ISO 10993 Biocompatibility Parts Reference Table
ISO 10993 is a series, not one document, and teams often cannot remember which part covers cytotoxicity, sensitization or chemical characterization. This reference lists each part with its subject and the situation in which it normally matters.
| Part | Subject | Group | When it matters |
|---|---|---|---|
ISO 10993-1 | Evaluation and testing within a risk management process | Framework | Starting point: defines the biological evaluation process and how to categorize contact |
ISO 10993-2 | Animal welfare requirements | Framework | Whenever animal studies are considered or commissioned |
ISO 10993-3 | Tests for genotoxicity, carcinogenicity and reproductive toxicity | Toxicity endpoint | Long-term or implanted contact, or when chemical data raises concern |
ISO 10993-4 | Selection of tests for interactions with blood | Toxicity endpoint | Devices contacting circulating blood |
ISO 10993-5 | Tests for in vitro cytotoxicity | Toxicity endpoint | Almost every body-contact device as a baseline endpoint |
ISO 10993-6 | Tests for local effects after implantation | Toxicity endpoint | Implants and devices with tissue or bone contact |
ISO 10993-7 | Ethylene oxide sterilization residuals | Sterilization residuals | Any device sterilized with ethylene oxide |
ISO 10993-9 | Framework for identification and quantification of potential degradation products | Degradation | Devices expected to degrade or corrode in the body |
ISO 10993-10 | Tests for skin sensitization | Toxicity endpoint | Skin, mucosal and tissue contact devices |
ISO 10993-11 | Tests for systemic toxicity | Toxicity endpoint | Where leachables could reach the body systemically |
ISO 10993-12 | Sample preparation and reference materials | Method support | Preparing extracts for any test, choosing extraction conditions |
ISO 10993-13 | Identification and quantification of degradation products from polymeric medical devices | Degradation | Absorbable or degradable polymers |
ISO 10993-14 | Identification and quantification of degradation products from ceramics | Degradation | Ceramic implants and coatings |
ISO 10993-15 | Identification and quantification of degradation products from metals and alloys | Degradation | Metallic implants, corrosion and ion release |
ISO 10993-16 | Toxicokinetic study design for degradation products and leachables | Degradation | When absorption and distribution data are needed for risk assessment |
ISO 10993-17 | Establishment of allowable limits for leachable substances | Chemical | Toxicological risk assessment of extractables and leachables |
ISO 10993-18 | Chemical characterization of medical device materials within a risk management process | Chemical | Material characterization to support or reduce biological testing |
ISO 10993-19 | Physico-chemical, morphological and topographical characterization of materials | Chemical | Surface and bulk property characterization |
ISO 10993-20 | Principles and methods for immunotoxicology testing of medical devices | Toxicity endpoint | Where immunotoxicity is a specific concern |
ISO/TS 10993-22 | Guidance on nanomaterials | Chemical | Devices containing or releasing nanomaterials |
ISO 10993-23 | Tests for irritation | Toxicity endpoint | Irritation assessment, including in vitro approaches |
Which endpoints are required for your device depends on the nature and duration of body contact, your risk assessment and the regulator's expectations. This table lists what each part covers, it does not decide your test plan. Check current editions and any FDA guidance on the use of ISO 10993-1.
Optional review of your biological evaluation workflow
We can look at how material and supplier changes reach your biological evaluation review.
Optional. The tool and every export work without this. No spam.
How to use it
Search by endpoint word (such as sensitization or blood), by part number or by group. Use the When it matters column to confirm that a part is relevant before you buy it or specify a test. Export the list to Excel and add columns for your device, the decision (test, justify, not applicable) and the report reference to form the skeleton of a biological evaluation plan.
- Search by endpoint or part number
- Group column separates endpoints from method support
- Export and add your own decision and report columns
The logic behind the series
Part 1 puts biological evaluation inside the risk management process. Devices are categorized by the nature of body contact and its duration, and that categorization guides which biological effects to consider. Many effects can now be addressed with chemical characterization (Part 18) and toxicological risk assessment (Part 17) rather than by animal testing, which is why those parts are widely used in modern plans.
Worked example
A single-use polymer surgical instrument that touches tissue briefly and is sterilized with ethylene oxide would normally start from Part 1 for categorization, use Part 12 for extract preparation, include Part 5 for cytotoxicity, Part 10 for sensitization and Part 23 for irritation as justified, and address EO residuals under Part 7. Material chemistry data from Part 18 can support the case for omitting other tests.
Common mistakes
Typical problems are testing every endpoint by habit without a rationale, citing superseded editions, changing a material or supplier without reassessing the evaluation, and forgetting that sterilization residuals and aging can change the biological profile. Treat the biological evaluation as a living part of the risk file and link it to design change control.
