 | Distribution | 7.5.1 and 7.5.11 | Distribution records and review of orders |
820.170 | Installation | 7.5.3 Installation activities | Where installation is a requirement of the device |
820.180 | General records requirements | 4.2.5 Control of records | Retention periods set by device life and regulation |
820.181 | Device master record | 4.2.3 Medical device file | ISO 13485 uses the medical device file concept |
820.184 | Device history record | 7.5.1 Production records | Per batch or unit production record |
820.198 | Complaint files | 8.2.2 Complaint handling | Includes evaluation for reportability |
820.200 | Servicing | 7.5.4 Servicing activities | Service records and analysis |
820.250 | Statistical techniques | 8.1 and 8.4 Analysis of data | Valid statistical methods for sampling and analysis |
Since the Quality Management System Regulation (QMSR) took effect, 21 CFR Part 820 incorporates ISO 13485 by reference and keeps some FDA-specific requirements. The legacy section numbers in this table are a familiar index for existing procedures, and the mapping is approximate. Read the current text of Part 820 and ISO 13485 before relying on it in an audit response.
Optional QMSR gap assessment walk-through
We can review how your ERP and QMS records line up against the crosswalk areas.
Optional. The tool and every export work without this. No spam.
How to use it
Search by topic (for example complaint, traceability or calibration) and read across to the matching clause. Export the list to Excel and add columns for your procedure number, current revision, owner and gap status. Reviewing one row at a time during a gap assessment is faster than reading both documents end to end, and it gives auditors a clear map of where each requirement is addressed.
- Search by topic, section or clause number
- Export and add procedure and gap columns
- Treat the mapping as an index, not a conformity claim
Where the two frameworks differ
ISO 13485 is organized by management, resources, realization and measurement, while the legacy QSR was organized by subpart. The content overlaps heavily, but ISO 13485 adds explicit requirements around risk management throughout the life cycle, software validation, and a stronger link to regulatory requirements. FDA retains specific expectations, for example around medical device reporting and certain labeling and unique device identification requirements.
Using the crosswalk for a gap assessment
For each row, locate the procedure that implements the requirement, confirm it cites the right documents and records, and sample recent records to check it is followed. Note any ISO 13485 clause with no procedure, any FDA-specific requirement not covered by the standard, and any procedure that still cites only legacy section numbers. Prioritize gaps by patient risk and audit exposure.
Common mistakes
Teams sometimes assume that holding an ISO 13485 certificate means full compliance with FDA-specific requirements, or rename procedures without updating the underlying content. Others forget records such as the device master and history record, which ISO 13485 handles through the medical device file and production records. Keep a controlled version of the crosswalk and update it when regulations or procedures change.
Frequently Asked Questions
Is this crosswalk an official FDA document?
No. It is an unofficial orientation aid by topic. FDA and ISO publish the authoritative texts, and the mapping here is approximate because some requirements do not align one for one.
Why use legacy section numbers if the regulation changed?
Many procedures, audit findings and training records still use the legacy numbering. A familiar index helps teams find where each topic moved to under the current structure.
What does ISO 13485 add compared with the QSR?
It places more emphasis on risk based approaches across processes, on software validation for quality system tools, on supplier controls and on documenting regulatory requirements. Check the current standard for the details.
Does the crosswalk cover MDSAP or EU MDR?
No. It covers the US regulation and ISO 13485 only. MDSAP and EU MDR add jurisdiction-specific requirements that need separate mapping.
If device history records and complaint data sit in your ERP and a separate QMS, Netray can discuss connecting them so audit evidence is easier to pull.
Related Tools
Medical Device Standards Reference Table (ISO, IEC, ASTM)
A searchable lookup of the standards that medical device manufacturers cite in the QMS, design file and technical documentation, with area and typical use.
Compliance & ContractsEU MDR Technical Documentation Readiness Assessment
A short self-assessment of how complete and current your technical documentation is against the structure of MDR Annexes II and III.
Quality & InspectionISO 10993 Biocompatibility Parts Reference Table
Look up what each part of the ISO 10993 series covers and which biological endpoint or evaluation step it supports.
Developer ToolsDevice Lot Genealogy and Traceability SQL Generator
Build recursive lot genealogy queries for backward trace (finished device to components) and forward trace (component lot to shipped devices) using your own table and column names.
More Compliance & Contracts tools
See all- FDA Form 483 Response Letter Template
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
Keep exploring
Free tools
- ISO 13485 Gap Analysis TemplateEditable clause-by-clause ISO 13485:2016 gap analysis worksheet that shows how each clause compares with ISO 9001 and scores your gap.
- ISO 13485 Quality Plan Template with Medical Device File ExampleA fill-in ISO 13485 quality plan with a medical device file content example and a clause compliance checklist table.
- ISO 13485 Document TemplatesAn editable ISO 13485 template set covering a quality manual outline, a software validation plan for ERP and quality software, and a supplier quality agreement.
Guides
- ERP for Medical Device Manufacturing: Compliance, Traceability, and ValidationERP for medical device manufacturing: FDA 21 CFR Part 820, ISO 13485, UDI and DHR traceability requirements, plus vendor fit and implementation guidance.
- ISO 13485 ERP Requirements for Medical Device Contract ManufacturersWhat ISO 13485 and FDA QMSR actually require of an ERP at a medical device contract manufacturer: records, traceability, change control and software validation.
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
AI on your ERP
- AI on Your ERP for Medical Device Manufacturing Under QMSR and ISO 13485Private AI on your ERP for medical device makers: DHR assembly, UDI, complaints, CAPA and supplier controls under FDA QMSR and ISO 13485, kept on your own infrastructure.
- AI for QAD in Medical Devices: Traceability, DHR Review and CAPA Trends Without Exposing Regulated DataPrivate, read-only AI on QAD for medical device makers: DHR review, UDI and lot traceability, CAPA and complaint trends under FDA QMSR and ISO 13485.
Manufacturing hubs
- MDMA, AdvaMed and medical device manufacturing: regulation, ERP and AI realitiesMDMA and AdvaMed medical device manufacturing: FDA QMSR, ISO 13485, UDI and EU MDR, plus the ERP, traceability and private AI issues device makers face.
- Medical Device Manufacturing in Minneapolis-St. PaulMedical device manufacturing in Minneapolis-St. Paul: ecosystem, FDA and ISO 13485 requirements, and ERP, quoting and document problems contract makers face.