Frequently Asked Questions
Which ISO 10993 parts do I need for every device?
There is no fixed list. Part 1 is the starting point and the endpoints you address depend on body contact category, duration and your risk assessment. Cytotoxicity is the endpoint most commonly considered for devices that touch the body.
Why are some parts missing?
Some numbers were withdrawn or are not part of the series. Part 8 was withdrawn, and not every number has been published. Always check the current catalogue of the issuing body for the full list.
Can chemical characterization replace biological testing?
In some cases it can reduce or justify omitting tests, provided the characterization and toxicological risk assessment are adequate and the regulator accepts the rationale. It is a decision documented in the evaluation, not an automatic substitution.
Does FDA accept the same endpoints as EU MDR?
Both reference ISO 10993-1, but FDA publishes its own guidance on its use and may expect specific endpoints or presentations. Review current FDA guidance and your notified body expectations for your device.
If supplier material changes are not triggering your biological evaluation review, Netray can talk through connecting ERP material and supplier change records to your change control.
Related Tools
Medical Device Standards Reference Table (ISO, IEC, ASTM)
A searchable lookup of the standards that medical device manufacturers cite in the QMS, design file and technical documentation, with area and typical use.
Compliance & ContractsEU MDR Annex VIII Classification Rules Reference
A searchable summary of the 22 classification rules in Annex VIII of Regulation (EU) 2017/745 with the class each rule typically leads to.
Compliance & ContractsEU MDR Technical Documentation Readiness Assessment
A short self-assessment of how complete and current your technical documentation is against the structure of MDR Annexes II and III.
Compliance & ContractsFDA 21 CFR 820 to ISO 13485 Clause Crosswalk
Map each 21 CFR 820 quality system topic to the corresponding ISO 13485 clause to speed up QMSR gap assessments and procedure rewrites.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Device History Record (DHR) Template
- ISO 13485 Internal Audit Checklist
- Process Validation IQ OQ PQ Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Sterilization Load Record Template
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
Keep exploring
Free tools
- ISO 13485 Quality Plan Template with Medical Device File ExampleA fill-in ISO 13485 quality plan with a medical device file content example and a clause compliance checklist table.
- Medical Device Standards Reference Table (ISO, IEC, ASTM)A searchable lookup of the standards that medical device manufacturers cite in the QMS, design file and technical documentation, with area and typical use.
- Medical Device Supplier Evaluation Scoring WorksheetWeighted scoring of critical and non-critical suppliers with approval status, for ISO 13485 clause 7.4 purchasing controls.
ERP fixes and how-tos
- IFS Cloud: How to Set Up Parts, Find Help and Use Web DevtoolsSet up a part in IFS Cloud from Part Catalog to Inventory, Purchase and Sales part, and learn where the built-in help, user guide and developer tools are.
- Paperless Parts API Documentation and ERP IntegrationWhere to find Paperless Parts API documentation, how ERP connectors and webhooks fit, what to know about SSO, workflow and nesting, and how to connect a job shop ERP.
Runs with your ERP
- Vertex O Series and Infor CloudSuite: sales tax and VAT calculationHow Vertex O Series indirect tax is configured in Infor CloudSuite for sales, use and VAT calculation, with data flows, setup, pitfalls and a private AI layer.
- Vertex O Series with Accelerator+ for SAP S/4HANAHow Vertex O Series calculates indirect tax for SAP S/4HANA and ECC across order-to-cash and procure-to-pay using certified connectors. Setup and pitfalls.
Guides
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
- ISO 13485 ERP Requirements for Medical Device Contract ManufacturersWhat ISO 13485 and FDA QMSR actually require of an ERP at a medical device contract manufacturer: records, traceability, change control and software validation.
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
AI on your ERP
- AI on Your ERP for Medical Device Manufacturing Under QMSR and ISO 13485Private AI on your ERP for medical device makers: DHR assembly, UDI, complaints, CAPA and supplier controls under FDA QMSR and ISO 13485, kept on your own infrastructure.
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
Manufacturing hubs
- Massachusetts manufacturing: defense electronics, robotics and medical devicesMassachusetts manufacturing guide: defense electronics, robotics and medical devices, local ecosystem, ITAR, ISO 13485 and CMMC needs, ERP and private AI for shops.
- MDMA, AdvaMed and medical device manufacturing: regulation, ERP and AI realitiesMDMA and AdvaMed medical device manufacturing: FDA QMSR, ISO 13485, UDI and EU MDR, plus the ERP, traceability and private AI issues device makers face.